6--8- Exhibit A- MinimumStandards for Responsiveness- PAR129711.pdf
PDF 83 KB Posted
- Solicitation number
- SLCo PAR129711 Holladay Lions Recreation Center Roof Replacement - CONST
- Issued by
- Salt Lake County, Hildale City, Utah
About this file
This is a Minimum Standards for Responsiveness form issued by Salt Lake County for the Holladay Lions Recreation Center Re-Roof Project (PAR129711), a construction services contract involving the removal and replacement of the roof waterproofing system. The work will be coordinated with a concurrent RTU replacement project. Prospective general contractors must affirmatively answer all responsiveness questions to avoid bid rejection, including demonstrating completion of all roofing projects in the past five years without surety involvement, owner default claims, or liquidated damages assessments. Additionally, contractors must document similar-sized project experience, relevant commercial or government project work within the past three years, three professional references, willingness to support third-party inspectors and material testing firms, and experience constructing projects in fully occupied adjacent areas.
The document establishes mandatory qualification criteria rather than pricing or contract term information, with Salt Lake County reserving the right to investigate responses further. The form must be included in the bid package as part of required submittal documentation. The specification sections referenced indicate a comprehensive scope including selective demolition, joint sealants, plumbing work, mechanical requirements, HVAC systems, and related building systems, suggesting a substantial renovation project beyond roof replacement alone.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINIMUM STANDARDS FOR RESPONSIVENESS
YES NO QUESTIONS
CONTRACT SPECIFIC PERFORMANCE:
PROJECT SPECIFIC PERFORMANCE:
EXHIBIT A PROJ. ID.
CONSTRUCTION SERVICES FOR: Holladay Lions Recreation Center Re-Roof Project
Proposer must answer, in the affirmative, to all questions below or the Proposer's bid will be deemed non-responsive and non-responsible.
In the last five years, has your firm, acting as the General Contractor:
Completed all roofing projects without the owner(s) calling in or involving sureties to assist in completing or assuming responsibility for completing a project?
Completed all roofing replacement projects without being removed from the project upon a claim by the Owner for default or breach of contract?
Completed all construction projects without assessment or payment of Liquidated Damages?
In the last five years, has your firm, acting as the General Contractor worked on a project of similar size and scope?
In the last 3 years, has your firm, acting as the General Contractor, worked on a commercial project(s) and/or Government projects(s) outside of new single-family homes and single-family renovations?
From the last five years, is your firm able to provide a minimum of 3 references who will speak to your performance?
Will your firm and your sub-contractors support third-party inspectors and material testing firms on this project?
Does your firm have successful experience constructing projects while fully occupied in adjacent areas?
This form must be included in your bid package as part of the required forms for submittal.
The County reserves the right to investigate further, any of the responses to the above questions.
COMPANY NAME
SIGNER
TITLE
SALT LAKE COUNTY - SMALL PROJECT
| 00 0100 MINIMUM STANDARDS FOR RESPONSIVENESS |
| 00 0101 PROJECT COVER PAGE |
| 00 0110 TABLE OF CONTENTS |
| 00 3143 - PERMIT APPLICATION |
| 01 1000 - SUMMARY |
| 01 2500 - SUBSTITUTION PROCEDURES |
| 01 3100 - PROJECT MANAGEMENT AND COORDINATION |
| 01 3233 - PHOTOGRAPHIC DOCUMENTATION |
| 01 3300 - SUBMITTAL PROCEDURES |
| 01 4000 - QUALITY REQUIREMENTS |
| 01 4200 - REFERENCES |
| 01 5000 - TEMPORARY FACILITIES AND CONTROLS |
| 01 6000 - PRODUCT REQUIREMENTS |
| 01 7300 - EXECUTION |
| 01 7419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL |
| 01 7700 - CLOSEOUT PROCEDURES |
| 01 7823 - OPERATION AND MAINTENANCE DATA |
| 01 7839 - PROJECT RECORD DOCUMENTS |
| 02 4119 - SELECTIVE DEMOLITION |
| 07 9200 - JOINT SEALANTS |
| 220500 Common Work Results for Plumbing (lead free) |
| 221316 Sanitary Waste and Vent Piping - 2019-04-02 |
| 230100 Mechanical Requirements -2014-11-24 |
| 230513 Common Motor Requirements for HVAC Equipment - 2013-01-15 |
| 230519 Meters and Gages for HVAC - 2013-03-15 |
| 230523 General-Duty Valves for HVAC Piping - 2013-03-15 |
| 230529 Hangers and Supports for HVAC Piping and Equipment - 2014-05-13 |
| 230548 Vibration and Seismic Controls for HVAC - 2020-03-30 |
| 230550 Operation and Maintenance of HVAC Systems - 2016-01-18 |
| 230593 Testing Adjusting and Balancing for HVAC - 2013-09-26 |
| 230713 Duct Insulation - 2014-05-02 |
| 230719 HVAC Piping Insulation - 2016-01-19 |
| 230900 Sequence of Operations |
| 232113 Hydronic Piping - 2017-09-13 |
| 232116 Hydronic Piping Specialties - 2016-05-09 |
| 232500 Chemical Water Treatment |
| 233113 Metal Ducts - 2015-12-09 |
| 237324 CUSTOM NATATORIUM AIR-HANDLING UNITS 2015-11-12 |