This is a bid form for the Beckett Bridge Water Main and Force Main Relocation project in Tarpon Springs, Florida. The project involves installing approximately 1,150 feet each of new 8-inch potable water main and new 12-inch wastewater force main using horizontal directional drilling (HDD) technology. The base bid (Part A) encompasses 25 line items including mobilization, pre-construction video-audio documentation, maintenance of traffic, water main and force main installation via open cut and HDD methods, ductile iron fittings, service connections, tapping sleeves and valves, line stops, concrete deadman/thrust blocks, air release valve assemblies, gate valves, fire hydrant assemblies, asphalt milling and restoration, flowable fill, grout fill and abandonment of existing mains, site restoration, and an owner's contingency allowance. Three alternative bid options are also included: Part B offering Certa-Lok PVC DR-14 materials for 1,100 linear feet of 8-inch water main and 1,150 linear feet of 12-inch force main; Part C providing C-900 Fusible PVC DR-14 alternatives for the same quantities; and Part D offering HDPE DR-9 materials for 1,100 linear feet of 12-inch water main and 1,150 linear feet of 16-inch force main.

The bid form requires contractors to provide unit prices and total costs for each line item across all bid parts, with final bid totals calculated as Part A plus one of the three alternative parts (B, C, or D). The estimated project magnitude ranges between $2,000,000 and $4,000,000. The form does not specify response dates, due dates, site visit requirements, bidder's meetings, or award dates within the visible content, nor does it detail pricing terms, set-asides, incumbent information, or specific funding sources and amounts.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Beckett Bridge Force Main and Water Main Relocation

QTY UNIT UNIT PRICE TOTAL

1 Mobilization 1 LS $ $

2 Pre-construction Video-Audio 1 LS $ $

3 Maintenance of Traffic 1 LS $ $

4 6” C-900 PVC DR18 Water Main by Open Cut 350 LF $ $

5 8” C-900 PVC DR18 Water Main by Open Cut 60 LF $ $

6 12” C-900 PVC DR18 Force Main by Open Cut 50 LF $ $

7 2” Certa-lok Yelomine IPS PVC Water Main by HDD 425 LF $ $

8 Ductile Iron Fittings 1.25 TN $ $

9 1” Single Service Connection (Long Side) 2 EA $ $

10 1” Single Service Connection (Short Side) 1 EA $ $

11 12-inch Tapping Sleeve and Valve 2 EA $ $

12 6-inch Tapping Sleeve and Valve 1 EA $ $

13 12" Line Stop 2 EA $ $

14 Concrete Deadman/Thrust Blocks 4 EA $ $

15 Air Release Valve Assembly 4 EA $ $

16 6" MJ RWGV 2 EA $ $

17 8" MJ RWGV 1 EA $ $

18 12" MJ RWGV 1 EA $ $

19 Fire Hydrant Assembly (with 6" RWGV) 2 EA $ $

20 1.5-inch Asphalt Milling 700 SY $ $

Part A - Base Bid

BID ITEMS

21 1.5-inch SP-9.5 Asphalt Restoration 700 SY $ $

22 Flowable Fill 15 CY $ $

Grout Fill and Abandonment of Existing Water Main and Force

Main

80 CY $ $

24 Site Restoration 1 LS $ $

25 Owner’s Contingency Allowance 1 LS $ $

QTY UNIT UNIT PRICE TOTAL

1B 8” Certa-Lok PVC DR-14 Water Main by HDD 1,100 LF $ $

2B 12” Certa-Lok PVC DR-14 Force Main by HDD 1,150 LF $ $

QTY UNIT UNIT PRICE TOTAL

1C 8" C-900 FUSIBLE PVC DR-14 Water Main by HDD 1,100 LF $ $

2C 12" C-900 FUSIBLE PVC DR-14 Force Water Main by HDD 1,150 LF $ $

QTY UNIT UNIT PRICE TOTAL

1D 12" HDPE DR-9 Water Main by HDD 1,100 LF $ $

2D 16" HDPE DR-9 Force Main by HDD 1,150 LF $ $

BID ITEMS

Part D - HDPE BID Items

BID ITEMS

PART B - BID TOTAL (ITEMS 1B-2B)

PART C - BID TOTAL (ITEMS 1C-2C)

PART A - BASE BID TOTAL (ITEMS 1-25)

Part B - Certa-Lok Bid Items

BID ITEMS

Part C - Fusible PVC BID Items

BID TOTAL (PART A + PART B)

BID TOTAL (PART A + PART C)

BID TOTAL (PART A + PART D)

PART D - BID TOTAL (ITEMS 1D-2D)