View the file

Other files for this federal contract opportunity

Other files attached to Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation, newest first.
File Type Posted
ACX Instrument Implementation_SF30 Amendment 1.pdf PDF
Enclosure BB_ACX Final PEP.pdf PDF
Attachment W_Final OCI Plan.pdf PDF
Attachment J_Final Safety and Health Plan.pdf PDF
Attachment C_ Final GIRD.pdf PDF
ACX_Cover Letter FRFP_80GSFC23R0012.pdf PDF
Attachment S_Final Concept of Operations (CONOPS).pdf PDF
Enclosure AA_Final IT Security Management Plan Template.pdf PDF
ACX FRFP Cost Exhibits.pdf PDF
Attachment Q_Final GOES Reliable Data Delivery Protocol (GRDDP).pdf PDF
Attachment G_Final EDM.pdf PDF
Attachment B_ACX_ Final PORD.pdf PDF
ACX FRFP SF33.pdf PDF
Enclosure CC_Final 418-XO-PLN-0109 GeoXO QASP FINAL V2.0.pdf PDF
Exhibit 8_ACX Final PPQ.pdf PDF
Attachment V_Final Requirements Statements List.pdf PDF
Attachment P_Final ACX Radiances Upwelling.pdf PDF
Attachment O_Final ACX FRFP CWBS.pdf PDF
Attachment N_Final DEIA Plan.pdf PDF
Attachment M_Final Applicable Documents List.pdf PDF
Attachment L_Final IT Security Management Plan.pdf PDF
Attachment F_Final ACXCDRL_0073_V_1_0.pdf PDF
Attachment A_ACX_ Final SOW.pdf PDF
ACX_FRFP_80GSFC23R0012.pdf PDF
ACX Draft RFP Questions_Answers.pdf PDF
Enclosure BB_ACX DRFP Performance Evaluation Plan.pdf PDF
ACX DRFP Cost Exhibits.pdf PDF
Attachment U_FPGA final v1.0 08112022.pdf PDF
Attachment T_DEIA Plan DRD.pdf PDF
Attachment N_DEIA Plan.pdf PDF
Attachment J - Safety and Health Plan.pdf PDF
Attachment G_EDM.pdf PDF
ACX_DRFP_80GSFC23R0012.pdf PDF
ACX_Cover Letter DRFP_80GSFC23R0012.pdf PDF
Attachment P_ACX Radiance Upwelling.pdf PDF
Attachment R_GOES Reliable Data Delivery Protocol.pdf PDF
Attachment M_IT Applicable Documents List.pdf PDF
Attachment L - IT Security Management Plan.pdf PDF
Attachment F_ACXCDRL V0.14 DRAFT.pdf PDF
Attachment D_ACX Unique Instrument Interface Document.pdf PDF
Attachment C_GIRD.pdf PDF
Attachment B_ACX_PORD.pdf PDF
Attachment A_ACX_SOW.pdf PDF
Enclosure CC_ACX PPQ.pdf PDF
Enclosure AA_IT Security Management Plan Template.pdf PDF
Attachment V_Requirements Statements List.pdf PDF
Attachment S_Concept of Operations (CONOPS).pdf PDF
Attachment I_OCI Plan DRD.pdf PDF
Attachment E_Instrument Mission Assurance Requirements.pdf PDF
ACX DRFP SF33.pdf PDF
Show all 50

Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Candace Carlisle Digitally signed by Candace Carlisle Date: 2023.03.23 10:56:20 -04'00'

Geostationary eXtended Observations (GeoXO) Flight Project

Atmospheric Composition (ACX) Contractor Work Breakdown Structure

(CWBS)

March, 2023

Prepared by:

Heather Matthews

Heather Matthews

Digitally signed by Heather Matthews Date: 2023.03.23 10:44:42 -04'00'

GeoXO Flight Deputy Project Manager/Resources

Approved by:

Candace Carlisle GeoXO Flight Project Manager

Attachment O: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary

1. DESCRIPTION / PURPOSE

The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, program visibility, and assignment of responsibilities. Additionally, the CWBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work. The CWBS dictionary provides a narrative description of the work tasks and effort to be performed in each CWBS element.

2. PREPARATION INFORMATION

Contents:

The CWBS and CWBS dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:

CWBS – A logical, hierarchical display of the subdivision of all project work to be completed.

The CWBS shall include the approved element title and element number.

CWBS dictionary – The CWBS dictionary shall briefly describe and document the work content of every CWBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).

The CWBS levels shall be governed by the Following. The actual letter and number designations can be adapted to meet the needs of the Contractor’s systems

Level 1 - Total contract effort

Level 2 Definitions: Major contract activity as described below

A. Engineering Unit / Non-Recurring Activities – All effort to plan and manage the design of the instrument including detailed design activities, design reviews, risk reduction (engineering models, etc), software development, ground support equipment (GSE) development, verification planning, etc.

B. Flight Model (FM) -1 – All effort related to fabrication, assembly, test, launch operations and on-orbit testing of the satellite

C. FM-2

D. FM-3

E. Special Tasks – all un-issued special task funds remain in this level 2 WBS F. Mission Operations - Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission

Level 3 Definitions (Note: X denotes the Level 2 Contract Activity) – the work content as described is not necessarily all inclusive.

X.01 Program Management – Including program leadership, resource management, program planning (schedule), data management, configuration management, support for major design reviews

File details come from the government source that posted it. Updated .