This is an Instruction to Proposers document issued by the Utah Department of Transportation (UDOT) for solicitation UDOT250192MP-1, released February 2, 2026, for the acquisition of diesel multiple unit (DMU) commuter rail vehicles for the FrontRunner 2X project in cooperation with the Utah Transit Authority (UTA). The Department seeks proposals from qualified manufacturers to design, manufacture, test, furnish, deliver, and performance test a base order of 10 DMUs with associated goods and services including spare parts, training materials, manuals, special tools, and diagnostic equipment. The RFP also includes options for up to 40 additional DMUs and a DMU Operation Training Simulator. Questions must be submitted through the Bonfire eProcurement Platform by February 6, 2026, with a final addendum issued by February 11, 2026, and proposals due February 16, 2026. The Department anticipates award between March 9 and May 12, 2026, with Notice to Proceed 1 scheduled for June 22, 2026, and Notice to Proceed 2 twelve months thereafter. The procurement is structured as a cooperative procurement under Utah Code 63G-6a-2105(4)(b), allowing other public transit providers throughout the country to purchase vehicles under the resulting contract. A single contractor will be selected based on best value analysis combining technical and price evaluation criteria.
Proposals will be evaluated on a 1,000-point scale with 700 points allocated to technical factors including technical approach to work, schedule credibility, major subsystems and system integration experience, prior experience, organization and key personnel, and vehicle life cycle support, and 300 points for price proposals. All prices must be submitted in U.S. dollars with no escalation allowed for the base order, and proposers must provide certified cost or pricing data if adequate price competition is not demonstrated. Financial responsibility requirements include submission of three years of audited financial statements, evidence of ability to obtain required insurance, and a performance guarantee equal to 100 percent of the total contract price. The Department is exempt from federal excise and transportation taxes and state and local sales taxes, which must not be included in pricing. This procurement is subject to federal requirements including Buy America certification per 49 USC 5323(j) and 49 CFR Part 661, DBE requirements under 49 CFR Part 26, and FTA regulations. All proposals must remain valid for a minimum of 180 calendar days, and the Department reserves the right to request Best and Final Offers, conduct factory visits, reject any proposals, and cancel the procurement at any time before full execution.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UDOT Solicitation # UDOT250192MP-1
February 2, 2026
INSTRUCTION TO PROPOSERS Page | 1
INSTRUCTION TO PROPOSERS
Table of Contents
INSTRUCTION TO PROPOSERS
IP 1. Description of Work
IP 2. Anticipated Schedule for the Procurement
IP 3. Obtaining Proposal Documents
IP 4. (Reserved)
IP 5. Pre-Proposal Meeting/Information for Proposers (Reserved)
IP 6. Questions, Clarifications and Omissions
IP 7. Addenda to the RFP
IP 8. DBE Requirements for Transit Vehicle Manufacturers
IP 9. Buy America Certification
IP 10. Exceptions
IP 11. Protest Procedures
IP 11.1 Appeal IP 11.2 [Reserved] IP 11.3 [Reserved] IP 11.4 FTA Review
IP 12. Preparation of Proposal
IP 12.1 Use of Proposal Forms IP 12.2 Alternate and Multiple Proposals IP 12.3 Proposal Format and Submission Requirements
IP 12.4 PROPRIETARY/CONFIDENTIAL INFORMATION
IP 12.5 Signing of Proposal Forms IP 12.6 Modification or Withdrawal of Proposals IP 12.7 Ownership and Cost of Proposal Development
IP 13. Proposal Evaluation and Selection Process, General
IP 13.1 Reserved IP 13.2 Duration of the Validity of Proposals IP 13.3 Evaluation Committee(s) IP 13.4 Review of Proposals for Responsiveness and Proposer for Responsibility IP 13.5 Proposal Evaluations and Selection Process
IP 14. Response to Proposals
IP 14.1 Single Proposal Response IP 14.2 Availability of Funds IP 14.3 Department Contract Approval Process IP 14.4 Department Rights
INSTRUCTION TO PROPOSERS Page | 2
IP 14.5 Execution of Contract
IP 15. Conflicts of Interest; Gratuities
IP 16. Other General Requirements
IP 17. Examination of Proposal and Contract Documents
Exhibit A: SAMPLE PROPOSAL EVALUATION SCORE SHEET
Exhibit B: CERTIFICATIONS
CER 1: Proposer’s Checklist
CER 2: Request for Pre-Offer Clarification
CER 3: Acknowledgement of Addenda
CER 5: Pre-Award Evaluation Data Form
CER 6: Pricing Schedules
CER 7: Federal Certifications
CER 7.1: Buy America Certification CER 7.2: Debarment and Suspension Certification for Prospective Contractor CER 7.3: Debarment and Suspension Certification (lower-tier covered transaction) CER 7.4: Non-Collusion Affidavit CER 7.5: Lobbying Certification CER 7.6: DBE Approval Certification, Transit Vehicle Manufacturer Certification
CER 8: Proposal Form
CER 9: Vehicle Questionnaire
CER 10: Proposed Invoicing Schedule
CER 11: Litigation and Claims History Form
CER 12: Exceptions to Terms and Conditions of Contract Documents
CER 13: Claim of Business Confidentiality Form
INSTRUCTION TO PROPOSERS Page | 3
IP 1. Description of Work
The Department is soliciting Proposals from commuter rail vehicle manufacturers to design, manufacture, test, furnish, deliver and performance test diesel multiple unit commuter rail vehicles
(DMUs). The Work shall also include delivery of data, manuals, drawings, training and support services, spare parts, special tools and test equipment as described in the RFP. It is anticipated that this solicitation will result in an award to a single contractor.
The Work under the Contract will be set out as follows:
a. Base Order:
A base quantity of 10 DMUs and associated goods and services such as spare parts, training materials and parts and maintenance manuals, special tools and diagnostic equipment as described in the Contract;
b. Options:
i. Option for up to 40 additional DMUs and associated goods and services as described in the Contract, if exercised in the sole discretion of the
Department;
ii. Option for DMU Operation Training Simulator.
This Contract is part of a cooperative procurement under Utah Code 63G-6a-2105(4)(b), where the Work procured herein may be available for purchase by other public transit providers throughout the country.
The Department reserves the right to assign, in whole or in part, any of the options described in this RFP to one or more public transit providers (whether or not named herein) designated by the Department. To the extent the Department assigns its options to a third party, the third party will be solely responsible for all obligations with respect to the assigned options, and any contracts related thereto. If the
Department assigns, in whole or in part, an option to one or more public transit providers (whether or not named herein), the Department reserves the right for the public transit provider to vary the design or customize the DMU based on that particular public transit provider's preference, understanding that price may vary as a result of such design or customization. Any public transit provider who the Department designates as an assignee under the Contract must sign a participating addendum describing its rights and obligations under the Contract.
This procurement replaces procurement UDOT250192MP, which the Department released on July 1, 2025. For Proposers’ reference, the Department has included redlined versions of this RFP showing changes from the earlier procurement.
IP 2. Anticipated Schedule for the Procurement
The following is the anticipated schedule for this procurement. For the official schedule please refer to
Department’s Bonfire eProcurement Platform.
Event Date
Release of RFP February 2, 2026
Q&A Due February 6, 2026
Final Addendum February 11, 2026
Proposal Due Date February 16, 2026
Negotiation and contract award March 9, 2026 – May 12, 2026
NTP 1 June 22, 2026 https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0
INSTRUCTION TO PROPOSERS Page | 4
Event Date
NTP 2 Twelve (12) Months After Issuance of
NTP 1
The Department reserves the right to modify the procurement schedule as circumstances may warrant.
As indicated in the schedule above, the Department anticipates issuing multiple Notices to Proceed.
These are described in SP 3.1.2 Notices to Proceed and SP 3.1.6 Schedule and Mandatory Milestones of the Special Provisions.
IP 3. Obtaining Proposal Documents
Submission of the proposal and any other required documentation is done in the Department’s Bonfire eProcurement Platform using the platform link. New Proposers must complete the New Vendor
Registration sufficiently in advance to receive notices and addenda.
IP 4. (Reserved)
IP 5. Pre-Proposal Meeting/Information for Proposers (Reserved)
IP 6. Questions, Clarifications and Omissions
Questions MUST be submitted through the Bonfire system before the due dates for Q&A noted in IP 2 of this RFP. Questions submitted through any other channel will not be answered. Answers disseminated by the Department through the Bonfire system shall modify the specification or requirements of this solicitation only if confirmed by a written addendum to this solicitation. All correspondence, communication and contact in regard to any aspect of this solicitation or offers shall be only with the contact person identified in the Notice of Request for Proposals or his or her designated representative if applicable. Proposers and their representatives shall not make any contact with or communicate with any member of the Department, or its employees and consultants, other than the designated contact person, in regard to any aspect of this solicitation or offers.
Until the date and time specified in IP 2 as the deadline for receipt of Q&A, Proposers may request, in writing, a clarification or interpretation of any aspect, a change to any requirement of the RFP (including any change to the terms and conditions in the Contract Documents), or any addenda to the RFP. Such written requests shall be made using the Bonfire platform. The Proposer making the request shall be responsible for its proper delivery to the Department, as identified above, and on form CER 2, Request for Pre-Offer Clarifications.
Proposers submitting a question that contains proprietary or other confidential information may identify the question as confidential by submitting a Claim of Business Confidentiality Form provided as CER
13 in Exhibit B with the questions. The Department will review questions marked confidential and if it concurs that the question contains confidential information, will not make the question or response public. If the Department disagrees that the question contains confidential information, the Department will notify the Proposer submitting the question and provide the option to withdraw the question, amend the question, or allow the question to remain submitted without confidentiality protection. Proposers shall not provide information that discloses the Proposer’s identity in the body of the request for clarification. The Department will post responses to all questions received and answered (other than confidential or proprietary questions) on the Bonfire system.
If it should appear to a Proposer that the performance of the Work under the Contract, or any of the matters relating thereto, is not sufficiently described or explained in the RFP or Contract Documents, or that any conflict or discrepancy exists between different parts of the Contract Documents or with any https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0 https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0 https://udot-utah-gov.bonfirehub.com/portal/?tab=login https://udot-utah-gov.bonfirehub.com/portal/?tab=login
INSTRUCTION TO PROPOSERS Page | 5 federal, state, local or Department or Agency law, ordinance, rule, regulation or other standard or requirement, then the Proposer shall submit a written request for clarification to the Department within the time period specified above. The request for clarification should include a cross reference report which provides a clear comparison of the conflict or discrepancy in the format specified in CER2, Request for Pre-Offer Clarifications. At a minimum the cross-reference report shall include details of each issue, document titles, and section reference numbers for each item. Any such conflicts discovered after the submittal of the Proposal shall be resolved at the Department’s discretion.
All responses to CER 2, Request for Pre-Offer Clarifications, shall be provided to all Proposers through the Bonfire platform. Any response that is not confirmed by a written addendum shall not be official or binding on the Department.
IP 7. Addenda to the RFP
The Department reserves the right to amend the RFP at any time in accordance with IP 2, Proposed
Schedule for the Procurement. Any amendments to or interpretations of the RFP shall be described in written addenda. Notification of the addenda will be distributed through the Bonfire platform. Failure of any Proposer to receive the notification or addenda shall not relieve the Proposer from any obligation under the RFP as clarified, interpreted or modified. All addenda issued shall become part of the RFP.
Proposers should acknowledge the receipt of each individual addendum in their Proposals on form CER
3, Acknowledgement of Addenda.
If the Department determines that the addenda may require significant changes in the preparation of
Proposals, then the deadline for submitting the Proposals may be postponed. Any new Proposal Due
Date shall be included in the addenda. All official changes, Addenda and due dates will be updated in
Department’s Bonfire eProcurement Platform.
IP 8. DBE Requirements for Transit Vehicle Manufacturers
All respondents will be required to comply with the FTA’s DBE requirements found in 49 CFR Part 26 and referenced in the Federal Requirements section of the RFP. Only those transit vehicle manufacturers listed on FTA's eligible TVMs list, or that have submitted a goal methodology to FTA that has been approved or has not been disapproved, at the time of this solicitation will be eligible to submit a Proposal in response to this RFP. A Proposer, as a condition of responding to this RFP, must so certify, by completing form CER 7.6, DBE Approval Certification, Transit Vehicle Manufacturer Certification provided in Exhibit B.
IP 9. Buy America Certification
The Contract is subject to the “Build America, Buy America” (Pub. L. No. 117-58 §§ 70901-17) and its implementing regulation 2 C.F.R. Part 184, the requirements of 49 United States Code (USC) §5323(j) and 49 Code of Federal Regulations (CFR) Part 661, as may be amended from time to time, and any other applicable federal laws, regulations, or guidance. Proposers’ attention is directed to 49 CFR
§661.11, “Rolling Stock Procurements.” Proposers have the responsibility to comply with the cited and any governing statutes and regulations, including official interpretations.
A Proposer shall submit to the Department the appropriate Buy America certification, included in the
Federal Clauses section of the RFP. Proposals that are not accompanied by a properly completed Buy
America certification are subject to the provisions of 49 CFR 661.13 and may be rejected as nonresponsive.
The two signature blocks on the Buy America certificate are mutually exclusive. Proposers shall sign only one signature block on the certificate. Signing both signature blocks will make the Proposal nonresponsive. A false certification is a criminal act in violation of 18 USC §1001.
https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0
INSTRUCTION TO PROPOSERS Page | 6
A Proposer who has submitted an incomplete Buy America certificate or incorrect certificate of noncompliance through inadvertent or clerical error (but not including failure to sign the certificate, submission of certificates of both compliance and noncompliance, or failure to submit any certification), may submit to the FTA Chief Counsel within ten (10) days of Proposal opening a written explanation of the circumstances surrounding the submission of the incomplete or incorrect certification in accordance with 28 USC §1746, sworn under penalty of perjury, stating that the submission resulted from inadvertent or clerical error. The Proposer will also submit evidence of intent, such as information about the origin of the product, invoices, or other working documents. The Proposer will simultaneously send a copy of this information to the Department.
The FTA Chief Counsel may request additional information from the Proposer, if necessary. The
Department may not make Contract award until the FTA Chief Counsel issues his or her determination, except as provided in 49 CFR Part 661.15(m).
Certification based on ignorance of proper application of the Buy America requirements is not an inadvertent or clerical error.
A waiver from the Buy America provisions will be sought by the Department from the FTA, for the proposed awardee, if the grounds for a waiver exist. All Proposers seeking a waiver must submit to the
Department a timely request in writing, which shall include the facts and justification to support the granting of the waiver. Such waiver from the Buy America provisions may be granted if the FTA determines the following:
1. The application of the Buy America provisions would be inconsistent with the public interest;
2. Materials are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
3. Inclusion of domestic material will increase the cost of the overall Contract by more than 25 percent.
Any party may petition the FTA to investigate a successful Proposer’s compliance with the Buy America certification. The procedures are set out in 49 CFR Part 661.15. If the FTA determines the evidence indicates noncompliance, the FTA will require the Department to initiate an investigation. The successful Proposer has the burden of proof to establish compliance with its certification. If the successful Proposer fails to demonstrate compliance, then the successful Proposer will be required to substitute sufficient domestic materials without revision of the original Contract terms. Failure to do so will be a breach of the Contract and may lead to the initiation of debarment proceedings under 49 CFR
Part 29.
IP 10. Exceptions
Proposers may identify any exceptions to the terms and conditions contained in the Contract Documents on CER 12: Exceptions to Terms and Conditions of the Contract Documents. Proposers should note that as part of the Request for Clarifications process described in IP6, Proposers are required to raise any topics or issues relating to proposed exceptions to the terms and conditions contained in the Contract
Documents. In considering the proposed exceptions contained in CER 12, the Department may only consider proposed exceptions to the terms and conditions contained in the Contract Documents that would represent a material change to the Contract Documents if those proposed exceptions were previously raised by the Proposer in the Request for Clarifications process described in IP 6 and where the Department did not modify the Contract Documents in an addendum. The Department will evaluate proposed exceptions in its sole discretion and is under no obligation to accept any proposed exceptions to the terms and conditions. By submitting a Proposal, Proposer agrees to execute the Contract
Documents in the form included in the RFP without modification. A Proposer’s price proposal may not be conditioned on the Department’s acceptance of the exceptions contained in CER 12, and the prices
INSTRUCTION TO PROPOSERS Page | 7 submitted in the price proposal must be based on full compliance with the Contract Documents without the Department’s acceptance of the exceptions contained in CER 12. The Department and the selected
Proposer may negotiate the items contained in CER 12 and adjust the Contract Price if the Department’s acceptance of a proposed exception warrants such adjustment.
IP 11. Protest Procedures
All protests with respect to this RFP must be in writing and will follow the requirements in Utah Code
§63G-6a-1602 et seq and Utah Administrative Code R33-16. Deliver a written copy of any protest to:
Executive Director
Utah Department of Transportation
4501 South 2700 West, 1st Floor
Box 141245
Salt Lake City, UT 84114-1245
Any protest not set forth in writing within the time limits specified in Utah Code §63G-6a-1602 is null and void and will not be considered.
IP 11.1 Appeal
A notice of appeal must be delivered by the Protestor within seven (7) calendar days of the date of the
Procurement Officer’s decision. A notice of appeal addressed as follows:
Executive Director
Utah Department of Transportation
4501 South 2700 West, 1st Floor
Box 141245
Salt Lake City, UT 84114-1245
IP 11.2 [Reserved]
IP 11.3 [Reserved]
IP 11.4 FTA Review
After administrative remedies have been exhausted, an interested party may file a protest with the
Federal Transit Administration of the U.S. Department of Transportation pursuant to the procedures provided in the FTA Circular 4220.1G or successor circulars. FTA review is limited to matters primarily of federal concern.
Alleged violations of certain Federal requirements provide a separate complaint procedure. See, for example, Buy America Requirements, 49 CFR 661 (Section 661.15) and Participation by Disadvantaged
Business Enterprise in Department of Transportation Programs, 49 CFR 26.49.
Failure to comply with the above protest procedures will render a protest untimely and/or inadequate and shall result in its rejection.
https://le.utah.gov/xcode/Title63G/Chapter6A/63G-6a-S1602.html?v=C63G-6a-S1602_2017050920170509 https://le.utah.gov/xcode/Title63G/Chapter6A/63G-6a-S1602.html?v=C63G-6a-S1602_2017050920170509
INSTRUCTION TO PROPOSERS Page | 8
IP 12. Preparation of Proposal
IP 12.1 Use of Proposal Forms
Proposers are advised that the forms contained in this RFP should be used for submission of a Proposal.
All forms required must be submitted on the Department’s Bonfire eProcurement Platform.
IP 12.2 Alternate and Multiple Proposals
Submission of alternative Proposals, except as specifically called for in the RFP, will render a Proposal non-responsive and may cause its rejection.
Multiple Proposals from a single Proposer will not be considered.
IP 12.3 Proposal Format and Submission Requirements
Proposers shall upload one electronic original proposal to Department’s Bonfire eProcurement
Platform. Do not provide promotional or advertising information, unless this information is requested and/or is necessary to support the technical submittal. No hyperlinks will be allowed.
Proposals shall be formatted primarily to 8 ½ by 11 inch. 11 by 17 inch format may be used for charts, tables, and schedules as indicated in the Table in Section IP12.3.1. No text may be included on 11 by
17 inch size format except for text that is required for the interpretation of the chart, table, or schedule.
The Technical Proposal should be printed in a minimum of 12-point font.
The Qualifications and Technical Proposal (Package 2 and Package 4, if needed) is limited to 150 pages and must not exceed the page limit. Engineering drawings, reports describing route simulations, and resumes do not count toward the page limit. If a Proposal is submitted in double-sided format, both sides of the page will be counted against the Page Limit. All information that is submitted beyond that requested in this RFP and/or in excess of the first 150 pages will not be considered. Package 1 and
Package 3 are not subject to page limitations.
The Proposer shall not submit brochures or additional materials. At its discretion, the Department will not consider such additional materials in the selection of the successful Proposer.
Maximum file upload size in Department’s Bonfire eProcurement Platform is 1000 MB. Failure to follow the format described above may result in the Proposal being deemed non-responsive.
These same requirements shall apply to any Best and Final Offers (BAFOs) that may be requested.
The Proposal will comprise four packages, and shall be submitted and ordered in the appropriate sections as outlined below:
• Package 1: Certifications Package Requirements
• Package 2: Qualifications and Technical Proposal Package Requirements
• Package 3: Price Proposal Requirements
• Package 4: Proprietary/Confidential Information Package Requirements
The certifications required in these packages and referred to with the prefix “CER” are appended to this
IP section of the RFP.
IP12.3.1 Package 1: Certifications Package Requirements
1. Letter of Transmittal: This cover letter must be duly signed by the Contractor’s
Representative or representatives who have the requisite corporate and legal authority and authorization to bind the Proposer to a Contract, summarize the contents of the
Proposal and confirm the validity period of the Proposals. The cover letter must also https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0 https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0 https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0 https://eur02.safelinks.protection.outlook.com/?url=https%3A%2F%2Futah.bonfirehub.com%2Fprojects%2F192206%2Fdetails&data=05%7C02%7CElizabeth.Buonanno%40wsp.com%7C6b3a0598cc15400d50d108ddb43b134f%7C3d234255e20f420588a59658a402999b%7C1%7C0%7C638864887993413347%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=iyOLAyTac2W%2BE9HBsgy%2BLERbxjmPaZvKx7oxhImgGXE%3D&reserved=0
INSTRUCTION TO PROPOSERS Page | 9 identify the contact person for the Proposer, including, title, address, telephone number, facsimile number, and Electronic-mail (E-mail) address for such person. The letter must also include the information required in IP 12.5.
2. CER 3: Acknowledgement of Addenda
3. CER 5: Pre-Award Evaluation Data Form
4. CER 7.1: Buy America Certification
5. CER 7.2: Debarment and Suspension Certification, Prospective Contractor
6. CER 7.3: Debarment and Suspension Certification, lower tier covered transactions
7. CER 7.4: Non-Collusion Affidavit
8. CER 7.5 Lobbying Certification
9. CER 7.6 DBE Approval Certification
10. CER 8: Proposal Form
11. A copy of the three most recent annual financial statements audited by an independent third party. If the Proposer is structured as a Joint Venture, then each member of the Joint
Venture shall provide a copy of the three most recent annual financial statements audited by an independent third party. The Department specifically reserves the right to require additional information as may be necessary to demonstrate the Proposer’s financial capability to perform the work described in this RFP.
12. Letter for insurance, indicating the Contractor’s ability to obtain the insurance coverage in accordance with the RFP requirements
13. Letter indicating the Proposer’s ability to obtain a Performance Guarantee in accordance with SP5.1 of the Special Provisions. The Performance Guarantee can take the form of a letter of credit, a performance bond or a parent company guarantee.
14. Joint venture agreement, if applicable, as provided in IP 12.5.
15. CER 12: Exceptions to Terms and Conditions of the Contract Documents.
IP12.3.2 Package 2: Qualifications and Technical Proposal Package Requirements
The Qualifications and Technical Proposal package is to include seven tabs organized as shown in the
Table below.
Proposal
Tab#
Title Contents ITP Reference
1 CER9: Vehicle Questionnaire See format for CER9: Vehicle
Questionnaire
Exhibit B
2 CER11: Litigation and Claims
History Form
See format for CER11: Litigation and
Claims History Form
Exhibit B
3 Overall vehicle description Vehicle performance requirements
General arrangement drawings
Transverse section drawings
Longitudinal section drawings
System interface drawings
Vehicle weight schedule
Dynamic performance
IP12.3.2 para 3
INSTRUCTION TO PROPOSERS Page | 10
Proposal
Tab#
Title Contents ITP Reference
Vehicle systems and systems suppliers narrative
4 Technical Approach to the
Work
4.1 Design planning and
management
Design flowchart
Narrative of flowchart
QA plan and narrative
Preliminary Design Management Plan
IP12.3.2 para 4.1
4.2 Manufacturing planning, quality assurance, and
workflow
Manufacturing process flowchart
Narrative of process flowchart
QA flowchart
Narrative of QA flowchart
Preliminary Quality Management Plan
IP12.3.2 para 4.2
4.3 Manufacturing capacity and
capability
Narrative IP12.3.2 para 4.3
4.4 Schedule Credibility Critical path method schedule
Narrative of schedule
IP12.3.2 para 4.4
5 Experience
5.1 Past similar experience Narrative IP.12.3.2 para 5.1
5.2 Supplier and subcontractor
experience
Narrative IP.12.3.2 para 5.2
5.3 History of Performance Narrative IP.12.3.2 para 5.3
6 Organization and Key
Personnel
Narrative
Program organizational chart
Resumes for key personnel
IP.12.3.2 para 6
1. CER 9: Vehicle Questionnaire
Proposers shall complete CER9: Vehicle Questionnaire in the format provided in the RFP and submit it with the Technical Proposal.
2. CER 11: Litigation and Claims History Form
Proposers shall complete CER11: Litigation and Claims History Form in the format provided in the
RFP and submit it with the Technical Proposal.
3. Overall Vehicle Description
i. Vehicle Performance Requirements: Provide simulations and descriptions for end-to-end service run times and total vehicle range.
ii. General arrangement drawings. Provide eight (8) general arrangement drawings to scale with appropriate dimensions that indicate the following:
INSTRUCTION TO PROPOSERS Page | 11
• Vehicle plan view (external);
• Vehicle side view (external);
• Vehicle front view (external);
• Vehicle roof equipment arrangement (external);
• Vehicle seating arrangement (internal plan view);
• Vehicle underframe equipment arrangement;
• Vehicle interior equipment arrangement; and
• Cab console arrangement.
iii. Transverse section drawings. Provide five (5) transverse sections at the following locations:
• High floor section(s);
• Low floor section end door;
• Low floor section between doors;
• Low floor section center door; and
• Low floor center section
• Power section or segment.
iv. Longitudinal section drawings. Provide two (2) longitudinal sections at the following locations:
• Centerline of the car; and
• Reflected ceiling plan.
v. System Interfaces. Provide drawings to demonstrate compatibility with
UTA’s system infrastructure. Include interfaces to demonstrate compatibility with UTA’s platforms, including all unique platform features such as artwork, planters, pavilion/canopy structures, etc.
• Demonstrate full compatibility with all UTA platforms, tail tracks, signals, yards, and system infrastructure, including but not limited to:
• Regular boarding
• Berthing
• Level boarding
• UTA gap filler
vi. Vehicle Weight Schedule Provide passenger numbers and a gross vehicle weight schedule as follows (including train Operator except for
AW0, as further defined in TS 1.2.2, Definitions):
vii. Dynamic Performance
Load
State
Passenger Criteria # of Passengers Total weight (@
165 lbs. per passenger)
AW0 Empty 0
AW1 Fully seated
AW2 Seated + standees @ 4/m2
AW3 Seated + standees @ 6/m2
INSTRUCTION TO PROPOSERS Page | 12
Provide the traction and brake effort performance curves for each propulsion system proposed. Plots of acceleration vs vehicle speed, and tractive effort under normal and reduced performance modes shall be included. Further, submit the matrix described in TS 12.3.1(21). In addition, the Proposer shall submit, for each candidate propulsion system, a computer simulation of round-trip performance for their proposed consist length equivalent over the
Frontrunner system as described in TS 1.3.1. The computer model shall be based on the parameters defined in TS 2, Design and Performance Criteria, and the following conditions:
• New wheels;
• AW2 passenger load;
• 8 s dwell time at each intermediate station;
• 30 s layover at each terminus;
• Maximum service acceleration and braking performance; and
• Maximum allowable speeds for alignment conditions, grades, curves, etc.
The computer model shall output the following:
• End-to-end round trip time;
• Provide dwell times for each proposed car length to include passenger loading and unloading times.
• Provide times to travel between each station platform.
• Average schedule speed;
• Total fuel consumption as a function of speed;
• A report describing the methods used to conduct the simulation shall be included as an appendix. The report shall contain enough information for a competent 3rd party to duplicate the results. This report will not count against the page limit.
viii. Vehicle Systems and Systems Suppliers
The major vehicle systems from the Vehicle Questionnaire are defined as:
• Section 3: Carbody exterior
• Section 4: Coupler
• Section 5: Operator’s cab
• Section 6: Doors
• Section 7: Heating, ventilation, and air conditioning (HVAC)
• Section 8: Lighting
• Section 9: Electrical
• Section 10: Propulsion system
• OESS solution if proposed, including capacity, charging, service life, battery management, and overall maintenance
• Section 11: Trucks
• Section 12: Friction brake system
• Section 13: Communications
• Section 14: Positive train control system
• Section 15: Carbody interior
• Section 17: Monitoring and diagnostics
INSTRUCTION TO PROPOSERS Page | 13
The Proposer shall provide a brief description of each of the major systems as offered by each Proposed Supplier for the Contract. Description shall include the following:
• All appropriate system and component ratings;
• Basic system configuration;
• Model numbers of major components;
• Service history of each proposed system, including:
• Property references;
• Contact person; and
• Car miles and time in revenue service to date;
• Available reliability data;
• Identification of any differences between the proposed system and existing service-proven designs; and
• Identification of microprocessor and software main features, when applicable.
• The brief descriptions of the major systems shall be tabbed or denoted in the order listed.
ix. Commissioning spare parts
Proposer shall submit a list of spare parts to support testing and warranty requirements, as defined in TS 22.4.2, in its Technical Proposal. All spare parts and necessary equipment to support DMU testing and warranty requirements and to perform necessary repairs within 48 hours of an initial failure report shall be included.
x. Long lead items
The Proposer shall submit a comprehensive list of long lead components with specific lead times to meet the requirements of TS 22.4.1.
4. Technical Approach to the Work
4.1 Design planning and management
a. Proposer shall demonstrate, through a single flow chart and narrative, how the vehicle design effort will be managed. The narrative should be keyed to the flow chart. Factors that should be addressed in both the flow chart and narrative include the following:
• Where the design effort for each major vehicle system and/or component will take place;
• How the Proposer will ensure that the design (including subcontractor designs) incorporates all requirements stated in the Technical Specification;
• How the Proposer will coordinate the design effort amongst the various subcontractors; that is, how the systems engineering and integration effort will be set up, managed, and carried out;
• How quality assurance of the design will be implemented;
• Description of checks and balances in place to ensure a safe design;
• How the Department’s engineering review comments will be fed back into the overall engineering design effort;
INSTRUCTION TO PROPOSERS Page | 14
• How first article and design qualification testing results will be fed back into the overall design effort; and
• How any language translation times will be accounted for as part of the design, manufacturing, QA, and testing processes.
b. Proposer shall submit a preliminary Design Management Plan that addresses the requirements of TS 19.2.
4.2 Manufacturing planning, quality assurance and workflow
Proposer shall demonstrate, through a single flow chart and narrative, how the manufacturing effort will be managed. A second flow chart and narrative shall be provided to describe the Proposer’s quality assurance organization. The narrative in each case should be keyed to the flow chart. Factors to be addressed include the following:
• Interface and controls between the Proposer’s design and manufacturing groups;
• Interface and controls between Proposer’s and supplier’s/subcontractor’s manufacturing groups;
• Carbody assembly facility work-flow and stationing;
• Material control;
• A complete description of the Proposer’s quality assurance program. This description must include the following:
o The structure of the Proposer’s QA department;
o The number of QA professionals expressed as a percentage of the total manufacturing workforce;
o How quality assurance maintains independence from manufacturing;
o How quality control inspectors maintain independence from manufacturing;
o How quality control problems are fed back into the manufacturing process and resolved; and o How configuration control is managed.
• Proposer shall submit a preliminary Quality Management Plan that addresses the requirements of
TS 20.
• Proposer’s documentation resources, including all specifications and standards identified in the
Technical Specifications. Proposer shall submit manual samples to meet the requirements of TS
22.2.1 addressing the manual style, format, and construction.
4.3 Manufacturing capacity and capability
Proposer shall provide a comprehensive description of its manufacturing capability, including the following:
• Identification of Proposer’s current workload, backlog, and capability to implement this order at each manufacturing facility.
• Identification of the location where the car shell will be manufactured (per Vehicle Questionnaire) and the experience level of this location in performing this type of work.
• Identification of the location where the truck frames will be manufactured (per Vehicle
Questionnaire) and the experience level of this location in performing this type of work.
• Full description of the equipment, special machinery, and test facilities available at the car shell manufacturing facility.
INSTRUCTION TO PROPOSERS Page | 15
• Location of the following test facilities:
o Carbody structural test facility;
o Truck static load and fatigue test facility; and o Climate room test facility.
• Identification of all locations where major subassembly work will be performed.
• Identification of the location of final assembly and the experience level of this location in performing this type of work.
• Identification of the location of truck assembly (per Vehicle Questionnaire) and the experience level of this location in performing this type of work.
INSTRUCTION TO PROPOSERS Page | 16
4.4 Schedule Credibility
Schedule is of high importance in this procurement. The Proposer shall address how it intends to divide its work between NTP 1 and NTP 2 in accordance with SP 3.1.2 of the Special Provisions. Proposer shall also identify other Notices to Proceed that Proposer may request prior to NTP 2 to perform limited or discrete elements of the work. However, the schedule may not rely or be conditioned on receipt of any limited Notices to Proceed prior to NTP 2.
The Proposer shall submit a Critical Path Method (CPM) schedule indicating reasonability of achieving the key milestone dates including but not limited to the requirements of sub-section TS 20.3.2. As a minimum, the events to be included in the Proposer’s schedule are as follows (Proposer may include additional events as appropriate):
• Submittal of general arrangement drawings
• Each major subsystem contractor placed under contract
• Completion of activities associated with vehicle design
• First Article Inspections of major subsystems and components
• Commence first car shell parts manufacture
• Commence first car shell major assemblies
• Complete first bare car shell prior to painting
• Car shell static load test
• Complete first vehicle set of truck frames
• Truck frame fatigue test
• Ship first vehicle shell to final assembly site, if separated
• Commence first vehicle final assembly
• Complete equipment installation on first vehicle
• Final truck mounting on first vehicle
• First Article Inspection of first vehicle
• Shipment of first car to the vehicle maintenance facility
• Arrival of first car at the vehicle maintenance facility
• Delivery of first car to the vehicle maintenance facility
• Complete design qualification test series on first two vehicles
• Climate room qualification test
• Complete each vehicle shell
• Factory acceptance of each vehicle
• Ship each car to the vehicle maintenance facility
• Arrival of each car at the vehicle maintenance facility
• Commissioning of each vehicle
• Conditional Acceptance of each vehicle
• Reliability demonstration test
• Final Acceptance
• Final Completion
INSTRUCTION TO PROPOSERS Page | 17
5. Experience
5.1 Past similar experience
The Proposer shall provide a description of its recent design and manufacturing experience in providing
DMUs, including fleets presently under design and/or construction. Include the following for each commuter rail car order:
• Purchasing agency.
• Contact person (including phone number) at the purchasing agency. The Department may discuss the success of the procurement with each named individual.
• Order size.
• Schedule performance in delivery of the cars; i.e., original contract requirements vs. actual delivery.
• Significant differences between the commuter rail vehicle supplied and the vehicle specified herein.
• Revenue service miles accrued to date.
• Any reliability/availability data available.
• The referenced experience should demonstrate competency with FTA and Federal Railroad
Administration (FRA) laws, regulations, standards, rules, and orders.
5.2 Supplier and subcontractor experience
For each Supplier/Subcontractor proposed for each item of the major vehicle systems, the Proposer shall provide a description of the Supplier/Subcontractor’s relevant experience in the design and supply of that type system on commuter rail vehicles. Include the following for each major system order:
• Car builder and vehicle type;
• Purchasing agency;
• Contacts at the purchasing agency, for reference purposes;
• Model number (or other identifier) of the system provided;
• Number of units provided;
• Significant differences between the system to be supplied and the system specified by the
Department;
• Schedule performance in delivery of the system, including original promised delivery and actual delivery of systems; and
• Available reliability data.
5.3 History of performance: Proposer shall submit a description of the history of performance of its proposed systems and subsystems in the rail industry including but not limited to the following areas:
• Carbody
• Trucks
• Propulsion
• Auxiliary inverter/battery
• Friction braking
• HVAC
INSTRUCTION TO PROPOSERS Page | 18
• Communications
• Cab and trainline controls
• Door systems
• Coupler systems
• Train control
• Engine
• Power source
• Onboard Energy Storage Systems
6. Organization and Key Personnel
Proposer shall demonstrate the adequacy of its staffing plan by providing the following:
• Program organization chart, including definitions of the functions shown thereupon. The chart shall indicate the authority and placement of all key program personnel, including the Project
Manager, Safety Manager, Project Lead Engineer, the System Integrator, the Quality Manager, Operations & Maintenance Lead Engineer, and Lead Design Engineers responsible for vehicle system design including but not limited to carbody and structure, truck, propulsion, brakes, communication systems, interior, exterior, and electrical design, etc.. All Key Personnel specified in the RFP shall be subject to the conditions specified in SP 7.1.
• The Program organization chart must show reporting relationships among key personnel and demonstrate how key personnel will interface with the Department (including, on-site inspectors hired by the Department). Specifically, the organization chart and accompanying narrative must show how the Contractor will manage coordination with and incorporation of input from UTA.
• Descriptions of experience related to key program personnel must indicate the roles such persons played with respect to representative experience. Experience cited must include the name of the owner, the date the work was completed, contact information (including telephone number) for a current owner contact familiar with the key person's role, and a comprehensive description of the work performed.
• Key supplier/subcontractor personnel who will interface regularly with the Proposer, and who will be given significant program authority, shall also be shown on this chart.
• Engineering design manpower loading requirements vs. projected availability.
• Quality assurance manpower loading requirements vs. projected availability.
• Manufacturing manpower loading requirements vs. projected availability.
The Proposer shall provide résumés for all key personnel listed on the organization chart (including supplier/subcontractor personnel, as appropriate). Each résumé shall contain the following, in the order given below:
• Corporate title and affiliation;
• Program title;
• Relevant education;
• Relevant experience;
• Brief description of the program function to be fulfilled, including decision-making responsibilities; and
• Percentage of time dedicated to this program.
INSTRUCTION TO PROPOSERS Page | 19
IP12.3.3 Package 3: Price Proposal Requirements
Each price proposal shall be on the prescribed Proposal form(s) and shall be for the entire Contract, including all Proposal items.
1. CER 6: Pricing Schedule
a. Base vehicle pricing: Shall be provided as specified in CER 6 Pricing Schedule, “Base
Contract” table items No 1-2. The base vehicle pricing shall include the cost of the options, which consists of the cost to the Department for owning the right to hold and exercise the options. The option cost does not include any cost of the optional vehicle or other items, but only the cost of the option itself. Proposer shall separately state the price of the option itself, for information only, as provided in IP 12.3.3(1)(e) below.
b. Optional vehicle pricing: Pricing for optional vehicles shall be provided as specified in
CER 6 Pricing Schedule, “Options” table, Items No 1-2. Option prices shall represent the unit price per vehicle for providing the option vehicles. No escalation shall be included in the optional vehicle pricing, but may be applied in accordance with the escalation provision of the Special Provisions. The option vehicles shall be evaluated based on price only.
c. DMU Operation Training Simulator: Pricing for an optional DMU Operation Training
Simulator shall be provided, as referenced in CER 6 Pricing Schedule, “Options” table, Item No 3.
d. Additional Options: Additional spare parts, special tools, test equipment and manuals, drawings, training and training manuals, illustrated parts catalog, and publications, in accordance with SP 8.4.
e. Options Price: Provide the separate pricing for the 40 options that is included in the base vehicle pricing. This price is for the Department’s information only and will not be added to the total cost of the options shown on CER 6. This price is only the price of the options themselves, not the cost of the optional items.
The Proposer is required to complete and execute the Department’s Pricing Schedule, contained as part of the Proposal documents, and provide it in the Price Proposal. All prices submitted on
CER 6: Pricing Schedule must reference the United States (US) Dollar. No escalation will be allowed with respect to base order DMU quantities. Pricing for the option quantities will not be evaluated as part of the award of the Contract. Prices must be inclusive of all costs associated with the work indicated in the Contract, including, overhead, profit, packing, import, duties, transportation and delivery charges, and all other costs. The Department is exempt from federal excise and transportation taxes and state and local sales taxes; these taxes must not be included in the pricing.
2. CER 10: Proposed Invoicing Schedule
Proposers shall complete CER10: Proposed Invoicing Schedule in the format provided in Exhibit
B and submit it with the Price Proposal.
INSTRUCTION TO PROPOSERS Page | 20
IP12.3.4 Package 4: Proprietary/Confidential Information Package Requirements
Proposer is directed to IP12.4 for instructions on designating parts of its Proposal as
Proprietary/Confidential. If there is no confidential information, then the Proposer shall include a statement to that effect. Blanket-type identification by designating whole pages or sections as containing proprietary information, trade secrets or confidential commercial and financial information will not ensure confidentiality. The specific proprietary information, trade secrets or confidential commercial and financial information must be clearly identified as such.
The Proposer is advised that the Department is a public agency and as such may be subject to certain state and/or local public records act provisions regarding the release of information concerning this RFP.
If a request is received by the Department for the release of Proposer’s propriety/confidential information, then the subject request will be referred to the Proposer for review and consideration. If
Proposer declares the information proprietary/confidential and requests that it be withheld and the
Department agrees to withhold the information, then the Proposer shall defend and hold the Department harmless from any legal action arising from such a declaration.
IP 12.4 PROPRIETARY/CONFIDENTIAL INFORMATION
Portions of a Proposal may be protected by submitting a Claim of Business Confidentiality Form provided as CER 13 in Exhibit B.