9-11. Attachment J General Conditions Pricing Breakdown.pdf
PDF 96 KB Posted
- Solicitation number
- 696-FD-26-Q051
- Issued by
- Texas
About this file
This document is a General Conditions Pricing Breakdown attachment related to a water treatment plant construction project in Texas. The project, identified as Memorial Unit - Construct Water Treatment Plant - Step 1, involves the construction of a facility designed to separate potable from agricultural water systems, with Brazoria Water Authority (BWA) designated as the sole source of drinking water for inmate, staff, residential uses, and potable water for agricultural operations. The document serves as a pricing schedule component within the contract bid package, establishing the framework for itemized cost breakdowns that bidders must complete as part of their proposal submissions.
The pricing breakdown attachment functions as a template requiring bidders to provide detailed cost estimates organized by specific line items, categories, or phases of work as defined within the general conditions of the contract. This structured approach enables comparative evaluation of bids and establishes clear pricing transparency between the state or local jurisdiction and potential contractors. The document ensures that all bidders submit pricing information in a standardized format, facilitating consistent review and analysis of proposals during the procurement process for this water infrastructure project.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CONDITIONS PRICING BREAKDOWN Attachment J
SOLICITATION NO.
Cost
$0.00
CD Milestones Breakdown Criteria
GENERAL CONDITIONS COST BREAKDOWN
Project Management Staff Personnel (On-Site)
Bonds & Insurance
General Conditions
Builder's Risk Insurance
CONSTRUCTION DOCUMENTS (CD) COST BREAKDOWN
65% CD
100% CD
Pre-Construction Fee Total
95% CD
COST ESTIMATE FORM
TDCJ UNIT:
CITY: COUNTY:
PROJECT NAME/DESC.: SCHEDULE (Calendar Days):
General Liability Insurance (Auto, Umbrella, Products & Public Liability Insurance)
Payment and Performance Bonds
Water (Job) Electricity
696-FD-26-Q051 Page 1 of 2
GENERAL CONDITIONS PRICING BREAKDOWN Attachment J
$0.00
$0.00
***Please notice this this is not an exhaustive list. General conditions should include any item that is not incorporated in the completed work product and is not trade specific.
Information Technology
b. Construction Materials Testing
Crane
Third-Party Commissioning Services
AVERAGE MONTHLY JOB BREAKDOWN TOTAL COST
General Conditions Total
a. Testing and Balancing
Water (Drinking) & Associated Accessories Storage Containers/Trailers Office Trailer (Monthly Rental Cost) Dumpsters
Information Technology Office Supply - Monthly Safety Material Safety Equipment Fuel
Fire Protection
As-Built Drawings Fire Protection
696-FD-26-Q051 Page 2 of 2
Sheet1
File details come from the government source that posted it. Updated .