This is a Pre-Bid Conference presentation for the City of Fort Worth, Texas, Transportation & Public Works Department regarding City Project No. 106793, the 2027 Hot In-Place Recycling Contract. The project encompasses three main corridors: Trail Lake Drive (Sycamore School Road to Altamesa Boulevard), Wichita Street (Mansfield Highway to Collin Street), and Chapel Creek Boulevard (Chapin Road to pavement change). The scope includes 71,957 square yards of surface milling, 71,957 square yards of 1-inch hot in-place recycling with rejuvenating oil, and 71,957 square yards of 1-inch asphalt pavement overlay (SP-D type); additionally, 1,385 cubic yards of asphalt pavement base repair, 843 cubic yards of cement-treated flexbase Type A GR-2, 690 linear feet of remove and replace concrete curb and gutter, 1,091 square feet of remove and replace concrete driveways, 2,619 square feet of remove and replace concrete sidewalk, 3 ADA curb ramps, and 53,317 linear feet of pavement marking. The bid opening is scheduled for September 24, 2026, with City Council bid award targeted for November 17, 2026. Pre-construction meetings are anticipated by January 2027, with construction beginning January/February 2027. The selected vendor must have crews available to commence work immediately upon receipt of the Notice to Proceed.

Bidders must be pre-qualified in Asphalt Paving Heavy Maintenance with a minimum contract value of $1,000,000 and over. Required bid proposal submissions include a bid form, conflict of interest statement, bid bond, contractor compliance with workers' compensation, vendor compliance documentation with Texas state law, and a proposal form. The project manual is available online through Bonfire, where all submission instructions must be followed. The Small Business Enterprise subcontracting goal has been waived for this contract with no required submittals. Project inquiries should be directed to Fort Worth Project Manager Marwan Hafez, P.E., at 817-392-7968 or Marwan.Hafez@fortworthtexas.gov.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Transportation & Public Works

2027 Hot In-Place Recycling Contract 1 City Project No. 106793

Pre-Bid Conference

Presented by

Marwan Hafez, P.E.

TPW – Capital Delivery

Project Limits

5Transportation & Public Works 2

Trail Lake Dr (Sycamore School Rd to Altamesa Blvd)

Wichita St (Mansfield Hwy to Collin St)

Chapel Creek Blvd (Chapin Rd to Pavement change)

Project Scope Details

Paving

Flatwork

Pavement Marking

Transportation & Public Works

71,957 SY 1" Surface milling 71,957 SY 1” Hot in-place recycling 71,957 SY 1” asphalt pavement overlay SP-D 1,385 CY Asphalt pavement base repair

843 CY Cement treated flexbase, Type A, GR-2

690 LF Remove and Replace Concrete Curb & Gutter 1,091 SF Remove and Replace Concrete Driveways 2,619 SF Remove and Replace Concrete Sidewalk

3 EA Remove and Replace Concrete ADA Curb Ramp

53,317 LF Pavement Marking

Street Name From To Pavement Quantity

(SY)

Chapel Creek Blvd Chapin Rd Pavement Change 14,153

Trail Lake Dr Sycamore School Rd Altamesa Blvd 21,292

Wichita St Mansfield Hwy Collin St 36,512

SPECIAL SPECIFICATION

1-INCH HMAC HOT IN PLACE RECYCLING & REJUVENATING OIL

Anticipated Schedule

57Transportation & Public Works

❖Schedule:

• Bid Opening September 24, 2026

• Council Bid Award – Aiming November 17th, 2026

• Pre-construction meeting by January 2027

• Begin Construction in January/February 2027

❖Selected vendor must have crews available to start work after receiving the Notice to Proceed.

Project Requirements

55Transportation & Public Works

❖ Pre-qualification:

Asphalt Paving Heavy Maintenance ($1,000,000 and OVER)

• Project Manual available online on Bonfire

• Required in Bid Proposal Submittal

• Follow “Submission Instructions” in Bonfire

• Bid Form

• Conflict of Interest Statement

• Bid Bond

• Contractor Compliance with WC

• Vendor Compliance to State Law

• Proposal Form

• Addendum

• Bid Table

Small Business Enterprise

• Small Business Goal is waived for this contract – no submittals

56Transportation & Public Works

Questions/Discussion

58Transportation & Public Works

58Transportation & Public Works

Fort Worth Project Manager Marwan Hafez, P.E.

817-392-7968 Marwan.Hafez@fortworthtexas.gov

Contact Information

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8

File details come from the government source that posted it. Updated .