About this file

This document outlines a request for proposals for repairs, operations, maintenance, and engineering services. The National Aeronautics and Space Administration Goddard Space Center is soliciting proposals under solicitation number 80GSFC22R0011 to provide ROME services. Offerors should submit proposals in response to performing maintenance, operations, and engineering support at multiple NASA facilities. The deadline for proposal submission is not specified in the document provided.

View the file

Other files for this federal contract opportunity

Other files attached to RFP - Repairs, Operations, Maintenance, and Engineering (ROME) Services - RFP, newest first.
File Type Posted
ROME Virtual Site Visit Attendees August 11 2022.pdf PDF
80GSFC22R0011 ROME RFP Amendment 1.zip ZIP file
ROME RFP QA Set 9.pdf PDF
ROME RFP QA Set 10.pdf PDF
ROME RFP QA Set 5.pdf PDF
ROME RFP QA Set 7.pdf PDF
ROME RFP QA Set 8.pdf PDF
ROME RFP QA Set 6.pdf PDF
ROME RFP QA Set 13.pdf PDF
ROME RFP QA Set 14.pdf PDF
ROME RFP QA Set 11.pdf PDF
ROME RFP QA Set 12.pdf PDF
ROME RFP QA Set 16.pdf PDF
ROME RFP QA Set 15.pdf PDF
E Library Updates 2.zip ZIP file
ROME RFP QA Set 4.pdf PDF
ROME RFP QA Set 3.pdf PDF
ROME RFP QA Set 1.pdf PDF
ROME RFP QA Set 2.pdf PDF
ROME e-Library Documents.zip ZIP file
ROME QA.pdf PDF
80GSFC22R0011 ROME RFP.zip ZIP file
Enclosures.zip ZIP file
Attachments.zip ZIP file
Appendices.zip ZIP file
Exhibits.zip ZIP file
E-Library Updates.zip ZIP file
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA Sites

GSFC GB– Greenbelt Utilities

• Steam Distribution – 5.7 miles – underground 100 psi steam supply and condensate return piping to buildings for heat, humidity, process.

• Chilled Water Distribution – 11.2 miles – underground chilled water piping for cooling, dehumidification, and process.

• Electrical Distribution - 25 miles – power cables to buildings and site.

• Power/Comm Ductbank - 28.7 miles – underground concrete encased conduits.

• Natural Gas - 1.2 miles – fuel for central plant boilers and local boilers and cafeteria kitchen use.

• Landfill Gas - 6 miles – fuel for central plant boilers.

• Fuel Oil – Storage tanks and underground distribution to B24 and B31. Fuel used for central plant boilers and emergency power generation.

• Domestic Water - 15.2 miles – for fire protection and sanitary and consumption needs.

• Chiller Condenser and Boiler Water – two deep wells at B24 and B31

• Sanitary Sewer – 5.1 miles – conveys sanitary waste offsite

• Storm Drain – 8.2 miles – underground storm water conveyance

• Paving – 140.5 acres – roadways and parking lots

GSFC GB – Building 24 Central Plant

GSFC GB – Building 31 Central Plant

Chilled Water System

B24 Chillers 3 & 4

B24 Cooling Tower A

B24 Chiller 6 B31 Chiller 3

Underground Chilled Water Piping

Steam System

Building 24 - Boiler #4

Click to add text

Underground Steam Lines

Electrical Distribution System

Main Substation East Substation

B31 Generator Plant Electric Manhole and Feeders

GSFC – Wallops (WFF) Overview

Utilities on center provide critical power, potable water, cooling, heating, fire protection, and sanitary needs, necessary to occupy the facilities and perform mission work.

4 Central Plants: (Potable Water, Wastewater, Emergency Power, and Propane)

• The Domestic Water system provides potable drinking water and water for the fire protection system.

• The Wastewater Plant treats wastewater for the entire facility.

• The Emergency Power system provides backup power to the Main Base, Mainland, and Island.

• The Propane Distribution system distributes propane throughout the Main Base for heating

Population – 1200 employees Site Area – 6580 acres Building Area – 1.13 M gsf Replacement Value - $1,215M

GSFC – WFF Utilities Statistics

• Potable Water - 35 miles of piping, seven wells, two potable water chlorination plants, two ground level water storage tanks, and four elevated water storage tanks.

• Wastewater Plant - Five lift stations, 28 miles of sanitary lines and a 300,000 gallon per day wastewater treatment plant.

• Electrical Distribution - 36 miles of power cables to buildings and site.

• Propane Distribution - 5 miles of polypropylene piping to buildings.

• Storm Drain - 15 miles of underground storm water conveyance.

• Power/Communications Duct Bank - 12 miles of underground concrete-encased conduits.

• Paving – 57 miles of paved roads, 21 miles of unpaved roadways, and 69 acres of parking lots.

• Energy Management Control System - 40,000 + points programmed for the control and monitoring of HVAC systems, plant alarms, sewage lift stations and electrical power.

• Chilled Water Distribution - HVAC systems at WFF are mostly decentralized, though a small underground chilled water piping system of less than 1 mile provides cooling and dehumidification for part of the E-area.

N-150 Propane Distribution System

(3) 60,000 Gallon Tanks

(2) Vaporizers

WFF Wastewater Treatment Plant

Aerial View of

D-50 Wastewater Treatment Plant D-51 & D-52 Clarifiers

WFF Generators

U-12 Mainland 2 each 3MW Stationary GeneratorsD-8 Main Base 3MW Stationary Generator

A-E and Construction Projects Institutional Examples

- Gate and Road Improvements

- Bridge Studies

- Arc Flash Studies

- HVAC Replacements

- Utility Upgrades/Replacements

- Center Rehousing Projects

- Fire Alarm Replacements

- Asbestos Abatement ...and more

GSFC Greenbelt Contractor Occupied Facilities

B24 Central PlantB4 O&M Offices and Shops

GSFC Greenbelt – Additional Space

B79 Offices and Material Storage B18 Offices

File details come from the government source that posted it. Updated .