This is a General Permit Notification of Acceptance issued by the Florida Department of Environmental Protection (FDEP) Southwest District Office to the City of Tarpon Springs for the Beckett Bridge Water Main & Force Main Relocation Project. The permit authorizes the construction of a domestic wastewater collection/transmission system, specifically a twelve-inch diameter force main pipe in Pinellas County. The project involves installing approximately 1,150 feet each of new 8-inch potable water main and 12-inch wastewater force main sub-aqueously in the vicinity of Beckett Bridge using horizontal directional drilling, with an estimated construction cost between $2,000,000 and $4,000,000. The permit was issued on April 21, 2022, with an expiration date of April 20, 2027. Raymond Page, Utilities Superintendent for the City of Tarpon Springs, is listed as the permittee, with engineering support provided by Ardurra Group, LLC.

The permit requires the permittee to comply with Florida Administrative Code Rule 62-4.540 regarding general permit conditions and stipulates that the project must conform to the description contained in the original notification/application. Before placing the facilities into operation, the City must submit Form 62-604.300(8)(b) requesting Department approval and cannot place the system into service until cleared by FDEP. The permit cannot be revised except for transfer and will expire five years from issuance; if the project remains incomplete at expiration, a new permit must be obtained to continue work. The permittee must report any abnormal events or unauthorized wastewater spills exceeding 1,000 gallons to the State Watch Office within 24 hours, with smaller spills reported to the FDEP Southwest District Office within the same timeframe. The permittee is responsible for obtaining any required dredge and fill permits separately.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

www.FloridaDEP.gov

FLORIDA DEPARTMENT O F

Environmental Protection

Southwest District Office

13051 North Telecom Parkway #101

Temple Terrace, Florida 33637-0926

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton

Secretary

April 21, 2022

PERMIT NUMBER: CS52-0117033-125-DWC/CG

ISSUE DATE: April 21, 2022

EXPIRATION

DATE:

April 20, 2027

COUNTY: Pinellas

PROJECT NAME: Beckett Bridge Water main & Force main Relocation

Project

WWTF NAME: City of Tarpon Springs WWTF

FACILITY ID: FL0030406

NOTIFICATION OF ACCEPTANCE OF USE OF A GENERAL PERMIT

Dear Mr. Page, This letter acknowledges receipt of your Notification/Application for Constructing a Domestic

Wastewater Collection/Transmission System for the subject project. Our Office received the

Notice on March 25, 2022.

This is to advise you that the Department does not object to your use of this general permit for the following: Twelve-inch diameter force main pipe(s).

Please note the attached requirements apply to your use of this general permit for constructing the proposed domestic wastewater collection/transmission system.

You are further advised that the construction activity must conform to the description contained in your Notification/Application for Constructing a Domestic Wastewater

Collection/Transmission System and that any deviation may subject the permittee to enforcement action and possible penalties.

PERMITTEE:

Raymond Page, Utilities Superintendent

City of Tarpon Springs

1624 L&R Industrial Blvd.

Tarpon Springs, Florida, 34688 rpage@ctsfl.us http://www.floridadep.gov/ mailto:rpage@ctsfl.us

If you have any questions, please contact Mandela Robin at 813.470.5780 or via email at

Mandela.Robin@FloridaDEP.gov.

Sincerely, for Shannon Herbon

Program Administrator

Permitting & Waste Cleanup Program

Southwest District

Cc:

David A. Weber, P.E., Ardurra Group, LLC, DWeber@ardurra.com

Marcos Espinosa, E.I., Ardurra Group, LLC, MEspinosa@ardurra.com

Christina Lacorazza, Ardurra Group, LLC, CLacorazza@ardurra.com

Mandela Robin, DEP SWD, Mandela.Robin@FloridaDEP.gov mailto:Mandela.Robin@FloridaDEP.gov mailto:DWeber@ardurra.com mailto:MEspinosa@ardurra.com mailto:CLacorazza@ardurra.com mailto:Mandela.Robin@FloridaDEP.gov

REQUIREMENTS FOR USE OF THE GENERAL PERMIT FOR DOMESTIC WASTEWATER

COLLECTION/TRANSMISSION SYSTEMS:

1. This general permit is subject to the general permit conditions of Rule 62-4.540, F.A.C., as applicable.

This rule is available at the Department’s Internet site at:

https://floridadep.gov/water/water/content/water-resource-management-rules#ww [62-4.540]

2. This general permit does not relieve the permittee of the responsibility for obtaining a dredge and fill permit where it is required. [62-604.600(6)(b)1]

3. This general permit cannot be revised, except to transfer the permit. [62-604.600(6)(b)2]

4. This general permit will expire five years from the date of issuance. If the project has been started and not completed by that time, a new permit must be obtained before the expiration date in order to continue work on the project. [62-4.030]

5. Upon completion of construction of the collection/transmission system project, and before placing the facilities into operation for any purpose other than testing for leaks or testing equipment operation, the permittee shall submit to the Department’s Southwest District Office Form 62-604.300(8)(b), Request for Approval to Place a Domestic Wastewater Collection/Transmission System into Operation. This form is available at the Department’s Internet site at:

https://floridadep.gov/water/domestic-wastewater/content/domestic-wastewater-forms

[62-604.700(2)]

6. The new or modified collection/transmission facilities shall not be placed into service until the

Department clears the project for use. [62-604.700(3)]

7. Abnormal events shall be reported to the Department’s Southwest District Office in accordance with

Rule 62-604.550, F.A.C. For unauthorized spills of wastewater in excess of 1000 gallons per incident, or where information indicates that public health or the environment may be endangered, oral reports shall be provided to the STATE WATCH OFFICE TOLL FREE NUMBER (800) 320-0519 as soon as practical, but no later than 24 hours from the time the permittee or other designee becomes aware of the circumstances. Unauthorized releases or spills less than 1000 gallons per incident are to be reported orally to the Department’s Southwest District Office within 24 hours from the time the permittee, or other designee becomes aware of the circumstances. [62-604.550] https://floridadep.gov/water/water/content/water-resource-management-rules#ww https://floridadep.gov/water/domestic-wastewater/content/domestic-wastewater-forms www.FloridaDEP.gov http://www.floridadep.gov/