Jb_Att_2_PESS_II_PP_Relevancy_Matrix.pdf
PDF 130 KB Posted
- Attached to
- Project and Engineering Support Services II (PESS II) Federal contract opportunity
- Solicitation number
- 80ARC019R0003
About this file
Past Performance Relevancy Matrix
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80ARC019R0003 PESS II Jb Att 2
The Offeror and Major Subcontractors shall complete the below “Table: Statement of Work Relevance” to include all of the relevant contracts for the Prime and Major Subcontractors, as identified in Section L.2(b)(1). Instructions for completing the “Table: Statement of Work Relevance” are as follows:
• Do not enter any information in the gray cells. Delete the example rows before submission.
• In column 1, replace “{Offeror’s Name}” with the name of the Offeror. In the rows available below “Offeror:”, enter the contract number for each of the Offeror’s relevant contracts, and enter “P” or “S” in column 2 to indicate whether the Offeror was a Prime Contractor or a Subcontractor for that particular contract.
• Following the example given in the table, the Offeror shall mark “X” if the works performed under the contract are relevant to each of the SOW technical areas listed in columns 3 through 5, and leave blank if no work performed under the contract is relevant to the SOW technical areas listed in columns 3 through 5.
• Similarly, in column 1, replace “{Major Subcontractor 1’s Name}” with the name of a Major
Subcontractor. In the rows available below “Major Subcontractor 1:”, enter the contract number for each of the Major Subcontractor 1’s relevant contracts, and enter “P” or “S” in column 2 to indicate whether the Major Subcontractor was a Prime Contractor or a Subcontractor for that particular contract.
• Following the example given in the table, mark “X” if the works performed under the contract that are relevant to each of the SOW technical areas listed in columns 3 through 10, and leave blank if no work performed under the contract is relevant to the SOW technical areas listed in columns 3 through 5.
• Continue for each of the Major Subcontractors using the rows for “Major Subcontractor 2:”
and adding rows (“Major Subcontractor 3:”, etc.) as necessary to include additional Major Subcontractors.
File details come from the government source that posted it.