DRAFT Attachment J-9 Contract Work Breakdown Structure.pdf
PDF 869 KB Posted
- Solicitation number
- 80MSFC24R0015
About this file
This document is a Draft Attachment J-9 for NASA's Engineering Services and Science Capability Augmentation (ESSCA II) Contract Work Breakdown Structure (CWBS). The document details a seven-level decimal coding structure for technical management and financial tracking of task orders and delivery orders across NASA centers. The CWBS provides a systematic approach to identifying and categorizing work, with each level representing specific information: Level 1 identifies the NASA center, Level 2 indicates the performing organization, Level 3 specifies the required skill, Level 4 defines the task ID, Level 5 shows the funding source, Level 6 indicates the funding sub-source, and Level 7 represents the activity.
As of December 2024, the contract has 131 total tasks, 3,332 subtasks, and 3,136 revisions, with 94 currently active tasks and 1,212 active subtasks. The coding structure allows for tracking tasks across multiple NASA centers including Ames, Glenn, Armstrong, Goddard, Marshall, Stennis, Johnson, and Kennedy Space Centers. The document includes tables detailing organizational symbols, skill categories (such as Aero-Science Design, Avionics Systems, Propulsion Systems), and provides two detailed CWBS examples demonstrating how the multi-level coding system is applied to specific task orders at the Marshall Space Flight Center.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .