Jb_Att_2_PESS_II_PP_Relevancy_Matrix.pdf

PDF 130 KB Posted

Attached to
Project and Engineering Support Services II (PESS II) Federal contract opportunity
Solicitation number
80ARC019R0003
Issued by
National Aeronautics and Space Administration Ames Research Center

About this file

Past Performance Relevancy Matrix

View the file

Other files for this federal contract opportunity

Other files attached to Project and Engineering Support Services II (PESS II), newest first.
File Type Posted
80ARC019R0003P00004_-_SF30.pdf PDF
Jb_Att_3_PESS_II_Cost_Template_Workbook_-_Final.xlsx XLSX spreadsheet
Ja_Att_1_PESS_II_SOW_-_final.pdf PDF
PESS_II_RFP_80ARC019R0003_Q&A__1_-_final.pdf PDF
Jb_Att_1_PESS_II_Cost_Staffing_and_Position_Descriptions_Qualifications_-_final.pdf PDF
80ARC019R0003P00003-_final.pdf PDF
80ARC019R0003P00001_-_SF30.pdf PDF
80ARC019R00030001.pdf PDF
https://www.fbo.gov/spg/NASA/ARC/OPDC20220/80ARC019R0003/listing.html HTML file
Jb_Att_8_PESS_II_Past_Performance_Cover_Letter_and_Questionnaire.pdf PDF
Jb_Att_10_PESS_II_Summary_of_Key_Terms.pdf PDF
Ja_Att_8_PESS_II_GFCS.pdf PDF
Jb_Att_4_PESS_II_Form_CASB-CMF.pdf PDF
Jb_Att_5_PESS_II_DD_1861.pdf PDF
Jb_Att_11_PESS_II_-_EPCRA.pdf PDF
Ja_Att_2_PESS_II_DOL_WD_2015-5641_rev_8.pdf PDF
Jb_Att_1_PESS_II_Cost_Staffing_and_Position_Descriptions_Qualifications.pdf PDF
Ja_Att_4_PESS_II_Government_Property_List.pdf PDF
Jb_Att_9_PESS_II_Sample_Work_Packages.pdf PDF
PESS_II_RFP_80ARC019R0003.pdf PDF
Ja Att 1 PESS II SOW.pdf PDF
Ja_Att_3_-_DRL.pdf PDF
Jb_Att_3_PESS_II_Cost_Template_Workbook.xlsx XLSX spreadsheet
Jb_Att_6_PESS_II_Preaward_Survey_of_Prospective_Contractor_Accounting_System_Che.._.pdf PDF
Jb_Att_7_PESS_II_NF533M.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80ARC019R0003 PESS II Jb Att 2

The Offeror and Major Subcontractors shall complete the below “Table: Statement of Work Relevance” to include all of the relevant contracts for the Prime and Major Subcontractors, as identified in Section L.2(b)(1). Instructions for completing the “Table: Statement of Work Relevance” are as follows:

• Do not enter any information in the gray cells. Delete the example rows before submission.

• In column 1, replace “{Offeror’s Name}” with the name of the Offeror. In the rows available below “Offeror:”, enter the contract number for each of the Offeror’s relevant contracts, and enter “P” or “S” in column 2 to indicate whether the Offeror was a Prime Contractor or a Subcontractor for that particular contract.

• Following the example given in the table, the Offeror shall mark “X” if the works performed under the contract are relevant to each of the SOW technical areas listed in columns 3 through 5, and leave blank if no work performed under the contract is relevant to the SOW technical areas listed in columns 3 through 5.

• Similarly, in column 1, replace “{Major Subcontractor 1’s Name}” with the name of a Major

Subcontractor. In the rows available below “Major Subcontractor 1:”, enter the contract number for each of the Major Subcontractor 1’s relevant contracts, and enter “P” or “S” in column 2 to indicate whether the Major Subcontractor was a Prime Contractor or a Subcontractor for that particular contract.

• Following the example given in the table, mark “X” if the works performed under the contract that are relevant to each of the SOW technical areas listed in columns 3 through 10, and leave blank if no work performed under the contract is relevant to the SOW technical areas listed in columns 3 through 5.

• Continue for each of the Major Subcontractors using the rows for “Major Subcontractor 2:”

and adding rows (“Major Subcontractor 3:”, etc.) as necessary to include additional Major Subcontractors.

File details come from the government source that posted it.