This is Amendment 2 to NASA's Mission Technical Integration Contract (MTIC) RFP 80JSC025R7002, which replaces the original RFP issued on January 30, 2025. The amendment updates several sections including changes to labor categories, conference facilities requirements, and various technical specifications. Key changes include removing overtime labor categories for Analyst I and Support Specialist, adding a new overtime rate table, updating the Contract Management Plan scope, modifying parking requirements for conference facilities from 75% to 50% capacity, and various updates to proposal submission requirements. The amendment also includes detailed requirements for supporting NASA's International Space Station Program, Gateway Program, Orion Program, EVA and Human Surface Mobility Program, Commercial LEO Development Program, Commercial Crew Program, and other exploration initiatives through technical integration, configuration management, information technology, systems engineering, mission planning, operations, safety and mission assurance, and research activities. The full proposal is due March 4, 2025 at 1:00 PM CT, with Past Performance requested 2 weeks early. Questions are due by February 10, 2025. A pre-proposal conference will be held via Microsoft Teams on February 7, 2025.
The contract includes a 45-day phase-in period starting August 17, 2025, a 2-year base period from October 1, 2025 through September 30, 2027, four 1-year options, and a 6-month option to extend services. The contract type is Cost-Plus-Award-Fee (CPAF) & Cost-Plus-Incentive-Fee (CPIF) with Core and IDIQ requirements, and includes options to convert between CPAF and Cost-Plus-Fixed-Fee (CPFF). The phase-in period is Firm-Fixed-Price. The contract supports multiple NASA programs with work performed primarily at Johnson Space Center and contractor facilities, with some requirements at Kennedy Space Center, Marshall Space Flight Center, Moscow Mission Control, and other locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment J-19 Managed Documents Amendment 2.xlsx | XLSX spreadsheet | |
| L-6A MTIC Cost Price Template Amendment 2.xlsx | XLSX spreadsheet | |
| L-5 Technical Resources Template Amendment 2.xlsx | XLSX spreadsheet | |
| L-7 MTIC TCP Rate Build-Up Form Amendment 2.xlsx | XLSX spreadsheet | |
| MTIC Request For Proposal Questions and Answers.pdf | ||
| MTIC Request For Proposal 80JSC025R7002 - Amendment 1.pdf | ||
| MTIC Pre-Proposal Conference Presentation.pdf | ||
| MTIC Request For Proposal - 80JSC025R7002.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
PAGE OF PAGES
3. EFFECTIVE DATE 5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO.
7. ADMINISTERED BY (If other than Item 6) CODE
FACILITY CODECODE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code)
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
1. CONTRACT ID CODE
16B. UNITED STATES OF AMERICA 16C. DATE
SIGNED
15B. CONTRACTOR/OFFEROR 15C. DATE
SIGNED
(Signature of Contracting Officer)(Signature of person authorized to sign)
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
is not
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by orletter provided electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, E. IMPORTANT: Contractor is not, is required to sign this document and return
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) is extended, copies to issuing office.
4. REQUISITION/PURCHASE REQ. NO.
2 02/25/25
Omar Collier NASA Johnson Space Center 2101 NASA Parkway Houston TX 77058-3696
1J044
80JSC025R7002
Omar Collier appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
CHECK ONE
(X) electronic communication, orlettereach
(X)
(X)
Amendment 2 replaces the Request For Proposal issued on 01/30/2025 in its entirety. See Page 2 for additional details.
01/30/2025 x
List of Changes from Request For Proposal Amendment 1 to Amendment 2
Section Page Description of Change
B.6 FULLY
BURDENED
RATE TABLE
B-4 Removed “Analyst I – Overtime” and “Support Specialist
– Overtime” Standard Labor Categories from Table B-3.
Updated title of Table B-3 from “Fully Burdened Rate per Hour Table” to “Straight-Time Fully Burdened Rate per Hour Table”.
Added Table B-4 Overtime Fully Burdened Rate per Hour Table.
Updated footnote from “Fully Burdened Labor Rates (FBLR) (e.g., Fringe, OH, G&A, etc.) exclusive of fee.” to “Straight-Time and Overtime Fully Burdened Labor Rates (FBLR) (e.g., Fringe, OH, G&A, etc.) exclusive of fee.”
Attachment J-1, MTIC-PM-01, Contract Management Plan
J-1-49 Updated scope from “Program Management Plan” to “Contract Management Plan”.
Updated Date Issued from “January 2025” to “February 2025”.
Attachment J-1, MTIC-PM-06, Financial Reporting of
Contractor Held Property
J-1-60 Updated title from “ISS Program IT Capital Investment Plan (CIP)” to “Financial Reporting of Contractor Held Property”.
Updated Date Issued from “January 2025” to “February 2025”.
Attachment J-5, Standard Labor
Categories (SLCs)
J-5-2 Updated Consultant SLC to “Exempt”.
Updated Secretary and Clerk SLCs from “exempt” to “Non-exempt”.
Updated Multiple SLCs to include “Graduate degree(s) may substitute for some of the years of experience.”
Updated Examples of Mapping Skills Into SLCs example from “Administrative Assistant” to “Analyst I”.
Attachment J-8, Conference Facilities
Management
J-8-1 Updated 1.1 Conference Facility (G) from “Have vehicle parking to accommodate 75% of meeting room capacity at any one time.” to “Have vehicle parking to accommodate 50% of meeting room capacity at any one time.”
Attachment J-19 Managed
Documents
N/A Removed “SSP 540XX 540YY ANX 3”.
L.14, Security Requirements and
Instructions to Offerors
L-7 Updated to move “This clearance shall be maintained throughout the life of the contract.” to the last sentence of the paragraph.
L.19A Management
Approach, Mission Suitability (Sub-factor A)
L-17 Updated MA3. Total Compensation Plan (TCP) to include “Subcontractors may submit their files directly to the Government (Reference Provision L.16, ELECTRONIC
SUBMISSION OF PROPOSALS – PROPOSAL
MARKING AND DELIVERY THROUGH NASA’S EFSS
BOX) if Subcontractor information is deemed proprietary and not shared with the Prime.”
L.21 Volume III, Cost and Price
Factor
L-27 Updated (b)(6) to include “If needed, the Offeror is able to add rows, columns, and adjust the excel formula in excel workbook Attachment L-6A to be consistent with their accounting and disclosure practices. However, the offer shall not change the excel table organization or design within each spreadsheet tab.”
Updated (d)(4)(i) to from “If needed, the Offeror is able to add rows, and adjust the excel formula to be consistent with their accounting and disclosure practices.” to “If needed, the Offeror is able to add rows, columns, and adjust the excel formula to be consistent with their accounting and disclosure practices.”
L.23 Volume V, Model Contract
L-42 Updated Section B from “B.6, Table B-3 - Complete the Fully Burdened Rate Table” to “B.6, Table B-3 - Complete the Straight-Time Fully Burdened Rate per Hour Table and the Overtime Fully Burdened Rate Table and B-4”
M.5 Factor 2, Past Performance
(Volume II)/Past Performance Evaluation
M-5 Added "determine" to M.5 (d) Relevance in the first sentence.
L-5 Technical Resources Template
N/A Removed “Analyst I – Overtime” and “Support Specialist
– Overtime” Standard Labor Categories.
L-6A MTIC Cost Price Template
N/A Removed “Analyst I – Overtime” and “Support Specialist
– Overtime” Standard Labor Categories.
Added Overtime Table to tab "IDIQ Proposed FBLR"
L-7 MTIC TCP
Rate Build-Up
Form
N/A Removed “Analyst I – Overtime” and “Support Specialist
– Overtime” Standard Labor Categories.
80JSC025R7002 Section A
MISSION TECHNICAL INTEGRATION CONTRACT (MTIC)
A-1
TABLE OF CONTENTS
SECTION A – SOLICITATION/CONTRACT FORM
CONTRACT COVER PAGE (AWARD FORM) A-1
TABLE OF CONTENTS – MTIC CONTRACT STRUCTURE A-2
PART I – THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE B-1
B.2 DESCRIPTION OF WORK AND CONTRACT TYPE- B-1
B.3 CONTRACT VALUE B-2
B.4 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (JSC 52.216-90)
(NOV 2018) B-3
B.5 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990) B-4
B.6 FULLY BURDENED RATE TABLE B-4
SECTION C - STATEMENT OF WORK C-1
SECTION D - PACKAGING AND MARKING
D.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE D-1
D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT
EQUIPMENT (JAN 2011) D-1
SECTION E - INSPECTION AND ACCEPTANCE
E.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE E-1
SECTION F - DELIVERIES OR PERFORMANCE
F.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE F-1
F.2 PERIOD OF PERFORMANCE F-1
F.3 OPTION TO EXTEND PERIOD OF PERFORMANCE F-2
F.4 PLACE OF PERFORMANCE F-3
F.5 SHIPPING INSTRUCTIONS F-4
F.6 PHASE-IN AND CLOSE-OUT F-4
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE G-1
A-2
G.2 NFS 1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018) G-1
G.3 NFS 1852.232-80 SUBMISSION OF VOUCHERS/INVOICES FOR PAYMENT
(APR 2018) G-3
G.4 NFS 1852.245-71 INSTALLATION-ACCOUNTABLE GOVERNMENT
PROPERTY ALTERNATE I (JAN 2011) G-4
G.5 NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE
CUSTODY OF CONTRACTORS (JAN 2017) G-6
G.6 NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED
PURSUANT TO FAR 52.245-1 (JAN 2011) G-8
G.7 NFS 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS
(SEP 2017) G-8
G.8 NASA SECURITY PROGRAM AND IDENTIFICATION OF EMPLOYEES
(JSC 52.204-92) (JUL 2022) G-9
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE H-1
H.2 NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988) H-1
H.3 NFS 1852.225-70 EXPORT LICENSES ALTERNATE I (FEB 2000) H-3
H.4 NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989) H-3
H.5 JSC ENVIRONMENTAL COMPLIANCE (JSC 52.223-94) (NOV 2024) H-4
H.6 ASSOCIATE CONTRACTOR AGREEMENT FOR MTIC ACTIVITIES H-7
H.7 MITIGATION OF ORGANIZATIONAL CONFLICTS OF INTEREST H-11
H.8 DISCLOSURE OF ORGANIZATIONAL CONFLICTS OF INTEREST AFTER
CONTRACT AWARD H-12
H.9 UNIDENTIFIED DATA CONTAINING RESTRICTIVE OR LIMITING
MARKINGS H-12
H.10 IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA
AND RESTRICTED COMPUTER SOFTWARE (PRE-AWARD) H-13
H.11 IDENTIFICATION AND REPRESENTATION OF LIMITED RIGHTS DATA
AND RESTRICTED COMPUTER SOFTWARE (POST AWARD) H-15
H.12 RUSSIA SUBCONTRACTING WITH RUSSIAN ENTITIES FOR GOODS OR
SERVICES H-17
H.13 OPTION TO TRANSITION FROM AWARD FEE TO FIXED FEE H-19
H.14 OPTION TO TRANSITION FROM FIXED FEE TO AWARD FEE H-20
H.15 INCORRECT NOTICE AND REQUIREMENTS FOR WRITTEN
JUSTIFICATION OF RESTRICTED MARKINGS H-21
H.16 DATA CONTAINING AN INCORRECT NOTICE H-21
H.17 ACCESS TO CONTRACTOR DATA H-22
H.18 INFORMATION INCIDENTAL TO CONTRACT ADMINISTRATION H-23
H.19 HANDLING AND PROTECTION OF GOVERNMENT CONTROLLED
CONTRACTOR GENERATED DATA H-23
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE I-1
A-3
I.2 FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989) I-6
I.3 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (NOV 2021) I-6
I.4 FAR 52.216-18 ORDERING (AUG 2020) I-8
I.5 FAR 52.216-19 ORDER LIMITATIONS (OCT 1995) I-9
I.6 FAR 52.216-21 REQUIREMENTS (OCT 1995) I-9
I.7 FAR 52.216-22 (INDEFINITE QUANTITY OCT 1995) I-10
I.8 FAR 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) I-11
I.9 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL
HIRES (MAY 2014) I-12
I.10 FAR 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014) ALT II (DEC 2007)
AND ALT III (DEC 2007) AS MODIFIED BY NFS 1852.224-14 RIGHTS IN
DATA – GENERAL (APR 2015) I-13
I.11 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) I-21
I.12 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2022) I-21
I.13 TECHNICAL INFORMATION RELEASES AND PUBLICATIONS I-21
I.14 NFS 1852.204-75 SECURITY CLASSIFICATION REQUIREMENTS
(SEP 1989) I-22
I.15 NFS 1852.216-80 TASK ORDERING PROCEDURE (OCT 1996) I-22
I.16 NFS 1852.225-7171 RESTRICTION ON FUNDING ACTIVITY WITH CHINA
(FEB 2012) (DEVIATION) I-23
I.17 FAR 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS (DEC 2023) I-24
I.18 NFS 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED
INFORMATION TECHNOLOGY RESOURCES (DEVIATION 21-01B) I-28
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
TABLE OF CONTENTS J-1
ATTACHMENT J-1: DATA REQUIREMENTS LIST AND DATA REQUIREMENTS J-1-1
DESCRIPTIONS (DRDS)
ATTACHMENT J-2: KEY TERMS J-2-1
ATTACHMENT J-3: CONFIGURATION MANAGEMENT PLAN J-3-1
ATTACHMENT J-4: APPLICABLE DOCUMENT LIST J-4-1
ATTACHMENT J-5: STANDARD LABOR CATEGORIES J-5-1
ATTACHMENT J-6: EXPORT CONTROL PLAN J-6-1
ATTACHMENT J-7: MEETING SERVICES J-7-1
ATTACHMENT J-8: CONFERENCE FACILITIES MANAGEMENT J-8-1
ATTACHMENT J-9: ORGANIZATIONAL CONFLICT OF INTEREST (OCI) PLAN J-9-1
ATTACHMENT J-10: DATA AND RECORD MANAGEMENT PLAN J-10-1
ATTACHMENT J-11: AWARD FEE AND INCENTIVE FEE EVALUATION PLAN J-11-1
ATTACHMENT J-12: INSTALLATION ACCOUNTABLE GOVERNMENT
PROPERTY AND GOVERNMENT FURNISHED PROPERTY J-12-1
A-4
ATTACHMENT J-13: GOVERNMENT FURNISHED SOFTWARE, IT SYSTEMS,
and MODELS, CONTRACTOR HOSTED APPS and SUSTAINED APPS, and LICENSES J-13-1
ATTACHMENT J-14: SAFETY AND HEALTH PLAN J-14-1
ATTACHMENT J-15: CONTRACT MANAGEMENT PLAN J-15-1
ATTACHMENT J-16: CONTRACT PHASE-IN PLAN J-16-1
ATTACHMENT J-17: CONTRACT SECURITY CLASSIFICATION SPECIFICATION
(DD 254) J-17-1
ATTACHMENT J-18: DEPARTMENT OF LABOR WAGE DETERMINATION J-18-1
ATTACHMENT J-19 : MANAGED DOCUMENTS J-19-1
ATTACHMENT J-20 : FOREIGN TRAVEL PROCESS J-20-1
ATTACHMENT J-21 : RUSSIAN IT SERVICES J-21-1
ATTACHMENT J-22 : INFORMATION SYSTEM SECURITY PLAN J-22-1
ATTACHMENT J-23 : C-SCRM PLAN J-23-1
ATTACHMENT J-24 : IT PERFORMANCE AND CAPACITY MANAGEMENT PLAN J-24-1
ATTACHMENT J-25 : GOVERNMENT PROPERTY MANAGEMENT PLAN J-25-1
ATTACHMENT J-26 : AUTHORIZED LIMITED RIGHTS IN DATA AND
AND RESTRICTED COMPUTER SOFTWARE J-26-1
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS
K.1 PROVISIONS INCORPORATED BY REFERENCE K-1
K.2 FAR 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS
(JAN 2025) K-2
K.3 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT (NOV 2021) K-7
K.4 FAR 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS – REPRESENTATION AND DISCLOSURES (DEC 2023) K-9
K.5 FAR 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS K-11
K.6 FAR 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2020) K-12
K.7 FAR 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR
AGREEMENTS— CERTIFICATION (NOV 2021) K-13
K.8 FAR 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS
ALTERNATE I (FEB 2024) K-15
K.9 FAR 52.230-7 PROPOSAL DISCLOSURE-COST ACCOUNTING PRACTICE
CHANGES (APR 2005) K-20
K.10 RESTRICTION ON FUNDING ACTIVITY WITH CHINA-REPRESENTATION
(FEB 2012) (DEVIATION) K-20
A-5
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS
L.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998) L-1
L.2 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) L-2
L.3 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) L-2
L.4 NFS 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT
INFORMATION (JAN 2011) L-2
L.5 NFS 1852.245-81 LIST OF AVAILABLE GOVERNMENT PROPERTY
(JAN 2011) L-4
L.6 NFS 1852.215-77 PREPROPOSAL/PE-BID CONFERENECE (APR 2015) L-4
L.7 AVAILABILITY OF SPECIFICATIONS (JSC 52.215-123) (DEC 2019) L-5
L.8 COMMUNICATIONS REGARDING THIS SOLICITATION (JSC 52.215-124)
(MAR 2023) L-5
L.9 OFFEROR ACCEPTANCE PERIOD (JSC 52.215-125) (MAY 2023) L-6
L.10 PERIOD COVERED BY PROCUREMENT (JSC 52.215-126) (AUG 2018) L-6
L.11 MAXIFLEX TOUR OF DUTY (JSC’s PRIMARY WORK SCHEDULE)
(JSC 52.242-90) (NOV 2024) L-6
L.12 RESERVED L-7
L.13 SAFETY AND HEALTH PLAN L-7
L.14 SECURITY REQUIREMENTS AND INSTRUCTIONS TO OFFERORS L-7
L.15 RESERVED L-8
L.16 ELECTRONIC SUBMISSION OF PROPOSALS – PROPOSAL MARKING AND
DELIVERY THROUGH NASA’S EFSS BOX (NOV 2024) L-8
L.17 PROPOSAL ARRANGEMENT, PAGE LIMITATIONS, AND DUE DATES L-10
L.18 PROPOSAL FORMATTING INSTRUCTIONS (JSC 52.215-113) (NOV 2023) L-13
L.19 VOLUME I, MISSION SUITABILITY FACTOR L-15
L.19A MANAGEMENT APPROACH, MISSION SUITABILITY (SUB-FACTOR A) L-16
L.19B TECHNICAL APPROACH, MISSION SUITABILITY (SUB-FACTOR B) L-20
L.20 VOLUME II, PAST PERFORMANCE INFORMATION (JSC 52.215-114)
(NOV 2022) L-22
L.21 VOLUME III, COST AND PRICE FACTOR L-24
L-22 VOLUME IV, RESPONSIBILITY CONSIDERATIONS L-35
L-23 VOLUME V, MODEL CONTRACT L-42
L-24 NOTICE OF POTENTIAL ORGANIZATIONAL CONFLICTS OF INTEREST L-43
SECTION L ATTACHMENTS L-46
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE LISTING OF CLAUSES INCORPORATED BY REFERENCE
(FEB 1998) M-1
M.2 AWARD WITHOUT DISCUSSIONS M-1
M.3 SOURCE EVALUATION BOARD EVALUATION FACTORS FOR AWARD M-2
A-6
M.4 FACTOR 1, MISSION SUITABILITY FACTOR (VOLUME I) M-3
M.4A MANAGEMENT APPROACH, MISSION SUITABILITY (SUBFACTOR A) M-4
M.4B TECHNICAL APPROACH, MISSION SUITABILITY (SUBFACTOR B) M-5
M.5 FACTOR 2, PAST PERFORMANCE (VOLUME II) M-5
M.6 FACTOR 3, COST AND PRICE (VOLUME III) M-9
M.7 RESPONSIBILITY CONSIDERATIONS (VOLUME IV) M-10
M.8 MODEL CONTRACT (VOLUME V) M-14
80JSC025R7002 Section B
B-1
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 LISTING OF CLAUSES INCORPORATED BY REFERENCE
Clause(s) at the beginning of this Section are incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause.
The following contract clauses pertinent to this section are hereby incorporated by reference:
I. FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)
II. NASA FAR SUPPLEMENT (48 CFR CHAPTER 18) CLAUSES
CLAUSE
NUMBER
TITLE
DATE
None incorporated by reference
(End of Clauses Incorporated by Reference)
B.2 DESCRIPTION OF WORK AND CONTRACT TYPE
The Contractor shall provide all required services (except as may be expressly stated in this contract as furnished by the Government) necessary to successfully manage, deliver and/or perform, operate, maintain and provide all requirements in accordance with the Statement of Work (SOW) in Section C, as well as all Data Requirement Description (DRDs) provided in Section J, and all other requirements as specified throughout the contract.
In addition, the Contractor shall provide all resources and services (except as may be expressly stated in this contract as furnished by the Government) necessary to successfully perform all phase-in activities, in accordance with the Contract Phase-in Plan, Attachment J-16.
This is a Cost-Plus-Award-Fee (CPAF) & Cost-Plus-Incentive-Fee (CPIF) contract with Core and
CLAUSE
NUMBER
TITLE
DATE
None incorporated by reference
B-2
Indefinite-Delivery Indefinite-Quantity (IDIQ) requirements. The contract includes the option to convert from CPAF to Cost-Plus-Fixed-Fee (CPFF) and to transition CPFF back to CPAF at the discretion of the Government. The CPIF would remain independent of a change of CPAF to or from CPFF.
The phase-in efforts will be Firm Fixed Price (FFP)
(End of clause)
B.3 CONTRACT VALUE
The total Firm Fixed-Price of the phase-in is $[OFI]. The contract phase-in period is August 17, 2025, through September 30, 2025.
Through the Base period, the estimated cost of this contract is $[OFI]. The maximum available award fee is $[OFI]. The target incentive fee available is $[OFI]. Total estimated cost, maximum award fee, and target incentive fee is $[OFI].
The total contract value is as follows:
Table B-1: Base Period
FFP Estimated Cost
Maximum Award Fee Available
Award Fee Earned
Target Incentive Fee Available
Incentive Fee Earned
Total Contract Value
FFP Phase-In $[OFI] N/A N/A N/A N/A N/A $[OFI]
Cost Reimbursable - Baseline Effort
N/A $[OFI] $[OFI] TBD $[OFI] TBD $[OFI]
Cost Reimbursable -
IDIQ
N/A TBD TBD TBD TBD TBD TBD
Total Contract Value
$ $[OFI] $[OFI] TBD $[OFI] TBD $[OFI]
NOTE: The values in Table B-1 will be updated as Award Fee and Incentive Fee are earned, IDIQ is ordered, and with the exercise of options.
1 The baseline effort shall include closeout costs.
2Award Fee in this table is the total amount available for work in the contract baseline effort and any task orders that have been issued.
3The Award Fee will be determined in accordance with Attachment J-11, Award Fee and Incentive
B-3
Fee Evaluation Plan for the Mission Technical Integration Contract.
4Incentive Fee in this table is the target incentive fee available for the work in the contract baseline effort and any task orders that have been issued.
5The Incentive Fee will be determined in accordance with Attachment J-11, Award Fee and Incentive Fee Evaluation Plan for the Mission Technical Integration Contract.
6The Incentive Fee Earned is calculated on the Target Incentive Fee and the Incentive Fee shared (based on overrun/underrun) after each evaluation period. The incentive fee will be determined in accordance with Attachment J-11, Award Fee and Incentive Fee Evaluation Plan for the Mission Technical Integration Contract.
7Amounts for Estimated Cost, Award Fee, and Incentive Fee for cost reimbursable IDIQ task orders issued will be updated unilaterally as these IDIQ task orders are issued and amended, or at the end of each evaluation period.
Table B-2: Total Estimated Cost
B.4 IDIQ MINIMUM AND MAXIMUM ORDERING LIMITS (JSC 52.216-90) (NOV 2018)
In accordance with FAR 52.216-22, Indefinite Quantity, the contract guaranteed minimum amount* to be ordered under this contract is $10,000 and the contract Not to Exceed (NTE) amount* which may be ordered under this contract is $30,000,000. The Government is not obligated to order more than the minimum specified but may order up to the NTE amount. The Contractor is obligated to fulfill orders issued, up to the NTE amount within the limits specified in FAR 52.216-19, Order Limitations.
* These values are based on dollars.
(End of clause)
FFP Estimated Cost
Maximum Award Fee Available
Target Incentive
Fee
The Total Estimated Cost, Max AF, Target
IF
FFP Phase-In $[OFI] N/A N/A N/A $[OFI] Base Period:(CY1 and 2) N/A $[OFI] $[OFI] $[OFI] $[OFI] Option 1 (CY 3) N/A $[OFI] $[OFI] $[OFI] $[OFI] Option 2 (CY 4) N/A $[OFI] $[OFI] $[OFI] $[OFI] Option 3 (CY 5) N/A $[OFI] $[OFI] $[OFI] $[OFI] Option 4 (CY6) N/A $[OFI] $[OFI] $[OFI] $[OFI] Option to Extend (Ref. clause I.1) N/A $[OFI] $[OFI] $[OFI] $[OFI] The Total Estimated Cost, Max AF, Target IF
$[OFI] $[OFI] $[OFI] $[OFI]
B-4
B.5 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990)
For purposes of payment of cost and fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $[TBD]. This allotment is for Mission Technical Integration and covers the following estimated period of performance: October 1, 2025, through [TBD].
(b) An additional amount of $[TBD] is obligated under this contract for payment of the Firm-Fixed Price phase-in.
B.6 FULLY BURDENED RATE TABLE
This clause sets forth the rates to be utilized in the subsequent negotiation of IDIQ task orders in accordance with I.15, Task Ordering Procedure (NFS 1852.216-80).
Rates used for pricing of IDIQ task orders shall not exceed the negotiated labor, indirect, and fee/profit rates established in the Fully Burdened Rate Table shown below. The labor rates are fully burdened composite team rates (prime and subcontractors) including wages, fringe, overhead, and General and Administrative (G&A), but exclude fee. The Not-to Exceed (NTE) fee rate is the maximum rate which may be proposed or negotiated for individual Task Orders during contract performance.
The parties agree that the fully burdened labor rates established below shall not be subject to any equitable adjustment (upwards or downwards), regardless of actual rates incurred during contract performance.
Table B-3 Straight-Time Fully Burdened Rate per Hour Table (All labor rates are fully burdened exclusive of fee)
Straight-Time Hourly Rate (Burdened excluding Fee)
Standard Labor Categories
(SLC) *
Contract Year
(CY)1
10/1/25 - 9/30/26
CY2
10/1/26- 9/30/27
CY3
10/1/27- 9/30/28
CY4
10/1/28 - 9/30/29
CY5
10/1/29- 9/30/30
CY6
10/1/30 - 9/30/31
Option to Extend Services 10/01/2031- 04/30/2032
Program Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Deputy Program Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Supervisor $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Consultant $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer V $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI]
Straight-Time Hourly Rate (Burdened excluding Fee)
(SLC) *
Contract Year
(CY)1
10/1/25 - 9/30/26
CY2
10/1/26- 9/30/27
CY3
10/1/27- 9/30/28
CY4
10/1/28 - 9/30/29
CY5
10/1/29- 9/30/30
CY6
10/1/30 - 9/30/31
Option to Extend Services 10/01/2031- 04/30/2032
Business Specialist II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Analyst III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Analyst II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Analyst I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Support Specialist $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Clerk $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Secretary $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 1 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 2 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 3 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other (Non-Labor Indirect Rates)** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Offeror Indirect (s) *** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Maximum Award Fee % **** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Target Incentive Fee % **** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] %
Table B-4 Overtime Fully Burdened Rate per Hour Table (All labor rates are fully burdened exclusive of fee)
Overtime Hourly Rate (Burdened excluding Fee)
(SLC) *
Contract Year
(CY)1
10/1/25 - 9/30/26
CY2
10/1/26- 9/30/27
CY3
10/1/27- 9/30/28
CY4
10/1/28 - 9/30/29
CY5
10/1/29- 9/30/30
CY6
10/1/30 - 9/30/31
Option to Extend Services 10/01/2031- 04/30/2032
Program Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Deputy Program Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Manager $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Supervisor $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Consultant $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer V $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Engineer I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Technical Professional I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] IT Professional I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist IV $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Business Specialist I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Analyst III $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI]
Overtime Hourly Rate (Burdened excluding Fee)
(SLC) *
Contract Year
(CY)1
10/1/25 - 9/30/26
CY2
10/1/26- 9/30/27
CY3
10/1/27- 9/30/28
CY4
10/1/28 - 9/30/29
CY5
10/1/29- 9/30/30
CY6
10/1/30 - 9/30/31
Option to Extend Services 10/01/2031- 04/30/2032
Analyst II $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Analyst I $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Support Specialist $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Clerk $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Secretary $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 1 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 2 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other 3 – (Specify) $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] $[OFI] Other (Non-Labor Indirect Rates)** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Offeror Indirect (s) *** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Maximum Award Fee % **** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % Target Incentive Fee % **** [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] % [OFI] %
CY= Contract Year
* Straight-Time and Overtime Fully Burdened Labor Rates (FBLR) (e.g., Fringe, OH, G&A, etc.) exclusive of fee.
**Non-Labor Indirect Rate(s) to be applied to non-labor resources costs (e.g., material, other direct cost, & travel) per contract year and basis of application are currently inclusive of material burden and G&A.
***Offeror Indirect Rates(s) (if applicable) include additional indirect rate to be applied to direct cost in accordance with Offerors disclosed practices and/or accounting/estimating policies and procedures that are not already applied in FBLR or Non-Labor Resource Indirect Rate.
****Fee Rates will be applied to the total cost and price (labor, non-labor, & indirect rates) of future task orders, excluding travel.
(a) Non-Labor Resources (NLRs)
All non-labor costs that are proposed must be allowable, allocable, and reasonable, in accordance with the FAR, NASA FAR
Supplement, and any other applicable NASA procurement policy documents. The Contractor shall include back-up information with their estimate that provides rationale for their proposed cost/price estimates for materials and other non-labor costs.
(b) Travel
All travel shall be in accordance with the Federal Travel Regulation, and all costs for trips will be limited as follows:
(1) Travel costs incurred by Contractor personnel on official Government business are allowable, subject to the limitations stated in FAR 31.205-46, Travel Costs.
(2) Allowable airfare expenses are limited to the lowest priced airfare available to the contractor.
(3) Per diem paid on travel days are ¾ per diem; regardless of the time actually spent in travel.
Travel costs will be reimbursed at the actual cost, and no fee or profit shall be applied to travel costs. Travel costs will be allocated to the contract based on actual airfare and per diem rates per the most current official Continental United States (CONUS) or Outside (OCONUS) Per Diem Rates, located at http://www.gsa.gov/portal/category/21287. All international travel shall be approved by the Contracting Officer prior to departure.
All requests for international travel shall include the purpose and the rationale, such as why the purpose cannot be accomplished through a means other than travel (i.e., teleconferencing).
[END OF SECTION]
http://www.gsa.gov/portal/category/21287
80JSC025R7002 Section C
C-1
SECTION C STATEMENT OF WORK
(SOW)
C-2
TABLE OF CONTENTS
1.0 MANAGEMENT INTEGRATION AND CONTROL ............................................... C-7
1.1 PROGRAM MANAGEMENT AND ADMINISTRATION ........................................... C-7
1.2 BUSINESS MANAGEMENT AND ADMINISTRATION .......................................... C-13
1.3 CONFIGURATION MANAGEMENT (CM) ................................................................ C-14
1.4 INFORMATION TECHNOLOGY (IT) ......................................................................... C-14
1.5 SYSTEM ENGINEERING AND INTEGRATION (SE&I) .......................................... C-16
1.6 MISSION PLANNING AND INTEGRATION ............................................................. C-16
1.7 OPERATIONS ................................................................................................................ C-16
1.8 SAFETY AND MISSION ASSURANCE ..................................................................... C-16
1.9 PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION ...................................................................................................... C-16
2.0 INTERNATIONAL SPACE STATION PROGRAM (ISSP) .................................. C-17
2.1 ISS PROGRAM MANAGEMENT AND ADMINISTRATION ................................... C-17
2.2 ISS PROGRAM BUSINESS MANAGEMENT AND ADMINISTRATION ............... C-22
2.3 ISS PROGRAM CONFIGURATION MANAGEMENT (CM) .................................... C-26
2.4 ISS PROGRAM INFORMATION TECHNOLOGY (IT) ............................................. C-28
2.5 ISS PROGRAM SYSTEMS ENGINEERING AND INTEGRATION (SE&I) ............ C-46
2.6 ISS PROGRAM MISSION PLANNING AND INTEGRATION ................................. C-59
2.7 ISS PROGRAM OPERATIONS .................................................................................... C-60
2.8 ISS PROGRAM SAFETY AND MISSION ASSURANCE (S&MA) .......................... C-62
2.9 ISS PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION ...................................................................................................... C-65
3.0 GATEWAY PROGRAM ............................................................................................. C-72
3.1 GATEWAY PROGRAM MANAGEMENT AND ADMINISTRATION .................... C-72
3.2 GATEWAY PROGRAM BUSINESS MANAGEMENT AND ADMINISTRATION C-77
3.3 GATEWAY PROGRAM CONFIGURATION MANAGEMENT (CM)/DATA
MANAGEMENT AND INTEGRATION (DMI) AND CHANGE CONTROL ........... C-79
3.4 GATEWAY PROGRAM INFORMATION TECHNOLOGY (IT) ............................... C-80
3.5 GATEWAY PROGRAM SE&I/VSI .............................................................................. C-83
3.6 GATEWAY PROGRAM MISSION PLANNING AND INTEGRATION ................... C-90
3.7 GATEWAY PROGRAM OPERATIONS ...................................................................... C-92
3.8 GATEWAY PROGRAM S&MA ................................................................................... C-93
3.9 GATEWAY PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION ...................................................................................................... C-93
C-3
4.0 ORION .......................................................................................................................... C-94
4.1 ORION PROGRAM MANAGEMENT AND ADMINISTRATION ............................ C-94
4.2 ORION BUSINESS MANAGEMENT AND ADMINISTRATION ............................. C-94
4.3 ORION CONFIGURATION MANAGEMENT/DATA MANAGEMENT .................. C-94
4.4 ORION INFORMATION TECHNOLOGY .................................................................. C-96
4.5 ORION PROGRAM SE&I ............................................................................................. C-98
4.6 ORION MISSION PLANNING AND INTEGRATION ............................................. C-102
4.7 ORION OPERATIONS ................................................................................................ C-102
4.8 ORION S&MA ............................................................................................................. C-102
4.9 ORION PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-103
5.0 EVA AND HUMAN SURFACE MOBILITY (EHP) .............................................. C-104
5.1 EHP PROGRAM MANAGEMENT AND ADMINISTRATION ............................... C-104
5.2 BUSINESS MANAGEMENT AND ADMINISTRATION ........................................ C-105
5.3 EHP PROGRAM CONFIGURATION MANAGEMENT .......................................... C-106
5.4 EHP PROGRAM INFORMATION TECHNOLOGY ................................................. C-106
5.5 EHP SYSTEM ENGINEERING AND INTEGRATION ............................................ C-107
5.6 EHP PROGRAM MISSION PLANNING AND INTEGRATION.............................. C-110
5.7 EHP PROGRAM OPERATIONS ................................................................................ C-110
5.8 EHP PROGRAM SAFETY AND MISSION ASSURANCE (S&MA) ....................... C-110
5.9 EHP PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-110
6.0 COMMERCIAL LOW EARTH ORBIT (LEO) DEVELOPMENT PROGRAM
(CLDP) ........................................................................................................................ C-111
6.1 CLDP PROGRAM MANAGEMENT AND ADMINISTRATION ............................ C-111
6.2 COMM LEO BUSINESS MANAGEMENT AND ADMINISTRATION .................. C-112
6.3 COMM LEO PROGRAM CONFIGURATION MANAGEMENT (CM)/DATA
MANAGEMENT AND INTEGRATION (DMI) AND CHANGE CONTROL ......... C-114
6.4 COMMERCIAL LEO INFORMATION TECHNOLOGY (IT) .................................. C-115
6.5 COMM LEO PROGRAM SYSTEMS ENGINEERING AND INTEGRATION ..... C- 118
6.6 COMMERCIAL LEO MISSION PLANNING AND INTEGRATION ...................... C-119
6.7 COMM LEO PROGRAM OPERATIONS .................................................................. C-120
6.8 COMM LEO S&MA .................................................................................................... C-120
6.9 COMM LEO PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-120
7.0 COMMERCIAL CREW PROGRAM (CCP) ......................................................... C-122
C-4
7.1 CCP MANAGEMENT AND ADMINISTRATION .................................................... C-122
7.2 CCP BUSINESS MANAGEMENT AND ADMINISTRATION ................................ C-122
7.3 CCP CM ........................................................................................................................ C-122
7.4 CCP IT .......................................................................................................................... C-122
7.5 CCP SE&I ..................................................................................................................... C-122
7.6 CCP MISSION PLANNING AND INTEGRATION .................................................. C-123
7.7 CCP OPERATIONS ..................................................................................................... C-123
7.8 CCP S&MA .................................................................................................................. C-123
7.9 CCP PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-123
8.0 EXPLORATION ARCHITECTURE, INTEGRATION, AND SCIENCE
DIRECTORATE (EAIS) ........................................................................................... C-124
8.1 EAIS PROGRAM MANAGEMENT AND ADMINISTRATION .............................. C-124
8.2 EAIS PROGRAM BUSINESS MANAGEMENT AND ADMINISTRATION .......... C-124
8.3 EAIS PROGRAM CONFIGURATION MANAGEMENT ......................................... C-124
8.4 EAIS PROGRAM INFORMATION TECHNOLOGY (IT) ........................................ C-124
8.5 EAIS PROGRAM SE&I ............................................................................................... C-125
8.6 EAIS PROGRAM MISSION PLANNING AND INTEGRATION ............................ C-125
8.7 EAIS PROGRAM OPERATIONS ............................................................................... C-125
8.8 EAIS PROGRAM S&MA ............................................................................................ C-125
8.9 EAIS PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-125
9.0 MOON TO MARS (M2M) PROGRAM .................................................................. C-127
9.1 M2M PROGRAM MANAGEMENT AND ADMINISTRATION ............................. C-127
9.2 M2M PROGRAM BUSINESS MANAGEMENT AND ADMINISTRATION.......... C-128
9.3 M2M PROGRAM CONFIGURATION MANAGEMENT ......................................... C-128
9.4 M2M PROGRAM INFORMATION TECHNOLOGY (IT) ........................................ C-128
9.5 M2M PROGRAM SYSTEMS SE&I............................................................................ C-129
9.6 M2M PROGRAM MISSION PLANNING AND INTEGRATION ............................ C-129
9.7 M2M PROGRAM OPERATIONS ............................................................................... C-129
9.8 M2M PROGRAM SAFETY AND MISSION ASSURANCE (S&MA) ..................... C-129
9.9 M2M PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-130
10.0 HUMAN LANDING SYSTEM (HLS) PROGRAM ............................................... C-131
10.1 HLS PROGRAM MANAGEMENT AND ADMINISTRATION ............................... C-131
C-5
10.2 HLS PROGRAM BUSINESS MANAGEMENT AND ADMINISTRATION ........... C-131
10.3 HLS PROGRAM CONFIGURATION MANAGEMENT .......................................... C-131
10.4 HLS PROGRAM INFORMATION TECHNOLOGY ................................................. C-131
10.5 HLS PROGRAM SYSTEMS ENGINEERING AND INTEGRATION (SE&I)......... C-132
10.6 HLS PROGRAM MISSION PLANNING AND INTEGRATION.............................. C-132
10.7 HLS OPERATIONS ..................................................................................................... C-132
10.8 HLS SAFETY AND MISSION ASSURANCE ........................................................... C-132
10.9 HLS PROGRAM RESEARCH AND COMMUNICATION/STRATEGIC
COLLABORATION .................................................................................................... C-132
C-6
I. INTRODUCTION
The Mission Technical Integration Contract (MTIC) supports the National Aeronautics and Space Administration (NASA) International Space Station Program (ISSP), Orion Program, the Gateway Program, and future Exploration and Commercial efforts by providing products and services to support mission and program technical integration activities and necessary infrastructure functions.
Tasks support the following:
• Program Management and Administration
• Business Management and Administration
• Configuration Management
• Information Technology
• Systems Engineering and Integration
• Mission Planning and Integration
• Operations
• Safety and Mission Assurance
• Program Research and Communication/Strategic Collaboration
The following Statement of Work (SOW) defines tasks to be performed by the contractor. The contractor shall be responsible for the overall successful performance of the contract and provide all necessary resources to meet contract requirements. The contractor shall be responsible for all training and certifications required to accomplish contract requirements. All work completed under this contract shall comply with contract requirements. The contractor shall not perform any Inherently Government Functions as defined by Federal Acquisition Regulations [FAR]) Subpart 7.5, Inherently Governmental Functions.
The SOW is organized as follows:
SOW Sections 1.0 through 10.0 are "core" tasks required on a day-to-day basis, generally throughout the contract Period of Performance (PoP) to support the NASA Programs.
o SOW 1.0, Management Integration and Control, requirements are applicable to all products and services provided under this contract.
o SOW 2.0 - SOW 10.0 requirements are applicable to a specific NASA Program and shall be implemented as such.
Contract changes to the core work baseline (SOW 1.0 through 10.0) lasting the entire PoP will be implemented via the Changes Clause (FAR 52.243-2, Changes - Cost Reimbursement) Discrete tasks will be implemented as Indefinite Delivery/Indefinite Quantity (IDIQ) Task Orders (TOs). TOs will be authorized per clauses JSC 52.216-90, IDIQ Minimum and Maximum Ordering Limits and NASA FAR Supplement (NFS) 1852.216-80, Task Ordering Procedure.
All contract modifications and IDIQ TOs require Contracting Officer (CO) authorization.
C-7
II. SCOPE OF WORK (SOW)
1.0 MANAGEMENT INTEGRATION AND CONTROL
All requirements stated in SOW 1.0, Management Integration and Control, are applicable across all Programs covered in this SOW (Sections 2 - 10), unless otherwise stated. All requirements stated in the entire SOW (Sections 1 - 10) are applicable to all phases of a Program, including conception, development, operations, end-of-life transition planning, and Program cancellation.
Any additional requirements or exceptions to these requirements are specified in the program specific SOW sections.
The Applicable Document List (ADL) for work performed under this contract is per Contract Attachment J-4, Applicable Document List.
Key terms and definitions associated with this SOW are found in Contract Attachment J-2, Key Terms.
Data deliverables required by the contract are found in Contract Attachment J-1, Data Requirements List and Data Requirement Descriptions.
1.1 PROGRAM MANAGEMENT AND ADMINISTRATION
The contractor shall provide overall program management and administration for this contract to ensure quality products are delivered per schedule, issues are dealt with in a timely and cost-effective manner, and contract functions are integrated (as applicable) across the contract for consistent and efficient operation.
The contractor shall provide and maintain program management systems, as outlined below, for the planning, organization, control, and reporting of all activities required by this contract. The contractor shall develop and maintain a Program Management Plan per Data Requirement Document (DRD) MTIC-PM-01, Contract Management Plan.
The contractor shall perform the following program management and administration tasks:
1.1.1 Workforce Management
The contractor shall provide a qualified contractor workforce to implement the scope of this contract. The contractor shall:
• Provide fully trained, qualified, and certified (as required) contractor personnel in sufficient numbers to manage, supervise, and perform the work under this contract per required NASA Program schedules,
• Ensure no mission impacts due to position vacancies or personnel qualifications,
• Preclude staffing that may introduce single point failures,
• Support surge demands in staffing or workloads dictated by Program priorities and demands.
1.1.2 Integrated Management Reviews
The contractor shall conduct Integrated Management Reviews (IMRs) for NASA and provide review products in accordance with DRD MTIC-PM-02, Integrated Management Review. The
C-8 reviews shall provide NASA Program insight into the contractor’s, subcontractors’, and vendors’ overall technical, schedule and cost performance.
1.1.3 Work Plans
The contractor shall develop and maintain work plans per DRD MTIC-PM-03, Annual Work Plans.
1.1.4 Audit and Surveillance
The contractor shall provide access to data, personnel, and facilities for Government audits and surveillance of contractor plans, procedures, and processes when deemed necessary by the Government, and provide written responses to audit and surveillance findings.
1.1.5 Quality Management
The contractor shall establish, implement, and maintain a Quality Management System (QMS) that complies with the Society of Automotive Engineers Aerospace Standard 9100 (SAE AS9100), Quality Management Systems – Requirements for Aviation, Space, and Defense Organizations, or American National Standards Institute/International Organization for Standardization/American Society for Quality (ANSI/ISO/ASQ) Q9001:2015, QMS - Requirements (reference FAR Clause 52.246-11, Higher-Level Contract Quality Requirement). Third party certification and registration are not required.
If the contractor is SAE AS9100 registered and subsequently changes registrars, loses registration status, or is put on notice of losing registration status, the contractor shall notify the NASA CO within three (3) business days of receiving such notice.
1.1.6 Records Management
The contractor shall electronically maintain accurate and complete records (including legacy, electronic, paper, and vital records) and administer the disposition of these records and non-records in accordance with NASA Procedural Requirements (NPR) 1441.1, NASA Records Management Program Requirements, and NASA Records Retention Schedule (NRRS) 1441, NASA Records Retention Schedules, which has been approved by NASA and the National Archives and Records Administration (NARA).
The contractor shall segregate NASA records from company-owned records and from non-record materials and shall provide NASA or authorized representatives’ access to all Government records in accordance with FAR Subpart 4.7, Contractor Records Retention. The Government reserves the right to inspect, audit, and copy record holdings.
At the completion or termination of this contract, the contractor shall leave all Government-owned data with the appropriate Government entity.
A. The contractor shall ensure that Government-owned data is in a format that is accessible, readable, and usable by the Government.
B. The contractor shall deliver Government-owned records to the appropriate Center records manager for dissemination to the Offices of Primary Responsibility (OPRs).
C. The contractor shall deliver records to the Center Records Manager in accordance with NPR 1441.1 at the completion or termination of this contract or as record retention
C-9 schedule expires. When in doubt of the ownership of…