This is a construction document set prepared by HHY Associates for Salt Lake County's partial re-roof replacement project at the Holladay Lions Recreation Center located at 1661 E Murray Holladay Road, Millcreek, Utah 84117. The project involves removal and replacement of the roof waterproofing system across four roof sections (Roof A, B, C, and D) and is coordinated with a separate RTU replacement project occurring concurrently. The construction documents include site plans, overall roof plans with FM Global ratings, demolition plans for all roof sections, new installation plans, multiple building sections and elevations, and detailed specifications for roof construction. The facility contains multiple occupancy areas including a gymnasium (217 occupants), pool (374 occupants), fitness center (57 occupants), running track (72 occupants), aerobics area (30 occupants), multi-purpose space (66 occupants), day care (32 occupants), and various office and administrative spaces with a total combined occupant load of 966. The new roofing system specifications call for mechanically fastened single-ply roofing installed over R-30 rigid insulation over existing metal decking, with pre-finished metal coping and expansion covers as required.

The construction documents provide comprehensive technical specifications including metal roof deck details (ranging from 28 LH06 to 56/70/56 DLH14 configurations), elevation details ranging from 100 feet to 141 feet-4 inches, minimum roof slopes of 1/4 inch per foot, and specific fastening patterns for the Rhinobond roofing system with varying fastener counts based on field, perimeter, and corner zones. The documents establish minimum slope requirements, material specifications, and coordination points with existing structural elements including CMU walls, EIFS wall systems, metal stud framing, and various mechanical systems (flue, ventilation, RTU equipment). No specific pricing information, bid due dates, or contract award dates are contained within these construction documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1661 E MURRAY HOLLADAY RD

MILLCREEK, UT 84117

REQUEST #

MARCH 18, 2026

CONSTRUCTION DOCUMENTS

HOLLADAY LIONS

RECREATION CENTER

PARTIAL RE-ROOF

DRAWING INDEX

SYMBOL LEGENDVICINITY MAPOWNER ABBREVIATIONS

CODE ANALYSIS

Occupant Loads:

2001 Building: 2008 Addition:

Pool 374 Gymnasium 10,810/50 217 Fitness 57 Running Track 3,590/50 72 Aerobics 30 Multi-Purpose 3,251/50 66 Office 6 Day Care 1,098/35 32 Lockers 37 Office 1,202/100 13 Mechanical 7 Conference 294/15 20

Pool Classroom 696/20 35 Total 511 Total 455

FLUE

FH

VTR

EX

RTU

GA

VENT

9 11 18 6 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

A Y

L

I O

N S

R

E C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

M

U R

R A

Y

H

O L L A

D A

Y

R

D

M

I L L C

R E

E K

U

T

SITE PLAN,

FM GLOBAL NOTES

& GENERAL NOTES

A0.1

½ ½ ¾

A B C D

ROOF

A

ROOF

B

ROOF

D

ROOF

C mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

OVERALL

ROOF PLAN &

RATING CALS

A1.0

ELEVATION 120'-0"

T.O. CMU

SL

OP

E 1/

4"

/FT

M

IN

. SL

OP

E 1/

4"

/FT

T

YP

ELEVATION 120'-0"

T.O. EXISTING CMU

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 141'-4"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 141'-4"

T.O. CURB

ELEVATION 118'-0"

T.O. CURB

ELEVATION 118'-0"

ELEVATION 120'-8"

T.O. CONCRET

mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

ROOF A -

DEMOLITION PLAN

A1.1D

ELEVATION 120'-3"

DECK BEARING

ELEVATION 121'-4"

T.O. CMU

ELEVATION 115'-4"

DECK BEARING

ELEVATION 120'-8"

T.O. CONCRETE

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-0"

T.O. CMU

ELEVATION 119'-0"

DECK BEARING

ELEVATION 115'-4"

DECK BEARING

ELEVATION 134'-0"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 131'-8"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 131'-8"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 116'-0"

ELEVATION 118'-0"

T.O. CMU

DECK BEARING

ELEVATION 120'-8"

T.O. CONCRETE

ELEVATION 120'-0"

T.O. CMU

ELEVATION 134'-8"

T.O. CMU

SL

OP

E 1/

4"

/FT

. M

IN

SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

. T

YP

SL

OP

E

1/ 4"

/FT

. T

YP

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E

1/ 4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

M

IN

SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E

1/ 4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

T

YP

SLOPE 1/4"/FT MIN.

SLOPE 1/4"/FT MIN.

SLOPE 1/4"/FT MIN.

SL

OP

E 1/

4"

/FT

M

IN

SLOPE

1/4"/FT MIN.

SL

OP

E 1/

4"

/FT

M

IN

. SL

OP

E 1/

4"

/FT

T

YP

ELEVATION 124'-0"

T.O. EIFS

ELEVATION 116'-8"

T.O. STUD WALL

ELEVATION 120'-0"

T.O. EXISTING CMU

ELEVATION 116'-2"±

DECK BEARING

(MATCH EXISTING)

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-3"

BEACK BEARING

ELEVATION 118'-0"

T.O. STUD WALL

ELEVATION 118'-0"

T.O. EXIST. CMU

ELEVATION 133'-0"

DECK BEARINGELEVATION 134'-8"

T.O. CMU

ELEVATION 118'-0"

T.O. EXIST. CMU

ELEVATION 115'-9"±

DECK BEARING

(MATCH EXISTING)

T.O. CMU

ELEVATION 138'-0"

T.O. CURB

ELEVATION 118'-0"

ELEVATION 121'-4"

T.O. CMU

T.O. CURB

ELEVATION 118'-0"

VTR

VTR

VTR

T.O. CURB

ELEVATION 118'-0"

ELEVATION 120'-8"

T.O. CONCRET

T.O. CMU

ELVATION 118'-0"

T.O. CMU

ELEVATION 120'-0"

SL

OP

E 1/

4"

/FT

M

IN

SLOPE

1/4"/FT MIN.

mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

ROOF B, C & D

- DEMOLITION PLAN

A1.2D

ELEVATION 120'-0"

SL

OP

E 1/

4"

/FT

M

IN

. SL

OP

E 1/

4"

/FT

T

YP

ELEVATION 120'-0"

T.O. EXISTING CMU

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 141'-4"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 138'-0"

T.O. CMU

ELEVATION 141'-4"

T.O. CURB

ELEVATION 118'-0"

T.O. CURB

ELEVATION 118'-0"

ELEVATION 120'-8"

T.O. CONCRET

mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

ROOF A

- NEW PLAN

A1.1N

ELEVATION 120'-3"

DECK BEARING

ELEVATION 121'-4"

T.O. CMU

ELEVATION 115'-4"

DECK BEARING

ELEVATION 120'-8"

T.O. CONCRETE

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-0"

T.O. CMU

ELEVATION 119'-0"

DECK BEARING

ELEVATION 115'-4"

DECK BEARING

ELEVATION 134'-0"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 131'-8"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 131'-8"

DECK BEARING

ELEVATION 134'-8"

T.O. CMU

ELEVATION 116'-0"

ELEVATION 118'-0"

T.O. CMU

DECK BEARING

ELEVATION 120'-8"

T.O. CONCRETE

ELEVATION 120'-0"

T.O. CMU

ELEVATION 134'-8"

T.O. CMU

SL

OP

E 1/

4"

/FT

. M

IN

SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

. T

YP

SL

OP

E

1/ 4"

/FT

. T

YP

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E

1/ 4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

M

IN

SLOPE 1/4"/FT. MIN.SLOPE 1/4"/FT. MIN.

SL

OP

E 1/

4"

/FT

. M

IN

SL

OP

E

1/ 4"

/FT

. M

IN

SL

OP

E 1/

4"

/FT

T

YP

SLOPE 1/4"/FT MIN.

SLOPE 1/4"/FT MIN.

SLOPE 1/4"/FT MIN.

SL

OP

E 1/

4"

/FT

M

IN

SLOPE

1/4"/FT MIN.

SL

OP

E 1/

4"

/FT

M

IN

. SL

OP

E 1/

4"

/FT

T

YP

ELEVATION 124'-0"

T.O. EIFS

ELEVATION 116'-8"

T.O. STUD WALL

ELEVATION 120'-0"

T.O. EXISTING CMU

ELEVATION 116'-2"±

DECK BEARING

(MATCH EXISTING)

ELEVATION 120'-0"

T.O. CMU

ELEVATION 120'-3"

BEACK BEARING

ELEVATION 118'-0"

T.O. STUD WALL

ELEVATION 118'-0"

T.O. EXIST. CMU

ELEVATION 133'-0"

DECK BEARINGELEVATION 134'-8"

T.O. CMU

ELEVATION 118'-0"

T.O. EXIST. CMU

ELEVATION 115'-9"±

DECK BEARING

(MATCH EXISTING)

T.O. CMU

ELEVATION 138'-0"

T.O. CURB

ELEVATION 118'-0"

ELEVATION 121'-4"

T.O. CMU

T.O. CURB

ELEVATION 118'-0"

VTR

VTR

VTR

T.O. CURB

ELEVATION 118'-0"

ELEVATION 120'-8"

T.O. CONCRET

T.O. CMU

ELVATION 118'-0"

T.O. CMU

ELEVATION 120'-0"

SL

OP

E 1/

4"

/FT

M

IN

SLOPE

1/4"/FT MIN.

mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

ROOF B, C & D

- NEW PLAN

A1.2N

FIN. FLOOR

EL. 100'-0"

EL. 138'-0"

T.O.M.

LOBBY

CLASSROOM

STORAGE

OFFICE

EXIST

EXISTING CMU WALL

EXISTING CMU WALL

NEW CMU WALL

EXISTING

TPO

ROOFING

T/MASONRY

EL. 138'-0"

T/MASONRY

EL. 141'-4"

MTL ROOF DECK

40 LH12 @ 5'-6" O/C

LOBBY

CORRIDOR

ELEVATOR

EQUIPMENT

MULTI-PURPOSE

2 13467

ELEVATION 134'-8"

T.O. CMU

ELEVATION 121'-4"

T.O. CMU

ELEVATION 100'-0"

FINISHED FLOOR

VENDING

EXISTING CMU WALL

NEW CMU WALL

PRE FINISHED METAL

COPING

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

A2.2

A A2.2

E

20 GA 1 1/2" TYPE 'B' MTL

ROOF DECK

44 LH10

MTL ROOF DECK

40 LH12 @ 5'-6" O/C

'-0 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L L A

D A

Y

R

D

M

I L L C

R E

E K

U

T

BUILDING

SECTIONS

A2.1

ELEVATION 134'-8"

ELEVATION 114'-0"

T.O. TRACK

ELEVATION 131'-8"

DECK BEARING

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 116'-0"

DECK BEARING

ELEVATION 118'-0"

T.O. CMU

T.O. CMU

'-0

'-0

'-0

ABCD

GYMNASIUM

CORRIDOR

CONFERENCE

OFFICE

OFFICE

OFFICE

RESTROOM

ELEVATION 116'-8"

DECK BEARING

ELEVATION 120'-8"

T.O. CONCRETE WALL

ELEVATION 134'-8"

T.O. CMU

ELEVATION 116'-8"

DECK BEARING

ELEVATION 133'-6"

DECK BEARING

NEW CMU SHEAR WALLEXISTING WINDOW W/

NEW SAFETY GLASS AS

SCHEDULED

EXISTING CMU WALL.

PAINT TO MACH NEW WALL

NEW PRE-CAST BENCH

ELEVATION 124'-"

T.O. CMU WALL

STORAGE

PRE FINISHED METAL

COPING

PAINTED JOIST

EIFS WALL

METAL CANOPY

A2.2

D

A2.1

C A2.2

B

A2.2

C

20 GA 1 1/2" TYPE 'B' MTL

ROOF DECK MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

56/70/56 DLH14 W/ (6)

ROWS OF XB

MTL ROOF DECK

W10x12

MTL ROOF

DECK

W8x10

67 3 145

CORRIDOR

STORAGE

OFFICE

MULTI-PURPOSE

LOBBY

ELEVATION 121'-4"

T.O. CMU

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 134'-8"

T.O. CMU

B C

ELEVATION 121'-4"

T.O. CMU

MULTI-PURPOSE

GYMNASIUM

ELEVATION 134'-8"

T.O. CMU

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 131'-8"

DECK BEARING

PRE FINISHED

METAL COPING

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

EXPANSION

COVER

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

A2.2

E

A2.2

D

A2.2

A

'-0

EXISTING TPO

ROOFING

20 GA 1 1/2" TYPE 'B' MTL

ROOF DECK

44 LH10

20 GA 1 1/2" TYPE 'B' MTL

ROOF DECK

44 LH10

MTL ROOF DECK

28 LH06 @ 5'-0" O/C

MTL ROOF DECK

W10x12

MTL ROOF DECK

40 LH12 @ 5'-6" O/C

'-1

113 16

'-31 8"

'-0

'-8

ELEVATION 134'-8"

T.O. CMU

ELEVATION 114'-0"

T.O. CMU

ELEVATION 100'-0"

FINISHED FLOOR

LOBBY

GYMNASIUM

CHILD CARE

STORAGE

OFFICE

ENTRY

78 6

2 PERIOD

GUEST HOME

0:36

PRE-CAST BENCH

PRE FINISHED

METAL COPING

PRE FINISHED

METAL COPING

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

EXISTING CMU WALL

EXISTING CMU WALL

A2.2

A

'-0

'-0

'-8

9 16

'-1

13 16

EXISTING TPO

ROOFING

EXISTING TPO

ROOFINGEXISTING TPO

ROOFING

EXIST EIFS

WALL

20 GA 1 1/2" TYPE 'B' MTL

ROOF DECK

56/70/56 DLH14 W/ (6)

ROWS OF XB

MTL ROOF DECK

W10x12 @ 7'-0" O/C

MTL ROOF DECK

W12x19 @ 7'-0" O/C mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L L A

D A

Y

R

D

M

I L L C

R E

E K

U

T

BUILDING

SECTIONS

A2.2

ELEVATION 124'-0"

EIFS OVER 2" RIGID INSULATION

OVER 8" CMU WALL

TUBE STEEL

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION

OVER METAL DECKING

SLOPE

SLOPE

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 116'-8"

DECK BEARING

ELEVATION 124'-0"

T.O. CMU

EIFS OVER 2" RIGID INSULATION

OVER 8" CMU WALL

BASE AS SCHED.

4" CONCRETE SLAB

ON GRADE OVER 4"

DRAINAGE FILL

EIFS OVER 2" RIGID

INSULATION OVER

8" CMU WALL

PAINTED HOLLOW METAL

WINDOW FRAME

GLAZING AS SCHEDULED

CEILING AS SCHEDULED

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION OVER

METAL DECKING

6" M

IN

COMPACTED STRUCTURAL

FILL OR UNDISTURBED

NATURAL SOIL. TYP.

ENTRY

CHILD CARE

PAINTED 8" CMU

CONC. FOOTING AND

FOUNDATION

MTL ROOF DECK

W10x12 @ 7'-0" O/C

MTL ROOF DECK

W12x19 @ 7'-0" O/C

MTL ROOF DECK

W12x14

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 116'-8"

T.O. STUD/ FRAME

ELEVATION 111'-8"

T.O. CANOPY

CONC. FOOTING AND

FOUNDATION

CEILING AS SCHEDULED

4" CONCRETE SLAB

ON GRADE OVER 4"

DRAINAGE FILL

COMPOSITE METAL

PANEL SYSTEM OVER

5/8" SHEATHING ON

METAL STUD FRAMING

GLAZING & FRAME AS SCHEDULED

COMPOSITE METAL PANEL SYSTEM

OVER 5/8" EXTERIOR SHEATHING

ON METAL STUD FRAMING

PRE FINISHED METAL

COPING

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

RIGID INSULATION OVER

METAL DECKING

GLAZING & FRAME AS SCHEDULED

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION OVER

METAL DECKING

5/8" PAINTED GYP. BD.

CEILING

TUBE STEEL

COMPACTED STRUCTURAL

FILL OR UNDISTURBED

NATURAL SOIL. TYP.

COMPOSITE METAL PANEL SYSTEM

2" FOUNDATION INSULATION

ARCHITECTURAL CONC.

FOUNDATION.

VESTIBULE

PAINTED STEEL COLUMN

SLOPE

SLOPE

A2.4

A

W14x22 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L L A

D A

Y

R

D

M

I L L C

R E

E K

U

T

BUILDING

SECTION

A2.3

EIFS OVER 2" RIGID INSULATION

OVER 8" CMU WALL

ELEVATION 100'-0"

FINISHED FLOOR

ELEVATION 111'-8"

T.O. CANOPY

D

ELEVATION 116'-8"

T.O. STUD/ FRAME

ELEVATION 120'-8"

T.O. CONCRETE WALL

ELEVATION 124'-0"

T.O. CMU

PUNCHED OPENINGS IN EIFS WALL

8" CONCRETE WALL

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION OVER

METAL DECKING

COMPOSITE METAL PANEL SYSTEM

OVER 5/8" EXTERIOR SHEATHING

ON METAL STUD FRAMING

GLAZING & FRAME AS SCHEDULED

PRE FINISHED METAL

COPING

CONC. FOOTING AND

FOUNDATION

GLAZING & FRAME AS SCHEDULED

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

RIGID INSULATION OVER

METAL DECKING

COMPOSITE METAL

PANEL SYSTEM OVER

5/8" SHEATHING ON

METAL STUD FRAMING

TUBE STEEL. SEE

STRUCT.

PAINTED HOLLOW METAL

WINDOW FRAME

4" CONCRETE SLAB ON GRADE OVER 4"

DRAINAGE FILL

CEILING AS SCHEDULED

MECHANICALLY FASTENED

SINGLE-PLY ROOFING OVER

R-30 RIGID INSULATION OVER

METAL DECKING

PRE FINISHED METAL

COPING

EIFS REVEAL

TYP.

EIFS REVEAL

TYP.

1'- 0"

4"4'-11"

4"

EXISTING SLAB ON GRADE

COMPACTED STRUCTURAL FILL

OR UNDISTURBED NATURAL SOIL.

TYP.

EXISTING CONC.

SLAB FOOTING AND

FOUNDATION

SINGLE PLY ROOF

MEMBRANE TO EXTEND

UP PARAPET AND OVER

TOP OF PT. WOOD NAILER

2" FOUNDATION

INSULATION

VESTIBULE

ENTRY

SLOPE

4'- 8"

1'- 8"

1'- 0"

1'-4" 6'-6" 3'-8" 6'-4" 3'-8" 6'-4" 3'-8"

4'-0"6'-4"5'-03 16"6'-4"3'-8"6'-4"3'-8"

3'- 0"

2'- 0"

2'- 0"

4'- 8"

2'- 0"

2'- 0"

4'- 8"

2'- 4"

1'- 0"

6'-4"

A2.3

A

SURFACE MTD. REGLET,

TYP.

W10x12 @ 7'-0" O/C

W14x22 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L L A

D A

Y

R

D

M

I L L C

R E

E K

U

T

BUILDING

SECTION

A2.4 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

DETAILS - DEMO

A3.1D mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

DETAILS - new

A3.1N mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

A3.2D mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

A3.2N mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

A3.2D mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

DETAILS - new

A3.3N

ISOMETRIC

FIELD

6 FASTENERS/BD.

PERIMETER

10 FASTENERS/BD.

CORNER

16 FASTENERS/BD.

FIELD

4 FASTENERS/BD.

CORNER

8 FASTENERS/BD.

PERIMETER

6 FASTENERS/BD.

2' X 3' RHINOBOND FASTENING PATTERN

FOR ALL ZONES

mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

A3.4

≤ 8 mail@hhyassoc.com

Salt Lake City, UT 84106

Fax: 801 466 6022

Suite 210

2180 South 1300 East

Phone: 801 466 3996

H O

L L

A D

O

C

R E

A T

I O

N

C

E N

T E

R

P A

R T

I A

L

R

E R

O O

F

R

R A

Y

H

O L

L A

D A

Y

R

D

M

I L

L C

R E

E K

U

T

DETAILS - RTU

FOR

REFERENCES

A3.5

Sheets and Views
HLreroof-Cover
HLreroof-A0.1
HLreroof-A1.0
HLreroof-A1.1D
HLreroof-A1.2D
HLreroof-A1.1N
HLreroof-A1.2N
HLreroof-A2.1
HLreroof-A2.2
HLreroof-A2.3
HLreroof-A2.4
HLreroof-A3.1D
HLreroof-A3.1N
HLreroof-A3.2D
HLreroof-A3.2N
HLreroof-A3.3D
HLreroof-A3.3N
HLreroof-A3.4
HLreroof-A3.5

File details come from the government source that posted it. Updated .