Attachment O_Final ACX FRFP CWBS.pdf
PDF 543 KB Posted
- Attached to
- Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation Federal contract opportunity
- Solicitation number
- 80GSFC23R0012
View the file
Other files for this federal contract opportunity
Show all 50
Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Candace Carlisle Digitally signed by Candace Carlisle Date: 2023.03.23 10:56:20 -04'00'
Geostationary eXtended Observations (GeoXO) Flight Project
Atmospheric Composition (ACX) Contractor Work Breakdown Structure
(CWBS)
March, 2023
Prepared by:
Heather Matthews
Heather Matthews
Digitally signed by Heather Matthews Date: 2023.03.23 10:44:42 -04'00'
GeoXO Flight Deputy Project Manager/Resources
Approved by:
Candace Carlisle GeoXO Flight Project Manager
Attachment O: Contractor Work Breakdown Structure (CWBS) and CWBS Dictionary
1. DESCRIPTION / PURPOSE
The CWBS establishes a product-oriented framework for reporting program cost, schedule, and technical performance and provides a basis for uniform planning, reporting status, program visibility, and assignment of responsibilities. Additionally, the CWBS provides a product-oriented logical subdivision of hardware, software, services, facilities, etc., that contribute to and/or make up the total project scope of effort and work. The CWBS dictionary provides a narrative description of the work tasks and effort to be performed in each CWBS element.
2. PREPARATION INFORMATION
Contents:
The CWBS and CWBS dictionary are two distinct project documents used for defining the approved project scope of work. The contents of each document are detailed in the following paragraphs:
CWBS – A logical, hierarchical display of the subdivision of all project work to be completed.
The CWBS shall include the approved element title and element number.
CWBS dictionary – The CWBS dictionary shall briefly describe and document the work content of every CWBS element and relevant efforts associated with each element (e.g., design, development, and manufacturing).
The CWBS levels shall be governed by the Following. The actual letter and number designations can be adapted to meet the needs of the Contractor’s systems
Level 1 - Total contract effort
Level 2 Definitions: Major contract activity as described below
A. Engineering Unit / Non-Recurring Activities – All effort to plan and manage the design of the instrument including detailed design activities, design reviews, risk reduction (engineering models, etc), software development, ground support equipment (GSE) development, verification planning, etc.
B. Flight Model (FM) -1 – All effort related to fabrication, assembly, test, launch operations and on-orbit testing of the satellite
C. FM-2
D. FM-3
E. Special Tasks – all un-issued special task funds remain in this level 2 WBS F. Mission Operations - Long term mission support including any management, business management support, systems engineering etc that is not unique to a particular mission
Level 3 Definitions (Note: X denotes the Level 2 Contract Activity) – the work content as described is not necessarily all inclusive.
X.01 Program Management – Including program leadership, resource management, program planning (schedule), data management, configuration management, support for major design reviews