This Bid Schedule is a component of Salt Lake County's Request for Proposal (RFP) FCE133675 for construction materials to support Rose Creek gabion basket wall installation. The project involves supplying Class III riprap (D50=12"), 4-8 inch rock fill, and galvanized steel gabion wire baskets for bank stabilization measures along 619 linear feet of Rose Creek to protect an existing maintenance road from scour. The bid schedule identifies three line items: 430 cubic yards of riprap, 906 cubic yards of rock fill, and galvanized steel gabion baskets (specified as either 453 individual baskets measuring 3' by 3' by 6' or 905 individual baskets measuring 3' by 3' by 3'). Salt Lake County crews will perform installation between September 2026 and November 2026, with suppliers permitted to bid on any portion of materials without furnishing complete bids across all line items. All material specifications conform to the 2025 APWA Utah Chapter Manual of Standard Specifications.
Pricing for riprap and rock fill is based on unit prices per cubic yard, while gabion baskets are quoted on a lump sum basis. The lump sum payment for gabion baskets covers furnishing and delivery of unassembled wire baskets and materials for tying baskets together, but excludes rock fill. Riprap and rock fill payments cover all labor, equipment, and materials necessary for County pickup during normal business hours, with final payment quantities potentially subject to change from estimated amounts. Gabion baskets must be delivered to the County operations yard. This procurement is strictly for material supply and delivery; installation services are excluded and will be performed by County crews.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
FCE133675-1
BID SCHEDULE
Item No.
Specification Reference Number Classification of Unit Price Work
Expected Quantity Unit
Unit Price
1 31 37 00 Riprap, Class III (D50=12")
Cubic Yards
31 36 00 Rock Fill, 4-8 inch
Cubic Yards
31 36 00 Galvanized Steel Gabion Baskets
Lump Sum
MEASUREMENT AND PAYMENT
1. Riprap, Class III (D50=12")
a. Specification Reference: 31 37 00
b. Measurement: Cubic Yards.
c. Payment Covers: All labor, equipment, and materials necessary to furnish riprap for
County pick-up.
2. Rock Fill
a. Specification Reference: 31 36 00
b. Measurement: Cubic Yards
c. Payment Covers: All labor, equipment, and materials necessary to furnish rock fill for
County pick-up.
3. Galvanized Steel Gabion Baskets
a. Specification Reference: 31 36 00
b. Measurement: Lump Sum. Project requires 453 individual baskets of 3' by 3' by 6'
OR 905 individual baskets of 3' by 3' by 3'.
c. Payment Covers: All labor, materials, and equipment required furnish and deliver required quantity of unassembled gabion wire baskets, including materials for tying individual new gabion baskets together. Excludes rock fill for gabion baskets.
END OF DOCUMENT
| FCE133675-1 |
| BID SCHEDULE |
File details come from the government source that posted it. Updated .