Enclosure 1 - Quality Assurance Surveillance Plan-1.27.20_Clean.pdf
PDF 87 KB Posted
- Attached to
- Total and Spectral solar Irradiance Sensor-2 (TSIS-2) Spacecraft Federal contract opportunity
- Solicitation number
- 80GSFC200009
About this file
This document summarizes a government quality assurance surveillance plan (QASP) for the Total and Spectral solar Irradiance Sensor-2 (TSIS-2) Spacecraft contract. The QASP outlines the strategy and approach for NASA Goddard Space Flight Center to monitor contractor performance, including defining insight areas of risk around system maintenance, IT security, configuration management, and other operational areas. It details the surveillance team organization and resources, including roles for the contracting officer, contracting officer's representative, Defense Contract Management Agency, and Chief Safety and Mission Assurance Officer. The QASP also specifies the forms of surveillance to be used, such as communications, management reviews and reporting, and describes selected surveillance team activities for work review, government property administration, performance monitoring, and safety.
This federal contract opportunity notice invites proposals to acquire a spacecraft and related services, including mission operations, for the TSIS-2 mission. The NAICS code is 336414 with a small business size standard of 1250 employees. Offerors shall submit proposals by February 6, 2020. The contract will be a firm-fixed-price award with an estimated June 2023 delivery date. The anticipated contract award is May 2020 with a June 2020 effective date. The contract will be performed offsite at the contractor's facilities.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENCLOSURE 1
TSIS-2 Spacecraft
GOVERNMENT QUALITY ASSURANCE
SURVEILLANCE PLAN
FOR INFORMATION PURPOSES ONLY
FOREWARD
Under performance-based acquisitions such as this, the Contractor assumes more responsibility and greater risk in exchange for more flexibility and less direct Government involvement in contract activities. However, the Government still has a responsibility to conduct surveillance.
Surveillance spans a spectrum of Government involvement. Surveillance may be as simple as inspecting a delivered support or service at acceptance or as complex as continually monitoring contractor performance. To meet this responsibility, the Government needs to understand the risks involved in the Contractor's activity and how the Contractor is managing those risks.
This Government Quality Assurance Surveillance Plan has been prepared to describe the Government’s surveillance of this contract. It is a “living” document that will be tailored to the contractor selected. The Government welcomes suggestions for improving this Plan. Of particular interest are ideas on what information the Government should monitor (i.e., metrics) and how the Government can most cost-effectively obtain the relevant performance data it needs.
TSIS-2 Spacecraft
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
1.0 INTRODUCTION
1.1 Purpose
The purpose of this Government Quality Assurance Surveillance Plan (QASP) is to define the overall approach the NASA Goddard Space Flight Center (GSFC) intends to use to monitor and survey Contractor offsite performance under the TSIS-2 Spacecraft contract. This QASP defines the process the Government expects to follow to obtain data, evaluate the Contractor, and determine if contract performance conforms to contract requirements. The goal is to balance the level of Government surveillance with perceived impacts and risks associated with performance hereunder. The QASP can be changed unilaterally by the Government at any time during the contract.
GSFC plans to utilize a surveillance team to evaluate Contractor performance and direct surveillance activities. The team will establish and rely on objective and subjective performance metrics based on the Spacecraft contract Statement of Work (SOW) and task orders issued thereunder to evaluate Contractor performance against requirements.
The QASP is a Government-developed surveillance tool prepared in accordance with FAR 46.4 and NFS 1846.4. It shall not be included in the contract, per NFS 1846.401(a) (iii), but provided to the Contractor for informational purposes only.
In case of conflict, the Spacecraft MAR TSIS2-SC-RQ-0006 takes precedence over this QASP.
1.2 Scope
This QASP identifies the program requirements, strategies, resources, review and control processes, surveillance activities, and metrics for continuous measurement of Contractor performance. This plan provides effective and systematic surveillance methods for evaluating the Contractor services, processes, and products provided under this contract. The Government may evaluate work at any time during the Contractor’s work performance.
The intent of the QASP is to ensure that the Contractor performs in accordance with acceptable quality levels and the Government receives the quality of services and products called for in the contract. This QASP does not detail how the Contractor accomplishes the work. Rather, the QASP is based on the premise that the contractor, not the Government, is responsible for managing its quality controls and ensuring that performance meets the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.
The QASP is intended to be a “living” document from which resources and activities will evolve from one phase to another during the life of the contract, and will be updated as required and defined in this document.
This plan is applicable to all services performed or products provided by the Spacecraft vendor.
Throughout this QASP, the term “Contractor” is used. In terms of this plan, it should be known that unless explicitly stated, the term “Contractor” is applicable to both the Spacecraft vendor and any and all of its subcontractors.
The surveillance program shall be a collaborative and integrated effort that includes all areas of contract management, including the following:
a. Engineering & Technology
b. Quality Assurance
c. Procurement/Subcontracting/Purchasing
d. Finance
e. Property
f. Environmental
g. Export Control
h. Safety and Health
i. Security
1.3 Program Definition and Contract Description
1.3.1 Program Background and Definition
The TSIS-2 Flight Project (Code 424) at GSFC is part of the Earth Science Project Division (Code 420). TSIS-2 is a Category 3/Class D mission with a 3 year mission life. The TSIS-2 instrument is almost identical to the TSIS-1 Instrument that was manifested on the ISS in December 2017. The TSIS-2 spacecraft shall accommodate the TSIS-2 payload, consisting of the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM) with their respective General Common Interface (GCI) electronics.
1.4 Guiding Directives
The guiding documents for this surveillance effort include the Contract SOW, performance standards, and Task Order deliverables and/or requirements as specified. The contract identifies general requirements and the Task Orders identify specific objectives or results desired for each issued Task Order requirement.
1.5 References and Applicable Documents
a. American National Standard Quality Systems - Model for Quality Assurance (QA) in
Design, Development, Production, Installation and Servicing, American National Standards Institute (ANSI)/International Organization for Standardization (ISO)/American Society for Quality Control (ASQC) Q9001: 2000
b. American National Standard Quality Management System - Requirements, ANSI/ISO/ASQ Q9001: 2000
c. NPR 7120.5, NASA Space Flight Programs and Project Management Requirements
d. NPR 7150.2A, NASA Software Engineering Requirements
2.0 SURVEILLANCE STRATEGY AND APPROACH
2.1 General
There exists a wide-ranging spectrum associated with surveillance, ranging from oversight to insight. The strategy and approach to surveillance by GSFC for the TSIS-2 Spacecraft contract, as detailed in this plan, is one that concentrates primarily on insight as opposed to oversight.
However, some limited areas do exist where oversight is conducted either via GSFC exercising approval authority on contract-deliverable documentation in critical areas of performance or participation in the Contractor's configuration management process. Regardless, the Government reserves the right to initiate additional surveillance activities (insight or oversight) on an ‘as-needed’ basis, based upon circumstances and data collected (adverse trends, negative data points, lack of corrective action, etc.) via the surveillance activities defined in this plan. As applicable, any and all oversight activities would be communicated and coordinated with the Contractor and subsequently documented within this QASP.
The level of risk and the impact of failure are major determinants in helping define the type of surveillance to be conducted. Clearly, if the impact of failure is minor and the level of risk is low, only a small amount of insight-driven surveillance would normally be needed. Conversely, if the impact of failure could be significant and the level of risk is high, more extensive surveillance (including possible oversight surveillance) is warranted.
GSFC will strive to use an insight-driven surveillance approach throughout the performance of this contract. The overall surveillance goal will be to obtain objective evidence and data that enable the Government to determine whether the Contractor's program and processes are functioning as intended in accordance with the terms of the contract. The focus will be on prevention rather than detection, i.e., emphasizing controlled processes and methods of operation, as opposed to relying solely upon inspection and test to identify problems.
This insight-based approach to surveillance as applied to the contract will result in lower levels of Government intervention, thus allowing the Contractor to assume full accountability and responsibility for integrity of processes. Although less obtrusive than oversight, this insight-based approach to surveillance continues to provide the Government with visibility into the Contractor's programmatic processes, technical processes, progress, and issues at all levels.
As required by FAR 42.1502 and GPR 5100.2, Supplier Performance Evaluations, the Contracting Officer (CO), in collaboration with the Contracting Officer’s Representative (COR), will annually complete a Contractor Performance Assessment Reporting System (CPARS) evaluation, which will also be reviewed by the Contractor, and become a part of the Past Performance Information Retrieval System (PPIRS).
2.2 Surveillance Activity Limitations and Guidance
2.2.1 General
Surveillance of TSIS-2 Spacecraft contract, will be conducted on a non-interference basis and in a manner that will not unduly delay work being performed by the Contractor.
2.2.2 Insight
Insight is an assurance process that uses performance requirements and, if definable, performance metrics to ensure process capability, product quality and end-item effectiveness.
Insight relies on gathering a minimum set of product or process data that provides adequate visibility into the integrity of the product or process. The data may be acquired from Contractor records, usually in a non-intrusive parallel method.
Insight as applied to this contract will result in lower levels of Government surveillance and allow the Contractor to assume increased responsibility and accountability for the integrity of processes. Insight will rely heavily on evaluating planned contract deliverables, performance standards, and existing Contractor procedures and working documents, if available.
2.2.3 Oversight
Oversight as applied to this contract will result in higher levels of Government surveillance. The Government will gather information pertaining to the Contractor’s process through on-site involvement and/or inspection in the process and will monitor the process itself. The Government’s involvement in the Contractor’s performance, through oversight, will be determined necessary by the COR.
2.3 Surveillance Organization and Resources
2.3.1 General
The activities detailed in this plan will be supported and performed by a group of individuals, many with differing levels of responsibilities, but all maintaining a level of consistency in terms of the surveillance strategy, approach, and activities in general. Specific entities supporting the TSIS-2 Spacecraft contract surveillance activities include the identified NASA GSFC personnel;
Contractor QA Department personnel (including their subcontractors); and contractor support services and delegated agency personnel, if applicable. Each of these entities and their associated responsibilities/input to the surveillance activities on TSIS-2 Spacecraft contract are described in the following paragraphs.
2.3.2 Surveillance Team
2.3.2.1 General Organization and Responsibilities
General organization and responsibilities of the Surveillance Team are as follows:
a. The surveillance team will be composed of key Government personnel. All surveillance activities will be implemented using NASA and NASA support-contractor personnel, a delegated agency (e.g., Defense Contract Management Agency (DCMA)), and/or a surveillance support contractor(s). The surveillance team may be composed of:
1. GSFC Procurement Personnel (i.e., CO, Contract Specialist)
2. GSFC’s Program Personnel (i.e., COR, and Resource/Financial Analyst(s));
3. GSFC Safety, Health and Security Personnel (both physical and Information
Technology (IT) Security);
4. GSFC Property Administrator Personnel;
5. Resident Office or Defense Contract Management Agency (DCMA) personnel;
6. GSFC Safety and Mission Assurance Personnel;
b. The team’s primary purpose will be to provide direction for contract surveillance activities and to serve as the Government’s focal point in reviewing and evaluating overall Contractor performance under the TSIS-2 Spacecraft contract. The team will obtain information from various sources, including deliverable Contractor documents, communications with the Contractor, and reports by other personnel or representatives (e.g., Safety, Health, or Security personnel; DCMA) who interact with the Contractor.
c. NASA GSFC has the responsibility for independently assuring that the Contractor's operations meet NASA's contract performance requirements and enable success. As such, surveillance team members will have open access to all areas in which this contract is being performed and will interface directly with their Contractor counterparts.
Government expertise with regards to the TSIS-2 contract may be applied in the form of technical consultants and/or providing assistance at working group meetings, design/development and specification reviews, review board meetings, surveys, audits, program reviews, and as in-plant representatives. The team will document problems, concerns and issues, and take note of Contractor accomplishments. They will collect performance metric data, where applicable, and will participate in Contractor review meetings, such as those described herein. Information will flow from individual team members through the COR to surveillance team representatives, who will present issues and achievements at surveillance team meetings. Information gained from these formal and informal exchanges of ideas and collection of data will be compiled and evaluated as a continuous measure of contract performance.
d. All available information will be evaluated, and any action by GSFC will be determined based upon the scope and magnitude of any particular issue or problem. The surveillance team chairperson, the COR, will formally notify the CO of situations where it is perceived that the Contractor has failed to take prudent corrective or preventive action, of situations that increase risk, or of findings of continued contractual non-compliance.
2.3.2.2 TSIS-2 Spacecraft Contracting Officer
a. The CO is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, issuing task orders, and safeguarding the interests of the United States in its contractual relationships. Within the surveillance area the CO takes inputs from the Program/Project managers, COR, Safety, Health, GSFC Safety and Mission Assurance Office, TSIS-2 Spacecraft Performance Evaluation Board, and others to establish the detailed surveillance requirements to be performed by NASA personnel, delegated to another Federal agency via a GSFC Letter of Delegation, or to be performed under contract by a surveillance support Contractor.
The CO will also assure that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
b. The CO will complete an annual Contractor performance assessment report using the
CPARS that will also be reviewed by the Contractor and become a part of the PPIRS.
2.3.2.3 TSIS-2 Spacecraft Contracting Officer’s Representative
a. The COR is designated in writing by the CO to act as his or her authorized technical representative to assist in administering the contract. The COR monitors the technical work performed under the contract, evaluates Contractor performance, serves as the primary interface for the Contractor and the CO for all technical matters, reports on contract status to Program/Project Management, and recommends corrective action when necessary. The COR is not empowered to make any contractual commitments, authorize any contractual changes on the Government’s behalf, or in any way direct the Contractor to operate in conflict with the contract terms and conditions. Any changes that the Contractor deems may affect the contract or task order value, terms, or conditions shall be referred to the CO for action. The COR’s limitations of authority are contained in the NASA Form 1634, COR Delegation.
b. The COR assumes full responsibility for directing the surveillance activities identified in this plan.
c. The COR will assist the CO in the completion of the contract’s annual performance assessment report using CPARS.
2.3.2.4 Defense Contract Management Agency (DCMA)
A DCMA representative may be co-located with the Contractor. The DCMA representative is tasked to provide surveillance support in accordance with the provisions of the GSFC Letter of Delegation and this plan.
2.3.2.5 Chief Safety and Mission Assurance Officer (CSO)
GSFC Safety and Mission Assurance (SMA), Code 300 assigns a Chief Safety and Mission Assurance Officer (CSO) to provide surveillance support to assure that contractor and subcontractor(s) meet the TSIS-2 Spacecraft contract requirements. The CSO is the principle interface between the TSIS-2 Flight Project (Code 424) and CSO and has leadership responsibility for accomplishing overall TSIS-2 Spacecraft contract QA surveillance within the guidelines of this plan. The CSO and its service support contractor are responsible for surveillance support of matters pertaining to hardware and software QA, systems reviews, system safety and reliability, parts, materials and processes, testing, and anomaly reporting/resolution. The SMA manages the collection of data and metrics from performance assurance, integration and test, fabrication, and system safety organizations and/or activities to facilitate the evaluation of the Contractor performance.
2.3.2.6 TSIS-2 Spacecraft Contractor Quality Assurance
It is expected that the Contractor will maintain a QA lead as part of its QMS. The Contractor's QA lead will serve a vital role in the success of the surveillance efforts detailed in this plan. In particular, it is expected that the Contractor will task its QA lead to serve as a focal point for the Government in several areas including but not limited to provision of and access to all requested insight data/lifecycle-related assets and artifacts as they pertain to the insight areas described in this plan, and all QA-related activities conducted by this group.
The Government expects that as necessary and applicable, the QA lead may direct the Government to other groups/individuals supporting the TSIS-2 Spacecraft contract effort in order to obtain requested insight data. These groups/individuals may include the Contractor's Program/Business Management office and/or representatives, discipline engineers, Configuration Management representatives, etc.
2.4 Forms of Surveillance
2.4.1 General
Surveillance on the TSIS-2 Spacecraft contract will be performed using any of the primary surveillance forms applied to the insight areas described in Section 3 of this document, during applicable stages of the contract. These primary forms of surveillance are described below.
2.4.2 Communications
Communications is a general surveillance activity. Communications is a two-way process and includes both written and oral communication. Examples of written communications activities that may be used in conducting surveillance include:
a. Exchanges from the Contractor to the Government of plans, procedures, quality records, reports, etc., and/or provision of read-only access to repositories which retain these items.
b. Exchanges from the Government to Contractor of letters, reports, review results, etc.
c. Ad hoc information submitted by the COR to the CO related to the Contractor’s electronic mail.
Examples of oral communications activities that may be used in conducting include:
a. Informal telephone calls, teleconferences.
b. Informal verbal inquiries, discussions, engineering consultations.
c. Working group meetings, IPT participation, technical/status briefings, progress reviews, technical information meetings, and formal and informal reviews.
d. Informal discussions.
2.4.3 Management Reviews and Reporting
Examples of management review and reporting activities that may be used in conducting surveillance include:
a. Formal, process, and progress reviews
b. Review of contract deliverables
c. Documentation of problems, issues and concerns
d. Data collection reporting
e. Review of task order deliverables, products, and documentation
3. SURVEILLANCE ACTIVITIES
3.1 General
There exist specific insight areas that the Government and the Contractor shall concentrate on during applicable stages of contract performance. Each of these insight areas and the Government’s expectations for these areas are described in Table 1.
Table 1. Surveillance Insight Areas
Area of Risk Identified Impact to Government Surveillance Team Activity
System Maintenance and Availability
System downtime or loss of functionality could result in loss of service to the user community
Review Contractor-developed maintenance plan for improvements. Review data and trouble data. Review corrective action performance.
Information Technology (IT) Security
Computer Security: Potential corruption and loss of data;
disruption of schedule
Annual review of IT security plans and contingency test results and controls.
Review compliance with policies, firewalls, protection software, vulnerability scans and external systems.
Configuration Management (CM) Documentation
Uncontrolled models, hardware, software, or documents could lead to erroneous results, incompatible interfaces, wasted resources, and/or mission failure
Periodically sample current documentation, and active management documents to verify compliance with the Contractor’s CM System and CM Plan.
Property Management, Control, and Maintenance
Loss of or damage to equipment;
potential schedule impact
Review Contractor property management techniques, compliance with policies, and record-keeping.
Safety Loss of work-time or equipment, with schedule or cost impact
Evaluate compliance with safety requirements.
Technical Documentation and Control
Loss of knowledge of processes and results
Periodically sample documents (review for accuracy) and ensure they are under CM control.
Process Controls Degradation of work products;
increase in safety risk; potential schedule impact
Periodically monitor, with assistance from DCMA as needed, the Contractor’s adherence to key processes and their internal audit schedules/results.
Continuous Risk Management Technical, cost, schedule, safety, and program success
Periodically ensure that the Contractor is performing a Continuous Risk Management program that identifies, analyzes, tracks, mitigates, controls and reports on related risks.
Quality Management Technical, cost, schedule, safety, and program success
Monitor the Contractor’s internal and external audits for compliance with the Contractor’s established Quality Management Systems, including CMMI® or ANSI/ISO/ASQ Q9001:2000 or AS 9100.
Area of Risk Identified Impact to Government Surveillance Team Activity Quality of Workmanship (End-Items)
a. Inability to meet commitments of scheduled deliverables
b. Additional cost and time resulting from rework, nonconforming, latent defects
a. Monitor and track schedules and delivery due dates.
b. Conduct/witness testing and inspections, when necessary. Ensure end-item deliverables conform prior to acceptance.
Schedule Services or products not provided in a timely manner can impact project schedule and cost
Monitor progress via management reviews and reporting.
Cost and Funding Cost Overrun:
a. Inability to implement contract requirements within negotiated costs may lead to erosion of technical performance, delay, or deletion of work
b. Reduction of work due to funding limitations/fluctuations
Monitor work performed based on milestone completion and schedule.
Organizational Conflicts of Interest (OCI) Avoidance
Potential restrictions, ineligible to perform, and/or unfair competitive advantage on future work
Monitor submittal, enforcement and compliance with the Contractor’s OCI Avoidance Plan.
Environmental Environmental damage to local and remote sites
Conduct periodic inspections to ensure compliance with environmental requirements.
Export Control Violation of International Traffic in Arms Regulations (ITAR)
Ensure the Contractor has Technical Assistance Agreements as required by the NASA Export Control Program.
3.2 Surveillance Team Activities
The surveillance team members will participate in review meetings, if applicable. They will provide support, as necessary, with the development and approval of technical requirements;
flow-down of requirements; and with design, development, and production and test activities.
They will also maintain insight into the Contractor’s compliance with relevant deliverables submitted under the contract and services performed. When the Government has concerns regarding Contractor performance, surveillance team members may conduct independent audits of the Contractor’s activities, processes, products, documentation and data, in order to provide assurance that the program is being implemented according to all requirements and specifications. These audits will normally be conducted with advance notification and coordinated with the Contractor. However, the Government reserves the right to conduct unscheduled audits when evidence indicates that Contractor performance is deficient.
The following selected surveillance team activities will be performed by various surveillance team members during applicable stages of contract performance:
3.2.1 Work Review and Performance Monitoring
The COR will perform the following functions to evaluate the Contractor's performance:
a. Reviews specific SOW areas to assure that work being performed and deliverables are in accordance with the technical requirements of the SOW and timely.
Reviews individual Task Orders to assure that each Task Order is technically within the scope of the contract and its personnel requirements and schedule are within the Contractor's capabilities. Reviews Contractor Task Plans to ensure that performance estimates are acceptable and that all milestones and deliverables have been identified.
b. Certifies the Contractor’s invoices for payment in accordance with NASA procedures.
c. In the event of a discrepancy in the Contractor's performance, the COR promptly notifies both the CO and the Contractor's Program Manager and arranges a meeting to rectify the situation.
3.2.2 Government Property Administration
The COR will carry out the following functions.
a. Review Contractor's request to purchase controlled property and facilities and make recommendations to the CO.
b. Validate that no property or facilities are being acquired without the CO's prior approval.
c. Validate that the Contractor is maintaining records for all offsite Government-Furnished Property (GFP).
3.2.3 Performance Monitoring
The COR will ensure that employer–employee relationships do not occur between Government and Contractor personnel. This is achieved if the following is adhered to:
a. Only the Contractor interviews prospective employees.
b. Only the Contractor’s Program Manager assigns work directly to the employees.
c. Only the Contractor approves timecards and absences.
d. Government personnel do not interfere with the Contractor regarding personnel and administrative prerogatives.
3.2.4 Safety
The responsibility for meeting all safety requirements rests with the Contractor. Surveillance team safety engineers and technical personnel will review Contractor-generated hazard analyses, safety compliance data packages or other safety-related documentation, as appropriate, to help ensure all safety requirements have been satisfied. Surveillance team personnel will also maintain insight into the Contractor’s safety activities and updates, as required by this contract.
| FOREWARD |
| TSIS-2 Spacecraft |
| 1.2 Scope |
| 1.3 Program Definition and Contract Description |
| 1.4 Guiding Directives |
| 1.5 References and Applicable Documents |
| 2.0 SURVEILLANCE STRATEGY AND APPROACH |
| 2.2 Surveillance Activity Limitations and Guidance |
| 2.2.2 Insight |
| 2.2.3 Oversight |
| 2.3 Surveillance Organization and Resources |
| 2.3.2 Surveillance Team |
| 2.3.2.3 TSIS-2 Spacecraft Contracting Officer’s Representative |
| 2.3.2.4 Defense Contract Management Agency (DCMA) |
| 2.3.2.5 Chief Safety and Mission Assurance Officer (CSO) |
| 2.3.2.6 TSIS-2 Spacecraft Contractor Quality Assurance |
| 2.4 Forms of Surveillance |
| 2.4.2 Communications |
| 2.4.3 Management Reviews and Reporting |
| 3. SURVEILLANCE ACTIVITIES |
| 3.2 Surveillance Team Activities |
| 3.2.1 Work Review and Performance Monitoring |
| 3.2.2 Government Property Administration |
| 3.2.3 Performance Monitoring |
| 3.2.4 Safety |
File details come from the government source that posted it. Updated .