Attachment J-19 Managed Documents Amendment 2.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- Mission Technical Integration Contract (MTIC) Federal contract opportunity
- Solicitation number
- 80JSC025R7002
About this file
This is Attachment J-19 Managed Documents, which provides a comprehensive list of controlled documents that are relevant to the Mission Technical Integration Contract (MTIC). The attachment contains over 140 documents organized by program/organization owner, including documents from the Commercial Low Earth Orbit Development Program (CLDP), Gateway Program, International Space Station (ISS), and Orion Multi-Purpose Crew Vehicle Program.
The document listing includes program plans, interface control documents, requirements documents, certification of flight readiness plans, and technical specifications spanning from 1999 to 2024. Key focus areas include systems engineering, safety requirements, configuration management, mission integration, visiting vehicle requirements, and program implementation plans. Major document categories cover ISS operations, Gateway interfaces, crew safety, technical integration, and mission planning across NASA's human spaceflight programs. This appears to be a master reference list of technical documents that the MTIC contractor will need to manage and maintain as part of their scope of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MTIC Request For Proposal 80JSC025R7002 - Amendment 2.pdf | ||
| L-6A MTIC Cost Price Template Amendment 2.xlsx | XLSX spreadsheet | |
| L-5 Technical Resources Template Amendment 2.xlsx | XLSX spreadsheet | |
| L-7 MTIC TCP Rate Build-Up Form Amendment 2.xlsx | XLSX spreadsheet | |
| MTIC Request For Proposal Questions and Answers.pdf | ||
| MTIC Request For Proposal 80JSC025R7002 - Amendment 1.pdf | ||
| MTIC Pre-Proposal Conference Presentation.pdf | ||
| MTIC Request For Proposal - 80JSC025R7002.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| 80JSC025R7002 Section J |
| Attachment J-19 |
| MISSION TECHNICAL INTEGRATION CONTRACT |
| Mission Technical Integration Contract |
Attachment J-19
Managed Documents
Documents
| ATTACHMENT J-19 MANAGED DOCUMENTS | |||
| Organization Owner | Document Number | Document Title | Last Update/Revision |
(YEAR)
| CLDP | CLDP-P-4010 | Commercial Low Earth Orbit Development Program | ||
| (CLDP) Change Management Process | 2023 | |||
| EHP | EVA Development Project ILSP Book | |||
| EHP | EHP Cybersecurity Implementation Plan | |||
| EHP | EHP IT Standard Operating Procedures | |||
| Gateway/MP | GP-10041 | Gateway Program Plan | 2024 | |
| Gateway/MP | TERMS OF REFERENCE FOR THE INDEPENDENT LIFE CYCLE REVIEWS OF THE GATEWAY PROGRAM | 2024 | ||
| Gateway/MA | GP-10110 | Gateway Program Implementation Plan | 2022 | |
| Gateway/MI | GP-10226 | Gateway SE&I CoFR Implementation Plan | ||
| 2024 | ||||
| Gateway/MI | GP-10027 | Gateway Concept of Operations | 2024 | |
| Gateway/MI | GP-10042 | Gateway Reference Coordinate Systems | 2024 | |
| Gateway/MI | SEI-DM-ANA-0054 | Gateway Functional Architecture Model | 2024 | |
| Gateway/MI | SEI-DM-ADD-001 | Gateway Architecture Definition Document | 2024 | |
| Gateway/MO | GP-10112 | Gateway Program Certification of Flight Readiness (CoFR) Process | 2023 | |
| Gateway/MO | TBD | CoFR Implementation Plans for the MI&U Office | TBD | |
| Gateway/MV | To be Developed | CoFR Implementation Plans for the VSI Office | ||
| Gateway/MV | GP-10031 | Gateway to Visiting Vehicle Interface Requirements Document | 2023 | |
| Gateway/MV | GP-10031-01 | Gateway to Visiting Vehicle Interface Requirements Document Annex 01: Human Lander Systems (HLS) Requirements | 2022 | |
| Gateway/MV | GP-10031-02 | Gateway to Visiting Vehicle Interface Requirements Document Annex 2: Orion Requirements | 2022 | |
| Gateway/MV | GP-10032 | Gateway Intermodule Interface Requirements Document (IRD) | 2024 | |
| Gateway/MV | GP-10034 | Habitation and Logistics Outpost (HALO) to International Habitat (I-Hab) Interface Control Document | Draft | |
| Gateway/MV | GP-10048 | Gateway Program Systems Engineering Management Plan | 2023 | |
| Gateway/MV | GP-10061 | Gateway to Orion Hardware Interface Control Document (ICD) | 2024 | |
| Gateway/MV | GP-10188 | Habitation and Logistics Outpost (HALO) to European System Providing Refueling, Infrastructure and Telecommunications (ESPRIT) Refueling Module (RM) Interface Control Document (ICD) | Draft | |
| Gateway/MV | GP-10189 | International Habitat (I-HAB) to Airlock Module (ALM) Interface Control Document (ALM) | Draft | |
| Gateway/MV | GP-10237 | Gateway to Starship Hardware Interface Control Document | Draft | |
| ISS/OB | IDSS IDD | International Docking System Standard (IDSS) Interface Definition Document (IDD) | 2018 | |
| ISS/OB | SSP 50397 | Node 3 to Waste and Hygiene ComPARTment Interface Control Document | 2008 | |
| ISS/OB | SSP 50314 | Water Recovery System Rack #2 to Node 3 Interface Control Document | 2011 | |
| ISS/OB | SSP 50315 | Water Recovery System Rack #1 to Node 3 Interface Control Document | 2011 | |
| ISS/OB | SSP 50316 | Oxygen Generation System Rack to Node 3 Interface Control Document | 2011 | |
| ISS/OB | SSP 50318 | Prime Item Development Specification for Node 3 | 2016 | |
| ISS/OB | SSP 50322 | ISS Vehicle Office Certification of Flight Readiness Implementation Plan | 2022 | |
| ISS/OB | SSP 50333 | Cupola Segment Specification | 2015 | |
| ISS/OB | SSP 50357 | Node 2 to Crew Quarters Interface Control Document | 2009 | |
| ISS/OB | SSP 51088 | International Space Station (ISS) to Axiom Commercial Segment (AxCS) Hardware ICD (AxCS ICD) | ||
| ISS/OB | SSP 51089 | NASA/Axiom Commercial Segment Joint Integration, Verification and Test Plan | 2024 | |
| ISS/OB | SSP 50578 | International Space Station Cargo Certification Process | 2018 | |
| ISS/OB | SSP 50781 | Project Technical Requirements Specification for the ISS Crew Quarters | 2012 | |
| ISS/OB | SSP 50869 | Prime Item Development Specification for the Permanent Multipurpose Module (PMM) | 2010 | |
| ISS/OB | SSP 50872 | Multilateral Cargo Interface Certification Process for International Space Station | 2012 | |
| ISS/OB | SSP 50875 | Oxygen Generation System Rack to Rack Components Interface Control Document | 2009 | |
| ISS/OB | SSP 51074 | Commercial Element Requirements Document (CERD) | 2021 | |
| ISS/OB | SSP 51087 | Private Astronaut Mission (PAM) Authorization, Coordination and Execution (PACE) Document | 2021 | |
| ISS/OB | SSP 51087-ANX1 | Private Astronaut Mission (PAM) Authorization, Coordination and Execution (PACE) Annex 1: ISS Process & Requirements Compliance (Generic) | 2022 | |
| ISS/OB | SSP 51087-ANX2 | Private Astronaut Mission (PAM) Authorization, Coordination, and Execution (PACE) Annex 2: Data Requirement Deliverables (DRDs) for PAMs | 2022 | |
| ISS/OB | SSP 51092 | Private Astronaut Resources, Interfaces, and Services (PARIS) for ISS | 2020 | |
| ISS/OC | IMCOH | ISS Management Center Operations Handbook | ||
| ISS/OC | SSP 30575 | Space Station Interior and Exterior Operational Location Coding System | 2014 | |
| ISS/OC | SSP 50108 | ISS Program Certification of Flight Readiness Process Document | 2022 | |
| ISS/OC | SSP 50200-02 | Station Program Implementation Plan, Volume 2: Program Planning and Manifesting | 2015 | |
| ISS/OC | SSP 50230 | Mission Integration and Operations Office Certification of Flight Readiness Implementation Plan | 2019 | |
| ISS/OC | SSP 50650 | Program Management Operations Integration Procedures | 2021 | |
| ISS/OC | SSP 50260 | International Space Station Medical Operations Requirements Document (ISS MORD) | ||
| ISS/OC | SSP 50261 01 | Generic Groundrules, Requirements, and Constraints PART 1: Strategic and Tactical Planning | ||
| ISS/OC | SSP 50477 | Joint Crew Provisioning Catalog | 2016 | |
| ISS/OC | SSP 50489 | ISS Mission Integration Template | 2022 | |
| ISS/OC | SSP 50502 | International Space Station Hardware Preflight Imagery Requirements | 2015 | |
| ISS/OC | SSP 50746 | United States On-Orbit Stowage Allocation Requirements | 2008 | |
| ISS/OC | SSP 540XX 540YY | Increment Definition and Requirements Document for Increments XX YY | ||
| ISS/OC | SSP 54100 | Multi Increment Planning Document | ||
| ISS/OC | SSP 543XX 543YY | Post Increment Evaluation Report, Increments XX and YY | ||
| ISS/OD | SSP 50200 01 ANX D | Station Program Implementation Plan (SPIP) Volume 1: Station Program Management Plan Annex D: Avionics & Software Office Plan | 2018 | |
| ISS/OD | SSP 50484 | Avionics and Software Office Certification of Flight Readiness (CoFR) Implementation Plan | 2019 | |
| ISS/OE | ISS IVA 0202 | Intravehicular Activity (IVA) Crewmember Injury and Hardware Damage from Impact/Collision Hazard Report | 2016 | |
| ISS/OE | ISS STO 0801 | Injury of Crew or Damage to ISS During Transfer and Stowage of Loose Hardware | 1999 | |
| ISS/OE | SSP 50190 | Contingency Action Plan | 2015 | |
| ISS/OE | SSP 50190 CRS | Contingency Action Plan, Annex A: Commercial Resupply Service | 2017 | |
| ISS/OE | SSP 50231 | ISS Safety and Mission Assurance/Program Risk Certification of Flight Readiness Implementation Plan | 2021 | |
| ISS/OE | SSP 51721 | ISS Safety Requirements Document | 2021 | |
| ISS/OH | OH WI 002 | Work Instruction To Develop and Control ISS Forms For Configuration Management (CM) and Data Management (DM) | 2019 | |
| ISS/OH | SSP 41170 | Configuration Management Requirements | 2020 | |
| ISS/OH | SSP 50010 | Standards for ISS Program Documentation | 2020 | |
| ISS/OH | SSP 50013 | Information Systems Plan | 2019 | |
| ISS/OH | SSP 50013 ANXA | Information Systems Plan Annex A: SharePoint Governance | 2019 | |
| ISS/OH | SSP 50123 | Configuration Management Handbook | 2018 | |
| ISS/OH | SSP 50123 ASI | Configuration Management Handbook, Agenzia Spaziale Italiana Annex | 2018 | |
| ISS/OH | SSP 50123 CSA | Configuration Management Handbook, Canadian Space Agency Annex | 2018 | |
| ISS/OH | SSP 50123 ESA | Configuration Management Handbook, European Space Agency Annex | 2019 | |
| ISS/OH | SSP 50123 JAXA | Configuration Management Handbook, Japan Aerospace Exploration Agency Annex | 2019 | |
| ISS/OH | SSP 50123 ROSCOSMOS | Configuration Management Handbook Federal Space Agency Annex | 2007 | |
| ISS/OH | SSP 50222 | Information Technology Capital Investment Process | 2006 | |
| ISS/OH | SSP 50421 | Program Planning and Control Office Certification of Flight Readiness (CoFR) Implementation Plan | 2019 | |
| ISS/OH | SSP 50744 | Data Impoundment and Processing Procedures | 2012 | |
| ISS/OH4 | SSP 50174 | Mission Integration Database APPlications System To Vehicle Master Database Interface Control Document | 2003 | |
| ISS/OH4 | SSP 50647 | Mission Integration Database APPlications System to Cargo Local Database Interface Control Document | 2010 | |
| ISS/OH4 | SSP 50725 | Mission Integration Database APPlications System/Property Operations Workflow Enhancement Real-Time (MIDAS/POWER) Interface Control Document | 2009 | |
| ISS/OH4 | SSP 50938 | Mission Integration Database APPlications System Master Interface Control Document | 2012 | |
| ISS/OH4 | SSP 50938 ANX A | Mission Integration Database APPlications System Interface Control Document Annex A: ISS Manifest Assessment Tool | 2012 | |
| ISS/OM | JSC 26557 Vol 1 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 1 | ||
| ISS/OM | JSC 26557 Vol 2 | On-Orbit Assembly Modeling and Mass Properties Data Book Volume 2 | ||
| ISS/OM | OM WI 02 | VIPER Interface Document Volume 1: Altitude and Propellant | 2019 | |
| ISS/OM | SSP 30219 | Space Station Reference Coordinate Systems | 2022 | |
| ISS/OM | SSP 41000 | System Specification for the International Space Station | 2020 | |
| ISS/OM | SSP 41002 | International Standard Payload Rack to NASA/ESA/JAXA Modules Interface Control Document | 2017 | |
| ISS/OM | SSP 41140 PART 1 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, PART 1 | 2013 | |
| ISS/OM | SSP 41140 PART 2 | Space Station Program Node Element 1 to Node element 3 Interface Control Document, PART 2 | 2010 | |
| ISS/OM | SSP 41142 PART 1 | Space Station Program Node elements to Cupola Element Interface Control Document, PART 1 | 2010 | |
| ISS/OM | SSP 41142 PART 2 | Space Station Program Node elements to Cupola Element Interface Control Document, PART 2 | 2010 | |
| ISS/OM | SSP 41150 | Interface Requirements Document United Station On-Orbit (USOS) to Columbus Attached Pressurized Module (APM) | 2015 | |
| ISS/OM | SSP 41151 | Interface Requirements Document United States On-Orbit Segment to Japanese Experiment Module | 2016 | |
| ISS/OM | SSP 41151 APP D | United States On-orbit Segment to Japanese Experiment Module Interface Requirements Document Appendix D Software Interfaces | 2016 | |
| ISS/OM | SSP 41152 | Interface Requirements Document International Standard Payload Rack (ISPR) | 2011 | |
| ISS/OM | SSP 41160 | European Space Agency Segment Specification for Columbus | 2016 | |
| ISS/OM | SSP 41163 | Russian Segment Specification | 2019 | |
| ISS/OM | SSP 41165 | Segment Specification for the Japanese Experiment Module | 2019 | |
| ISS/OM | SSP 41167 | Mobile Servicing System Segment Specification for the International Space Station Program | 2016 | |
| ISS/OM | SSP 42000 | United States On-orbit Segment to Japanese Experiment Module Interface Control Document | 2017 | |
| ISS/OM | SSP 42001 | United States On-orbit Segment to Columbus Attached Pressurized Module Interface Control Document | 2016 | |
| ISS/OM | SSP 42003 PART 1 | United States On-orbit Segment (USOS) to Mobile Servicing System (MSS) Interface Control Document PART 1 | 2017 | |
| ISS/OM | SSP 42003 PART 2 | Space Station Manned Base to Mobile Servicing System Interface Control Document PART 2 | 2009 | |
| ISS/OM | SSP 42004 PART 1 | Mobile Servicing System (MSS) to User (Generic) Interface Control Document PART 1 | 2018 | |
| ISS/OM | SSP 42004 PART 2 | Mobile Servicing System to User (Generic) Interface Control Document PART 2 | 2003 | |
| ISS/OM | SSP 42007 PART 1 | United States On Orbit Segment to Italian Mini Pressurized Logistics Module Interface Control Document PART 1 | 2018 | |
| ISS/OM | SSP 42007 PART 2 | United States On Orbit Segment to Permanent Multi Purpose Module Interface Control Document PART 2 | 2019 | |
| ISS/OM | SSP 42097 PART 1, APP E | Space Station Program Pressurized Mating Adapter 2 & 3 to United States Pressurized Elements (Node Element 3 to Pressurized Mating Adapter | 2011 | |
| ISS/OM | SSP 42097 PART 2, APP. E | Space Station Program Pressurized Mating Adapter 2 & 3 to U.S. Pressurized Elements (Node 3 to PMA 3) Interface Control Document, PART 2, | 2011 | |
| ISS/OM | SSP 42121 PART 1 | U.S. On Orbit Segment Pressurized Mating Adapter 1 to Russian Segment FGB Interface Control Document PART 1 | 2016 | |
| ISS/OM | SSP 42121 PART 2 | U.S. On Orbit Segment Pressurized Mating Adapter 1 to Russian Segment FGB Interface Control Document PART 2 | 1999 | |
| ISS/OM | SSP 42137 PART 1 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, PART 1 | 2010 | |
| ISS/OM | SSP 42137 PART 2 | Space Station Program Integrated Truss Segment S0 to Node 3 Interface Control Document, PART 2 | 2010 | |
| ISS/OM | SSP 50094 | NASA/RSA Joint Specifications Standards Document for the ISS Russian Segment | 2017 | |
| ISS/OM | SSP 50098 PART 1 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document PART 1 | 2006 | |
| ISS/OM | SSP 50098 PART 2 | Robotic Workstation to Space Station Manned Base (SSMB) Interface Control Document PART 2 | 2002 | |
| ISS/OM | SSP 50128 | Specification of Technical Requirements for the FGB, Functional Cargo Block | 2009 | |
| ISS/OM | SSP 50135 | International Space Station Interface Control Plan - NASA/RSA | 1999 | |
| ISS/OM | SSP 50200 01 ANX M | Station Program Implementation Plan Volume 1: Station Program Management Plan, Annex M: Systems Engineering & Integration Office Plan | 2017 | |
| ISS/OM | SSP 50227 | Russian Segment to PDGF/PVGF/SSRMS Interface Control Document | 2016 | |
| ISS/OM | SSP 50310 | Atmosphere Revitalization Subsystem Rack to Node 3 Interface Control Document | 2015 | |
| ISS/OM | SSP 50309 PART 1 | Space Station Program Node 3 to Habitation Module Interface Control Document, PART 1 | 2000 | |
| ISS/OM | SSP 50309 PART 2 | Space Station Program Node 3 Element to Habitation Module Element Interface Control Document, PART 2 | 2001 | |
| ISS/OM | SSP 50344 | System Engineering and Integration Office Certificate of Flight Readiness Implementation Plan | 2019 | |
| ISS/OM | SSP 50699 03 | ISS Certification Baseline Volume 3: Flight Attitudes | 2014 | |
| ISS/OM | SSP 50754 | Crew Monitoring Requirements for the H II Transfer Vehicle System Requirements Document | 2009 | |
| ISS/OM | SSP 50949 | ISS Configuration Document | 2019 | |
| ISS/OM | SSP 51066 | ISS End of Life Deorbit Strategy and Contingency Action Plan | 2018 | |
| ISS/OM | SSP 50200 01 ANX M | Station Program Implementation Plan Volume 1: Station Program Management Plan, Annex M: Systems Engineering & Integration Office Plan | 2017 | |
| ISS/OM | SSP 50699 03 | ISS Certification Baseline Volume 3: Flight Attitudes | 2014 | |
| ISS/OM | SSP 51066 | ISS End of Life Deorbit Strategy and Contingency Action Plan | 2018 | |
| ISS/OM | SSP 50627 | Generic International Space Station (ISS) Plug in Plan (IPiP) Integration Process for Future Portable Loads | 2020 | |
| ISS/ON | SSP 50808 | International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Requirements Document (IRD) | 2018 | |
| ISS/ON | SSP 50809 | International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Control Document (ICD) for Dragon | 2015 | |
| ISS/ON | SSP 50831 | International Space Station (ISS) To Commercial Orbital Transportation Services (COTS) Ultra High Frequency Communications Unit (CUCU) Interface Requirements Document (IRD) | 2010 | |
| ISS/ON | SSP 50833 | International Space Station Program Cargo Transport Interface Requirements Document | 2015 | |
| ISS/ON | SSP 50844 PART 1 | Space Station Control Center to SpaceX Ground Segment Interface Control Document, PART 1 | 2010 | |
| ISS/ON | SSP 50844 PART 2 | Space Station Control Center to SpaceX Ground Segment Interface Control Document, PART 2 | 2010 | |
| ISS/ON | SSP 50850 | NASA/Space Exploration Technologies (SpaceX) Joint Integration, Verification and Test Plan | 2012 | |
| ISS/ON | SSP 50867-01 | Space Station Control Center to Northrup Grumman Ground Segment Interface Control Document, PART 1 | 2021 | |
| ISS/ON | SSP 50867-02 | Space Station Control Center to Northrup Grumman Ground Segment Interface Control Document, PART 2 | 2021 | |
| ISS/ON | SSP 50868 | NASA/Northrup Grumman Joint Integration, Verification and Test Plan | 2020 | |
| ISS/ON | SSP 50885 | International Space Station (ISS) to Commercial Orbital Transportation Services (COTS) Interface Control Document (ICD) for Cygnus | 2016 | |
| ISS/ON | SSP 50902 | Transportation Integration Office Certification of Flight Readiness Implementation Plan | 2019 | |
| ISS/ON | SSP 50942 | International Space Station (ISS) to Boeing Commercial Crew Transportation System (CCTS) Interface Control Document (ICD) | 2020 | |
| ISS/ON | SSP 50964 | Visiting Vehicle ISS Integration Plan | 2018 | |
| ISS/ON | SSP 50977 | International Space Station (ISS) to SpaceX Commercial Crew Transportation System (CCTS) Interface Control Document (ICD) | 2019 | |
| ISS/ON | SSP 50995 | ISS/Boeing Commercial Crew Transportation System (CCTS) Joint Integration, Verification and Test Plan | 2021 | |
| ISS/ON | SSP 50996 | ISS/Space X Crew Joint Integration, Verification and Test Plan | 2023 | |
| ISS/ON | SSP 51059 | International Space Station (ISS) To Commercial Orbital Transportation Services (COTS) Interface Control Document (ICD) for Dream Chaser Cargo System (DCCS) | 2022 | |
| ISS/ON | SSP 51060 | Sierra Nevada Joint Integration, Verification and Test Plan (JIVTP) | 2019 | |
| ISS/ON | SSP 51061 | Space Station Control Center to Sierra Nevada Corporation (SNC) Dream Chaser Control Center Ground Segment Interface Control Document | 2020 | |
| ISS/ON | SSP 51062 | Huntsville Operations Support Center (HOSC) to Sierra Nevada Corporation (SNC) Dream Chaser Ground Segment Interface Control Document (ICD) | 2021 | |
| ISS/ON | SSP 50438 PART 2 | International Space Station to H II Transfer Vehicle Interface Control Document, PART 2 | 2019 | |
| ISS/ON | SSP 51070 | ISS to JAXA HTV-X Interface Requirements Document (IRD) | 2022 | |
| ISS/ON | SSP 51072 | ISS to JAXA HTV-X ICD | 2020 | |
| ISS/ON | SSP 51084 | NASA/JAXA Bilateral Integration and Verification Plan for HTV-X | 2022 | |
| ISS/ON | SSP 51101 | U.S. Deorbit Vehicle Systems Requirements Document | 2024 | |
| ISS/ON | SSP 51105 | United States Deorbit Vehicle (USDV) ISS Integration Plan | 2024 | |
| ISS/OZ | SSP 52054 | Research Integration Office Certification of Flight Readiness Implementation Plan | 2019 | |
| Orion | MPCV 72008 | Orion Program Plan | ||
| Orion | MPCV 72523 | Orion Program Configuration and Data Management Plan | ||
| Orion | MPCV 72526 | NASA/ESA Bilateral Data Exchange Agreements, Lists, and Schedules (BDEALS) for the European Service Module (ESM) | ||
| Orion | MPCV 72568 | Orion Multi-Purpose Crew Vehicle (MPCV) Program-to-Space Launch System Program (SLSP) & Flight Operations Directorate (FOD), Bilateral Software Hardware Exchange Agreements, Lists | ||
| Orion | MPCV 72575 | Orion MPCVProgram-to-Space Launch System Program (SLSP) & Flight Operations Directorate (FOD), Bilateral Data Exchange Agreements, Lists, and Schedules (BDEALS) |
File details come from the government source that posted it. Updated .