14-09. Attachment H RFQ Checklist.pdf

PDF 205 KB Posted

Attached to
Memorial Unit - Construct Water Treatment Plant - Step 1
Solicitation number
696-FD-26-Q051
Issued by
Texas

About this file

This is an RFQ Checklist document related to a water treatment plant construction project in Texas, specifically for the Memorial Unit managed by the Brazos River Authority (BWA). The project aims to construct a water treatment facility that will separate potable water from agricultural water systems, with BWA designated as the sole source of drinking water for inmate, staff, residential uses, and potable water for agricultural operations. The checklist serves as a step one submission requirement for prospective bidders and outlines compliance verification items that must be addressed in bid responses. The document establishes the procedural framework for evaluating bidder qualifications and proposal completeness.

The RFQ checklist functions as an administrative tool to ensure all bidders meet minimum requirements and provide necessary documentation with their submissions. It includes verification points for bidder eligibility, technical compliance, and submission accuracy that the procuring entity will use to screen proposals. The checklist approach allows for systematic review of multiple bids and helps identify responsive and responsible bidders capable of executing the water treatment plant construction. This step one submission process precedes further evaluation phases and award determination for the construction project.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment H

696-FD-26-Q051 Page 1 of 2

RFQ CHECKLIST

Checklist for RFQ # 696-FD-26-Q051 Title: RFQ for CM@R for Construct Water Treatment Plant Closing Date: November 23, 2026, @ 3:00 PM

Respondent Name and Address:

Contact:

TX Taxpayer #:

Office Phone:

Mobile Phone:

Email:

Attended a Pre-Submittal Conference:

STEP ONE SUBMITTAL: Submittals shall be clearly defined and separated into sections.

1. Submitted one original of the following:

Execution of Submittal, (Attachment A)

Bid Bond

Acknowledge Addenda

Litigation History Statement

Company Information

Experience and Qualifications

Contractor’s Qualification Form, (Attachment C)

Budget Compliance Form

Schedule Compliance Form

Methodology

Quality/Safety Programs and Safety Record

Attachment H

696-FD-26-Q051 Page 2 of 2

STEP TWO SUBMITTAL:

1. Submitted one original of the following:

CM@R Response Form, (Attachment B)

Non-Collusion Affidavit, (Attachment F)

General Conditions Pricing Breakdown (Attachment J)

File details come from the government source that posted it. Updated .