RFP_80GSFC19R0033_Amd_001.pdf

PDF 239 KB Posted

Attached to
Supra Thermal Ion Sensor (STIS) Instrument Federal contract opportunity
Solicitation number
80GSFC19R0033
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document summarizes an amendment to a request for proposal for an ion sensor instrument. The National Aeronautics and Space Administration Goddard Space Flight Center is seeking proposals to design, develop, integrate, test, calibrate, and support the Supra Thermal Ion Sensor instrument as part of the Space Weather Follow On Mission satellite. The scope of work includes delivering one flight model instrument, one engineering development unit, flight harnesses, spares, and assembly of an additional flight model. Proposers must also supply ground support equipment, and support mission operations handover to the National Oceanic and Atmospheric Administration. Proposals are due 45 days following release of the request for proposal anticipated in fall 2019. The contract type will be cost-plus-incentive-fee. Small business subcontracting goals include 6% total small business, with targets for small disadvantaged, women-owned, HUBZone, veteran-owned, and service-disabled veteran-owned small businesses.

Amendment 1 RFP 80GSFC19R0033

View the file

Other files for this federal contract opportunity

Other files attached to Supra Thermal Ion Sensor (STIS) Instrument, newest first.
File Type Posted
STIS Questions and Responses 1-24-20.(additional).pdf PDF
STIS Questions and Responses 1-24-20.pdf PDF
STIS Questions and Responses 12-19-19.pdf PDF
Att B_Amend 003_changes identified_L1-STISSPEC-0002_Ver0.2.pdf PDF
Att C_Amend 003_changes identified_L1-STISCDRL-0003_Ver0.2 .pdf PDF
Att A_Amend 003_changes identified__L1-STISSOW-0001_Ver0.2.pdf PDF
STIS Questions and Responses 12-11-19.pdf PDF
STIS SF33 Amend 003.pdf PDF
STIS SF30 Amend 003.pdf PDF
Att B_Amend 003_L1-STISSPEC-0002_Ver0.2 12-6-19-sign.pdf PDF
Att A_Amend 003_-L1-STISSOW-0001_Ver0.2-signed.pdf PDF
Att C_Amend 003_L1-STISCDRL-0003_Ver0.2-signed.pdf PDF
STIS Amendment 003 continuation page.pdf PDF
STIS RFP Cover letter Amend 003.pdf PDF
STIS_SF30_Amend_002_(003).pdf PDF
STIS_Questions_and_Responses_Amendment_002_Final.pdf PDF
STIS_SF33_Amendment_002_Final.pdf PDF
STIS_Sections_L_and_M_Amendment_002_Final.pdf PDF
Amd_1_SF30.pdf PDF
SF33.pdf PDF
Encl_1_STIS_QASP.pdf PDF
Att_E_533_instructions.pdf PDF
Att_A_422-L1-STISSOW-0001_Ver0.1_-_Signed.pdf PDF
1RFP_80GSFC19R0033.pdf PDF
Att_K_IT_Security_Applicable_Documents_List.pdf PDF
Att_C_422-L1-STISCDRL-0003_Ver0.1(1)_-_Signed.pdf PDF
Exhibit_1_SB_SC_Goals.pdf PDF
Att_B_422-L1-STISSPEC-0002_Ver0.1_-_Signed.pdf PDF
RFP_Cover_Letter.pdf PDF
Att_D_422-L1-IMAR-0004_Ver0.1_-_Signed.pdf PDF
Encl_2_IT_Security_Management_Plan_Template.pdf PDF
Encl_3_PastPerfQues.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 80GSFC19R0033

Amendment 001

1. RFP Page 10 is hereby replaced with:

SECTION E – INSPECTION AND ACCEPTANCE

E.1 SECTION E – CLAUSES INCORPORATED BY REFERENCE

52.246-5 INSPECTION OF SERVICES—COST-REIMBURSEMENT (APR 1984)

52.246-8 INSPECTION OF RESEARCH AND DEVELOPMENT – COST

REIMBURSEMENT (MAY 2001)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014) [(a)

(1) Instrument Mission Assurance Requirements, 422-L1-IMAR-0004, September

October 2019 (2) Contractor Quality Assurance Plan, Attachment I, November 2019]

(End of clause)

E.2 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT (APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:

(1) Via mail and marked “Advance Copy”, one copy each to the Contracting Officer, the Contracting Officer’s Representative (if designated in the contract), and to the cognizant Administrative Contracting Officer, if any.

(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope

“CONTAINS DD FORM 250”. This must arrive prior to the shipment.

(3) With shipment in waterproof envelope (one copy) for the consignee.

(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) or GSFC/Wallops Flight Facility (Wallops) central receiving areas, then one copy of the

DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt or GSFC/WFF Wallops:

Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD

20771.

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement

1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD

Form 250, as additional information, the quantity of packages and the package

2. RFP Page 60 is hereby replaced with:

SECTION J – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)

The following documents are attached hereto and made a part of this contract:

Attachment

Description

Date

No. of

Pages

(Including

Cover

Page)

A Statement of Work (SOW) September 2019

October 2019

B Requirements Specification September 2019

October 2019

C Contract Deliverable Requirements List (CDRL) September 2019

October 2019

D Instrument Mission Assurance Requirements

(IMAR)

September 2019

October 2019

E

Financial Management Reporting Requirements

June 2014

F

Small Business Subcontracting Plan

To Be Submitted in Proposal

TBS

G

Organizational Conflicts of Interest (OCI)

Avoidance Plan

To Be Submitted

30 days after

Contract

Effective Date

H

Information Technology (IT) Security

Management Plan

To Be Submitted

30 Days After

Contract

Effective Date

I Quality Assurance Plan To Be Submitted in Proposal

TBS

J Contractor Proposed Enhancements To Be Submitted in Proposal

K

Information Technology (IT) Security Applicable

Documents List (ADL)

June 2016

(End of clause)

(End of Section J)

3. RFP Page 105 is hereby replaced with:

2.5 ALGORITHM AND CALIBRATION COEFFICIENT DEVELOPMENT - The Government will evaluate the completeness, effectiveness and reasonableness of Offeror’s strategy/approach to developing and verifying sensor processing algorithms and calibration factors, especially as described in CDRLs 64-67, Calibration Program Plan, Calibration Databases, Ground

Processing Algorithm Development, and Algorithms Test and Validation Plan, respectively.

2.6 CLASS C WITH 5-YEAR OPERATIONAL LIFE –The Offeror’s strategy/approach to developing and delivering the STIS instrument to NASA Payload Risk Classification C for a 5-year mission operational life at the Lagrange-1 orbit will be evaluated the reasonableness and soundness of the approach to system reliability assumptions and assessments, including but not limited to scope identified in CDRL 85, Reliability Predictions and CDRL 87, Limited Life Items

List. The Government will evaluate the risk, soundness of logic, and robustness of the resulting proposed design approach to parts/components selection, redundancy and cross-strapping methods, including identification of which components and subsystems are redundant and which are cross-strapped.

2.7 SPEC COMPLIANCE - The proposal’s compliance with each defined technical requirement in the SPEC, Attachment B, and the manner and degree to which each requirement is met or exceeded will be evaluated. For any requirements exceeded, the Government will evaluate the extent of the performance benefit. For any non-compliances or non-compliances, the

Government will evaluate its impact on overall performance. If the non-compliance or non-conformance is determined to have no impact or an insubstantial impact on overall instrument performance, the Government, in its sole discretion, may accept a proposal containing such minor non-compliance(s) or minor non-comformance(s), though minor non-compliance(s)/non-conformance(s) may be the subject of an evaluation finding. The Government will use the submitted SPEC Compliance Matrix, in conjunction with the offeror’s mission suitability proposal to make determinations of compliance.

2.7 SPEC COMPLIANCE - The proposal’s compliance with each defined technical requirement in the SPEC, Attachment B, and the manner and degree to which each requirement is met or exceeded will be evaluated. The Government will consider the degree to which minor non-conformances or non-compliances impact overall performance and may accept minor non-conformances or non-compliances. The Government will use the submitted SPEC Compliance

Matrix, in conjunction with the offeror’s mission suitability proposal to make determinations of compliance.

2.8 QUALITY ASSURANCE PLAN - The QAP will be evaluated for effectiveness in ensuring quality services throughout the duration of the contract, specifically, the effectiveness of procedure(s) identified for continually monitoring, surveilling, identifying and correcting deficiencies, quality measurements and quality assurance methods.

File details come from the government source that posted it. Updated .