Attachment E_Final Instrument Mission Assurance Requirements.pdf

PDF 20 MB Posted

Attached to
Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation Federal contract opportunity
Solicitation number
80GSFC23R0012
Issued by
National Aeronautics and Space Administration Goddard Space Center

View the file

Other files for this federal contract opportunity

Other files attached to Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation, newest first.
File Type Posted
FRFP 80GSFC23R0012 Amendment 1 Continuation Page.pdf PDF
ACX Instrument Implementation_SF30 Amendment 1.pdf PDF
Attachment U_Final FPGA final v1.0 08112022.pdf PDF
Attachment T_Final DEIA Plan DRD.pdf PDF
Attachment R_Final GOES Reliable Data Delivery Protocol.pdf PDF
Attachment K_Final Small Business Subcontracting Plan.pdf PDF
Attachment I_Final OCI Plan DRD.pdf PDF
Attachment H_Final Financial Rptg.pdf PDF
Attachment D_ACX_ Final Unique Instrument Interface Document.pdf PDF
Enclosure BB_ACX Final PEP.pdf PDF
Attachment W_Final OCI Plan.pdf PDF
Attachment J_Final Safety and Health Plan.pdf PDF
Attachment C_ Final GIRD.pdf PDF
ACX_Cover Letter FRFP_80GSFC23R0012.pdf PDF
Attachment S_Final Concept of Operations (CONOPS).pdf PDF
Enclosure AA_Final IT Security Management Plan Template.pdf PDF
ACX FRFP Cost Exhibits.pdf PDF
Attachment Q_Final GOES Reliable Data Delivery Protocol (GRDDP).pdf PDF
Attachment G_Final EDM.pdf PDF
Attachment B_ACX_ Final PORD.pdf PDF
ACX FRFP SF33.pdf PDF
Attachment W - OCI Plan.pdf PDF
Attachment Q_GOES Reliable Data Delivery Protocol (GRDDP).pdf PDF
Attachment K - Small Business Subcontracting Plan.pdf PDF
Attachment H_Financial Rptg.pdf PDF
Enclosure DD_418-XO-PLN-0109 GeoXO QASP FINAL V2.0.pdf PDF
Enclosure BB_ACX DRFP Performance Evaluation Plan.pdf PDF
ACX DRFP Cost Exhibits.pdf PDF
Attachment U_FPGA final v1.0 08112022.pdf PDF
Attachment T_DEIA Plan DRD.pdf PDF
Attachment O_ACX DRFP CWBS.pdf PDF
Attachment N_DEIA Plan.pdf PDF
Attachment J - Safety and Health Plan.pdf PDF
Attachment G_EDM.pdf PDF
ACX_DRFP_80GSFC23R0012.pdf PDF
ACX_Cover Letter DRFP_80GSFC23R0012.pdf PDF
Attachment P_ACX Radiance Upwelling.pdf PDF
Attachment R_GOES Reliable Data Delivery Protocol.pdf PDF
Attachment M_IT Applicable Documents List.pdf PDF
Attachment L - IT Security Management Plan.pdf PDF
Attachment F_ACXCDRL V0.14 DRAFT.pdf PDF
Attachment D_ACX Unique Instrument Interface Document.pdf PDF
Attachment C_GIRD.pdf PDF
Attachment B_ACX_PORD.pdf PDF
Attachment A_ACX_SOW.pdf PDF
Enclosure CC_ACX PPQ.pdf PDF
Enclosure AA_IT Security Management Plan Template.pdf PDF
Attachment V_Requirements Statements List.pdf PDF
Attachment S_Concept of Operations (CONOPS).pdf PDF
Attachment I_OCI Plan DRD.pdf PDF
Show all 50

Geostationary Extended Observations (GeoXO) Atmospheric Composition (ACX) Instrument Implementation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: February 03, 2021 418-XO-IMAR-0026 Responsible Organization: GeoXO Flight Project/Code 418 Version 2.2

To verify the correct version of this document, please contact the GeoXO Series Configuration Management

Office.

ii

Geostationary eXtended Observations (GeoXO) Flight Project

Instrument Mission Assurance Requirements (IMAR) Signature page

Prepared by:

Electronically approved by:

07/21/2022

Kuiana E. Carson Date GeoXO Flight Project, Deputy Chief Safety & Mission Assurance NASA GSFC, Code 383

Reviewed by:

08/04/2022

Joseph M. Spector Date GeoXO Flight Project, Chief Safety & Mission Assurance

NASA GSFC, Code 383

08/08/2022

Steven W. Bidwell Date GeoXO Flight Project, Sys. Engineering Manager NASA GSFC, Code 418

Approved by:

Christopher Wheeler electronically approved for:

08/08/2022

Monica Todirita Date GeoXO Flight Project, Deputy Project Manager NASA GSFC, Code 418

Effective Date: February 03, 2021 418-XO-IMAR-0026

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Document Change Record (DCR)

CCR GeoXO-X00001 Rev: Title: GEO-XO Flight IMAR Baseline Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-GXIMAR-0026 CCB Date: 10/15/2020 Doc Version: Baseline 1.0 Doc Section: All Contract Mod#: N/A DOORs Version: 1.0 Doc Change Date: 10/15/2020 DOORs ID #: 1.0

CCR GeoXO-X00007 Rev: Title: GXIMAR: Updates to Instrument MAR Contract # N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/03/2021 Doc Version: Baseline 1.1 Doc Section: All Contract Mod#: N/A DOORs Version: 1.1 Doc Change Date: 02/03/2021 DOORs ID #: IMAR172 (4.1.0-3), 370 (7.1.0-5) Added: IMAR760 (4.7.0-4)

CM Note: Changed “Geostationary and eXtended Orbits (GEO-XO) Flight Project” to “Geostationary eXtended Observations (GeoXO)”, updated the title page, signature page, and Document Change Record (DCR). Made changes in the acronym from GXIMAR to IMAR. Additionally, updated all references from GEO-XO to GeoXO for v1.1.

CCR GeoXO-X00109 Rev: Title: IMAR: baseline IMAR as v2.0 Contract #: ACX - 80GSFC22CA032; ACX - 80GSFC22CA033; GXI - Phase B; GXS - 80GSFC21CA023; GXS - 80GSFC21CA024; LMX - 80GSFC22CA002; LMX - 80GSFC22CA025; OCX - 80GSFC22CA042; OCX - 80GSFC22CA04 GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 08/08/2021 Doc Version: Baseline 2.0 Doc Section: All Contract Mod#: 2, 3; 11, N/A GXI – Phase B N/A DOORs Version: 2.0 Doc Change Date: Aug. 11, 2022 DOORs ID #: v2.0

CM Note: IMAR is released as Version 2.0 due to major revision and significant changes within the document and the signature page is revised.

CCR GeoXO-X00147 Rev: A Title: IMAR: Updated Changed for reconciliation with GPR 8705.4A Contract #: N/A GeoXO S/C: GeoXO Effectivity: Instruments CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 01/10/2023 Doc Version: Baseline 2.1 Doc Section: 1., 2., 4., 6., 7., 8., 11., 12., 15., 16.

Contract Mod#: N/A DOORs Version: 2.1 Doc Change Date: Jan. 10, 2023 DOORs ID #: v2.1

Modify: IMAR22 (1.7.0-4), 36 (1.9.0-1), 37 (1.9.0-2), 44 (2.1.0-1), 65 (2.2.1.2.0-6), 67 (2.2.1.3.0-7), 168 (7.1.0-7), 177 (4.3.0-1), 182 (4.3.0-6), 199 (4.7.0-1), 204 (4.4.0-2), 222 (4.5.0-5), 294 (6.1.0-2), 309 (6.1.0-3), 369 (7.1.0-6), 370 (7.1.0-9), 371 (7.1.0-12), 372 (7.1.0-10), 441 (8.4), 544 (11.2.0-4), 552 (15.0-1), 611 (12.0-1), 764 (1.6.0-4), 766 (1.7.0-1), 812 (4.1.0-5), 815 (4.3.0-9.0-1), 816 (4.3.0-11), 817 (4.3.0-12), 842 (6.6.0-4), 850 (7.1.0-8), 899 (16.0-1), 906 (1.9.0-4), 915 (4.5.0-3)

Delete: IMAR38, 854, 907, 908, 909

CCR GeoXO-X00169 Rev: Title: IMAR: remove reference to GXISOW Contract #: N/A GeoXO S/C: GeoXO Effectivity: none CCB Status: Approved Doc #: 418-XO-IMAR-0026 CCB Date: 02/27/2023 Doc Version: Baseline 2.1a Doc Section: 2.1, 5.2, 6.1 Contract Mod#: N/A DOORs Version: 2.1a Doc Change Date: Feb. 27, 2023 DOORs ID #: v2.1a

CM note: CM admin change to remove requirement statement IMAR791, GXISOW898, corrected NASA NASA-STD-8739.8 and

NPR 8715.7B.

Effective Date: February 03, 2021 418-XO-IMAR-0026

To verify the correct version of this document, please contact the GeoXO Series Configuration Management Office.

Title: IMAR: Changes to MRB/FRB delivery, adding radiographic inspections, editorial changes GeoXO S/C: GeoXO Effectivity: Interface IMAR Doc #: 418-XO-IMAR-0026 Doc Version: Baseline 2.2 DOORs Version: 2.2

CCR GeoXO-X00207 Rev:

Contract #: N/A CCB Status: Approved CCB Date: 06/29/2023 Contract Mod#: N/A Doc Change Date: June. 29, 2023 DOORs ID #: v2.2

Modify: IMAR4 (1.2.0-3), 7 (1.2.0-5), 9 (1.3.0-1), 12 (1.4.0-1), 13 (1.4.0-2), 17 (1.6.0-1), 20 (1.6.0-6), 22 (1.7.0-4), 26 (1.4.0-3), 36 (1.9.0-1), 37 (1.9.0-2), 53 (2.2.1.1.0-2), 54 (2.2.1.2.0-3), 61 (2.2.1.2.0-7), 62 (2.2.1.2.0-13), 65 (2.2.1.2.0-6), 67 (2.2.1.3.0-7), 68 (2.2.1.2.0-8), 70 (2.2.1.3.0-1), 72 (2.2.1.3.0-9), 95 (3.1.0-4), 101 (3.2.0-2), 113 (3.3.3.1.0- 1), 119 (3.3.3.3.0-6), 129 (3.3.5.0-1), 130 (3.3.5.0-2), 139 (3.3.6.0-2), 155 (4.3.0-2), 168 (7.1.0-7), 177 (4.3.0-1), 218 (4.5.0-1), 219 (4.5.0-2), 345 (6.7.0-3), 370 (7.1.0-9), 376 (7.2.3-1), 377 (7.2.3-3), 389 (7.3.1.2.0-1), 402 (7.3.4.0-3), 404 (7.3.4.0-5), 552 (15.0-1), 611 (12.0-1), 744 (14.0-1), 758 (2.2.1.3.0-4), 762 (1.1.0-1), 765 (1.6.0-7), 767 (1.7.0-2), 778 (2.1.2.0-1), 779 (2.2.1.2.0-9), 781 (2.2.1.2.0-11), 796 (3.3.3.4.0-3), 801 (3.3.3.4.0-9), 805 (3.3.8), 806 (3.3.8.0-1), 807 (3.3.8.0-2), 808 (4.1.0-1), 809 (4.1.0-2), 810 (4.1.0-3), 815 (4.3.0-9.0-1), 837 (6.4.0-15), 850 (7.1.0-8), 867 (7.2.3-2), 870 (7.3.1.0-1), 871 (7.3.1.3.0-2), 892 (6.1.0-7), 899 (16.0-1), 906 (1.9.0-4), 913 (3.3.7.0-4), 930 (6.1.0-4), 923 (6.4.0-12), 931 (6.1.0-6), 934 (3.3.3.4.0-11), 935 (3.3.3.4.0-13) Add: IMAR936 (2.2.1.3.0-8), 937 (2.2.1.2.0-12), 938 (3.3.3.4.0-4); 939 (7.3.1.0-2) Modify: reserved IMAR933 (1.2.0-2) [replaced original text with “Reserved’; DI retains for potential future use;]

File details come from the government source that posted it. Updated .