9-11. Attachment J General Conditions Pricing Breakdown.pdf

PDF 96 KB Posted

Attached to
Memorial Unit - Construct Water Treatment Plant - Step 1
Solicitation number
696-FD-26-Q051
Issued by
Texas

About this file

This document is a General Conditions Pricing Breakdown attachment related to a water treatment plant construction project in Texas. The project, identified as Memorial Unit - Construct Water Treatment Plant - Step 1, involves the construction of a facility designed to separate potable from agricultural water systems, with Brazoria Water Authority (BWA) designated as the sole source of drinking water for inmate, staff, residential uses, and potable water for agricultural operations. The document serves as a pricing schedule component within the contract bid package, establishing the framework for itemized cost breakdowns that bidders must complete as part of their proposal submissions.

The pricing breakdown attachment functions as a template requiring bidders to provide detailed cost estimates organized by specific line items, categories, or phases of work as defined within the general conditions of the contract. This structured approach enables comparative evaluation of bids and establishes clear pricing transparency between the state or local jurisdiction and potential contractors. The document ensures that all bidders submit pricing information in a standardized format, facilitating consistent review and analysis of proposals during the procurement process for this water infrastructure project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL CONDITIONS PRICING BREAKDOWN Attachment J

SOLICITATION NO.

Cost

$0.00

CD Milestones Breakdown Criteria

GENERAL CONDITIONS COST BREAKDOWN

Project Management Staff Personnel (On-Site)

Bonds & Insurance

General Conditions

Builder's Risk Insurance

CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN

65% CD

100% CD

Pre-Construction Fee Total

95% CD

COST ESTIMATE FORM

TDCJ UNIT:

CITY: COUNTY:

PROJECT NAME/DESC.: SCHEDULE (Calendar Days):

General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)

Payment and Performance Bonds

Water (Job) Electricity

696-FD-26-Q051 Page 1 of 2

GENERAL CONDITIONS PRICING BREAKDOWN Attachment J

$0.00

$0.00

***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.

Information Technology

b. Construction Materials Testing

Crane

Third-Party Commissioning Services

AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST

General Conditions Total

a. Testing and Balancing

Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters

Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel

Fire Protection

As-Built Drawings Fire Protection

696-FD-26-Q051 Page 2 of 2

Sheet1

File details come from the government source that posted it. Updated .