5-03. Attachment B Construction Manager-at-Risk Response Form.pdf

PDF 101 KB Posted

Attached to
Memorial Unit - Construct Water Treatment Plant - Step 1
Solicitation number
696-FD-26-Q051
Issued by
Texas

About this file

This is a Construction Manager-at-Risk (CM@R) Response Form submitted by selected respondents to the Texas Department of Criminal Justice (TDCJ) for Project Number 696-FD-26-Q051, which involves constructing a Water Treatment Plant at the Memorial Unit in Rosharon, Texas 77583. The project scope requires separation of potable from agricultural water systems and designation of BWA as the sole source of drinking water for inmate, staff, and residential uses, as well as potable water for agricultural operations. The anticipated project timeline spans 26 months, consisting of 7 months for pre-construction and design phases and 19 months for construction. This step 2 response form is submitted only by respondents previously evaluated and selected based on qualifications.

Respondents must propose pricing for three fee components: a Pre-Construction Management Fee (not-to-exceed amount to be negotiated with the highest-scoring firm during design collaboration with TDCJ and the A/E), a Construction Management Fee calculated as a percentage of the Cost of Work using a baseline of $10,049,000.00, and a Construction General Conditions fee with separate line items for personnel, bonds, insurance, temporary facilities, and other costs on a monthly not-to-exceed basis. General Conditions costs shall cover project management personnel (both office and field), bonds, insurance, temporary field facilities, background checks, health and safety, documentation, transportation, parking, temporary barriers and signage, and cleaning and waste disposal. Authorized signatures and corporate documentation are required with the submission.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

696-FD-26-Q051 Page 1 of 2

CM@R RESPONSE FORM

(Submitted at Step 2 by Selected Respondents Only)

1. Proposing Firm's Name:

Address:

City, State, Zip:

2. Project Number: 696-FD-26-Q051 Project Title: CM@R for Memorial Unit – Construct Water Treatment Plant Using Agency: Texas Department of Criminal Justice

Project Location: Memorial Unit, Rosharon, Texas 77583

Having carefully examined the RFQ documents, response Attachments, as well as the premises and conditions affecting the work, as prepared by TDCJ, we hereby propose to complete the work for the following amounts:

Pre-Construction Management Fee for a Not-to-Exceed fee in collaborating with TDCJ and A/E during design phases

To be negotiated with the Respondent that is evaluated as the highest scoring firm

Construction Management Fee as a PERCENTAGE fee of the Cost of Work for construction (CM@R’s overhead and profit). For purposes of this RFQ only, use $10,049,000.00 as the total Cost of Work.

Not-to-Exceed fee for Construction General Conditions: General Conditions shall include the following for the duration of the project:

• Bonds and Insurance

• Project Management / Supervisory / Support / Administrative Personnel (both office and field)

• Temporary Field Offices / Facilities / Storage (including equipment, materials and temporary utilities)

• Background Checks / Employee I.D.s

• Health and Safety

• Construction Documentation

• Transportation

• Parking

• Temporary Barriers, Signage, and Controls

• Cleaning and Waste Disposal

Attachment B

696-FD-26-Q051 Page 2 of 2

Dollars $

Number of Personnel (Project Management / Supervisory/ Support / Administrative Personnel (both office and field)

Not to Exceed Monthly Personnel Rate Not to Exceed Monthly Bonds Not to Exceed Monthly Insurance Not to Exceed Monthly Temp Offices, Facilities Storage, etc.

Not to Exceed Monthly All Remaining Costs

Total Not to Exceed Monthly General Conditions Fee

Base Time: Anticipated construction time will be 26 months: 7 months for pre-construction and 19 months for Construction.

RESPECTFULLY SUBMITTED:

If a corporation, attach a corporation resolution or other official corporate documentation, which states that the person signing this response is an authorized person to sign for and legally bind the corporation

Authorized Signature:

Printed Name and Title:

Telephone:

Respondent's Corporate Charter No.:

CM@R RESPONSE FORM
(Submitted at Step 2 by Selected Respondents Only)

RESPECTFULLY SUBMITTED:

File details come from the government source that posted it. Updated .