This document contains a pricing schedule for the construction of the Bismarck O&M Service Center Vehicle Storage Building No. 4. The schedule outlines seven contract line items for the project including a pre-engineered building, civil site preparation, concrete work, mechanical and plumbing systems, fire protection, electrical systems, and related demolition. Offerors are invited to provide lump sum pricing for each line item. The solicitation was issued by the Department of Energy Western Area Power Administration for the construction of the vehicle storage building located in Bismarck, North Dakota.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 80 00 – PRICING SCHEDULE
WAPA 01 80 00-1 REVISION 1 – 8/11/2020
Bismarck VSB
BISMARCK VEHICLE STORAGE BUILDING
BID SCHEDULE
(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) The quantities in the schedule are estimated quantities for comparison of offers only, and except as provided in the contract clause at FAR 52.211-18, Variation in Estimated
Quantity, no claim shall be made against the Government for overruns or underruns.
(1) CLIN – Contract Line Item Number
CLIN
No.
Bid Item Estimate Quantity
2 Pre-Engineered Building (Includes materials, fabrication, delivery, offloading, storage, erection.
Includes all mandoors, overhead doors, door operators, gutters, insulation, flashing, sealing, framed openings, miscellaneous steel, and downspouts)
Lump Sum
3 Civil Site Prep (Includes demobilization, clearing, grubbing, demolition, disposal, underground utilities, sewer, manholes, storm drains, oil/water separator, duct bank, trenching, backfill, traffic control, signage, surveying, staking, laydown areas, construction trailers, temporary utilities, erosion control, etc.)
Lump Sum
4 Concrete (Includes foundations, grade beams, slabs on grade, truck aprons, ramps, sidewalks, trench drains, pipe bollards, anchor bolts, and associated excavation, backfill, and structural fill for these structures)
Lump Sum
5 Mechanical and Plumbing (Includes hydronic heating system, boilers, pumps, eye wash stations, air handlers, fans, ductwork, louvers, hose bib stations, valves, meters, and local controls complete mechanical and plumbing systems)
Lump Sum
6 Fire Protection (Includes alarms, detection, wiring, notification, programming, and sprinkler piping
Lump Sum
Amendment 0001 Solicitation No. 89503420BWA000020
SECTION 01 80 00 – PRICING SCHEDULE – CONTINUED:
WAPA 01 80 00-2 REVISION 1 – 8/11/2020
Bismarck VSB for a complete system)
7 Electrical (Includes grounding systems, lightning protection systems, lighting fixtures, lighting controls exit signs, receptacles, conduit, cabling, terminations, panelboards, breakers, transformers, communication vaults, controls etc. for a complete electrical system)
Lump Sum