Exhibit 1 Proposing Entity: _________________________________________
SUMMARY OF PROPOSED PRICE
| CLIN | Description | Estimated Cost | Fixed Fee | Total Cost/Price |
| 0001 | Phase-in (from Exhibit 11) | N/A | N/A | $0 |
| BASE PERIOD 1 | | | |
| 0002 | PESS II Core Requirements; Contract Year 1 (from Exhibit 2) | $ 4,200,000 | - | $ 4,200,000 |
| 0002 | PESS II Core Requirements; Contract Year 2 (from Exhibit 2) | $ 4,200,000 | - | $ 4,200,000 |
| OPTION PERIOD 1 | | | |
| TBD | PESS II Core Requirements; Contract Year 3 (from Exhibit 2) | $ 4,200,000 | - | $ 4,200,000 |
| OPTION PERIOD 2 | | | |
| TBD | PESS II Core Requirements; Contract Year 4 (from Exhibit 2) | $ 4,200,000 | - | $ 4,200,000 |
| OPTION PERIOD 3 | | | |
| TBD | PESS II Core Requirements; Contract Year 5 (from Exhibit 2) | $ 4,200,000 | - | $ 4,200,000 |
| Total Evaluation Price for Selection Purposes* | | | $21,000,000 |
* A cost/price evaluation will be conducted in accordance with FAR 15.305(a)(1) and NFS 1815.305(a)(1)(B).
Exhibit 2 Summary of Elements of Cost - PESS II Core Requirements (Prime Offeror)
Proposing Entity: _________________________________________
| Base Period | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Grand |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Total |
| Productive Labor Hours | | | | | | |
| Prime | - | - | - | - | - | - |
| Subcontractor #1 | - | - | - | - | - | - |
| Subcontractor #2 | - | - | - | - | - | - |
| Total Productive Labor Hours | - | - | - | - | - | - |
| Direct Labor Costs (Prime only) | $ - | $ - | $ - | $ - | $ - | $ - |
| Fringe Benefits on Prime Labor | - | - | - | - | - | - |
| Overhead on Prime Labor | - | - | - | - | - | - |
| Subcontractor Total Cost and Fee: | | | | | | |
| Subcontractor #1 | - | - | - | - | - | - |
| Subcontractor #2 | - | - | - | - | - | - |
| Other Direct Costs: | | | | | | |
| Hardware/Software/Maintenance | 4,000,000 | 4,000,000 | 4,000,000 | 4,000,000 | 4,000,000 | 20,000,000 |
| Travel/Training/Other | 200,000 | 200,000 | 200,000 | 200,000 | 200,000 | 1,000,000 |
| Total Other Direct Costs | 4,200,000 | 4,200,000 | 4,200,000 | 4,200,000 | 4,200,000 | 21,000,000 |
| Material and/or Subcontract Handling | - | - | - | - | - | - |
| Subtotal | 4,200,000 | 4,200,000 | 4,200,000 | 4,200,000 | 4,200,000 | 21,000,000 |
| G&A Expense | - | - | - | - | - | - |
| Total Cost | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 21,000,000 |
| Fixed Fee | - | - | - | - | - | - |
| Facilities Capital Cost of Money | - | - | - | - | - | - |
| Total Cost Plus Fixed Fee | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 4,200,000 | $ 21,000,000 |
Exhibit 2a Summary of Elements of Cost - PESS II Core Requirements (Major Subcontractors)
Proposing Entity: _________________________________________
| Base Period | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Grand |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | Total |
Productive Labor Hours - - - - - -
| Direct Labor Costs | $ - | $ - | $ - | $ - | $ - | $ - |
| Fringe Benefits | - | - | - | - | - | - |
| Overhead | - | - | - | - | - | - |
| Other Direct Costs | - | - | - | - | - | - |
| Material and/or Subcontract Handling | - | - | - | - | - | - |
| Subtotal | - | - | - | - | - | - |
| G&A Expense | - | - | - | - | - | - |
| Total Cost | $ - | $ - | $ - | $ - | $ - | $ - |
| Fee or Profit | - | - | - | - | - | - |
| Facilities Capital Cost of Money | - | - | - | - | - | - |
| Total Cost and Fee/Profit | $ - | $ - | $ - | $ - | $ - | $ - |
Exhibit 3 Summary of Proposed Direct Labor Rates
| [ ] Prime Contractor: _____________________________________ |
| [ ] Major Subcontractor: __________________________________ |
| | Proposed Direct Labor Rates | | | | | | |
| | Base Period | | Opt Period 1 | Opt Period 2 | Opt Period 3 | | |
| NASA Standard Labor Category | Offeror's Category | Contract Yr1 | Contract Yr2 | Contract Yr3 | Contract Yr4 | Contract Yr5 | Source | Staffing |
| Example: | | | | | | | | |
| Proposed Escalation Percentage (%) | | | 2.9% | 2.9% | 3.0% | 3.0% | Actual | Incumbent |
| | | | | | | Salary Survey | Offeror's employee |
| Senior Aerospace Engineer | Engineer IV | $52.00 | $53.51 | $55.06 | $56.71 | $58.41 | DOL2005-2516 | New hire |
Proposed Escalation Percentage (%)
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 |
| Offeror shall remove examples when submitting its proposal. |
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
Exhibit 4 Summary of Key Personnel Direct Labor Rates
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
| | | Actual Rates Projected | | | | | |
| Labor Category | Names of Key Personnel | Current Rates* | Phase-in Period | Base Period 1 | Base Period 2 | Option Period 1 | Option Period 2 | Option Period 3 |
* Date of current rates is payroll of:
Exhibit 5
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
DIRECT LABOR COST SUMMARY - PESS II CORE REQUIREMENTS
| Labor Category | Base Period; Contract Yr1 | | | Base Period; Contract Yr2 | | | Option Period 1; Contract Yr3 | | |
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| | | $0 | | | $0 | | | $0 |
| Total Labor Hours and Costs | - 0 | | $0 | - 0 | | $0 | - 0 | | $0 |
| [ ] Prime Contractor: |
| [ ] Major Subcontractor: |
DIRECT LABOR COST SUMMARY - PESS II CORE REQUIREMENTS
| Labor Category | Option Period 2; Contract Yr4 | | | Option Period 3; Contract Yr5 | | |
| Total Labor Hours | Labor Rate | Total Labor Cost | Total Labor Hours | Labor Rate | Total Labor Cost |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| | | $0 | | | $0 |
| Total Labor Hours and Costs | - 0 | | $0 | - 0 | | $0 |
Exhibit 6 Summary of Indirect Cost Rates
| [ ] Prime Contractor: __________________________________ |
| [ ] Major Subcontractor: __________________________________ |
| Fringe Benefits* | Overhead** | G&A |
| Example: | | | |
| Portion of Contractor FY 13 From: _11/1/12_ to _4/30/13_ | 46.00% | 4.50% | 7.00% |
| Portion of Contractor FY 14 From: _5/1/13_ to _10/31/13 | 44.00% | 3.50% | 5.00% |
| Base Period Weighted Average | 45.00% | 4.00% | 6.00% |
| Phase-in Period: |
| Contractor FY Ending: ____________ |
| Base Period, Contract Year 1: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Base Period Average |
| Base Period, Contract Year 2: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 1 Average |
| Option Period 1, Contract Year 3: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 2 Average |
| Option Period 2, Contract Year 4: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 3 Average |
| Option Period 3, Contract Year 5: |
| Portion of Contractor FY __ From: ________ to ________ |
| Portion of Contractor FY __ From: ________ to ________ |
| Option Period 4 Average |
| * Disregard if it is your normal accounting practice to include fringe benefits with overhead. |
| ** If you plan to propose more than one overhead rate (e.g., Contractor Site OH and Customer Site OH), modify this |
| exhibit by adding the necessary number of columns to display all proposed overhead rates. |
| Offeror shall remove examples when submitting its proposal. |
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
Exhibit 7 Overhead and/or Fringe Benefits (Composition of Burden Pool)
| [ ] Prime Contractor: __________________________________ | |
| [ ] Major Subcontractor: _________________________________ | Overhead or Service Center Pool* = ___________________ |
| Base of Application = __________________________ |
* Specify Type of Overhead Burden: Fringe Benefits, Labor, Onsite, Offsite, Engineering, Procurement, Service Center(s), etc.
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
| Actual | | | Forecast | | | | |
| Prior Yr 3 | Prior Year 2 | Prior Yr 1 | | | | | |
| Cost Elements within | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor |
| the Overhead Burden Pool | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year |
| 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx |
| Payroll Taxes |
| FICA (Social Security) |
| HIT (Medicare) |
| FUI (Federal Unemployment) |
| SUI (State Unemployment) |
| WC (Workers Comp) |
| Fringes: |
| Retirement |
| Health/Life Insurance |
| Paid Leave |
| Other |
| Other (Identify) |
| Facilities |
| Depreciation |
| Total Overhead Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Application Base ($) | | | | | | | | |
| Contractor FY Rate (%) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
Exhibit 8 General and Administrative Expense (G&A)
| [ ] Prime Contractor: __________________________________ | |
| [ ] Major Subcontractor: _________________________________ | Base of Application = __________________________ |
OFFEROR'S FISCAL YEAR BEGINS ____________ AND ENDS ____________.
| Actual | | | Forecast | | | | |
| Prior Yr 3 | Prior Year 2 | Prior Yr 1 | | | | | |
| Cost Elements within | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor | Contractor |
| the Overhead Burden Pool | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year | Fiscal Year |
| 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx | 20xx |
Labor: (Identify)
Labor Related Cost: (Taxes & Fringes Etc.)
| B&P |
| IR&D |
| Corporate Allocations: |
| Other (Specify): |
| Facilities |
| Depreciation |
| Total G&A Expenses | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Distribution Base Dollars: | | | | | | | | |
| Existing Business Base | | | | | | | | |
| This Contract Base | | | | | | | | |
| Forecasted Business Base | | | | | | | | |
| Total Distribution Base $ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Calculated G&A Rates (%) | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
Exhibit 9 Prime Contractor:
MINOR SUBCONTRACTORS
| Minor Subcontractor | NASA Standard Labor Category | Base Period | | | | | | Option Period 1 | | | Option Period 2 | | | Option Period 3 | | |
| | Contract Year 1 | | | Contract Year 2 | | | Contract Year 3 | | | Contract Year 4 | | | Contract Year 5 | | |
| | Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total | Hours | SFBR | Total |
| Examples: | | | | | | | | | | | | | | | | |
| XYZ Company | Engineer 3 | 1,395 | $85.00 | $118,575 | 1,395 | $87.55 | $120,947 | 1,395 | $90.18 | $123,365 | 1,395 | $92.89 | $125,833 | 1,395 | $95.68 | $128,349 |
| Technician 2 | 1,395 | $56.00 | $78,120 | 1,395 | $57.68 | $79,682 | 1,395 | $59.41 | $81,276 | 1,395 | $61.19 | $82,902 | 1,395 | $63.03 | $84,560 |
| Safety Manager | 930 | $79.00 | $73,470 | 450 | $81.37 | $36,261 | - 0 | $83.81 | $0 | - 0 | $86.32 | $0 | - 0 | $88.91 | $0 |
| Technician 3 | 3,720 | $58.00 | $215,760 | 1,500 | $59.74 | $88,740 | - 0 | $61.53 | $0 | - 0 | $63.38 | $0 | - 0 | $65.28 | $212,909 |
| Total XYZ: | 7,440 | | $485,925 | 4,740 | | $325,630 | 2,790 | | $204,641 | 2,790 | | $208,734 | 2,790 | | $425,818 |
| ABC Tool & Die | Engineer 1 | 1,860 | $44.00 | $81,840 | 1,860 | $45.32 | $84,295 | 1,860 | $46.68 | $86,825 | 1,860 | $48.08 | $89,429 | 1,860 | $49.52 | $92,107 |
| Technician 3 | 3,720 | $62.00 | $230,640 | 1,395 | $63.86 | $89,085 | - 0 | $65.78 | $0 | - 0 | $67.75 | $0 | - 0 | $69.78 | $0 |
| Safety Manager | 930 | $71.00 | $66,030 | 450 | $73.13 | $32,909 | - 0 | $75.32 | $0 | - 0 | $77.58 | $0 | - 0 | $79.91 | $0 |
| Total ABC: | 6,510 | | $378,510 | 3,705 | | $206,289 | 1,860 | | $86,825 | 1,860 | | $89,429 | 1,860 | | $92,107 |
| | | | | | | | | | $173,650 | | | | | | |
| Offeror shall remove examples when submitting its proposal. |
| The example is provided to demonstrate formatting and how the data is to be submitted. The data in the example is not real and should not be interpreted as such. |
Exhibit 10 Incumbency Assumptions
| [ ] Prime Contractor: ________________________ |
| [ ] Major Subcontractor: _______________________ |
This exhibit provides the Government visibility into the Offeror's intentions regarding the hiring of incumbent contractor employees.
State the percentage of incumbents intended/expected to be retained: ________
| Labor Rates | The Government understands that a non-incumbent Offeror may only be able to estimate the salary cost of current incumbents; however, the Government must evaluate the Offeror’s intentions regarding pay for these employees if retained. |
| Notwithstanding the rates estimated and proposed by the Offeror, upon receiving contract award, do you intend to pay retained incumbents at their current salaries/wages? Offerors shall select only one of the options below. |
| [ ] Yes. No further response required. |
| [ ] No. If you check this box, explain (in the space below and use additional pages if necessary) what salaries/wages you intend to offer to incumbents and how this will allow you to achieve the intended/expected incumbent retention percentage stated above. |
| Length of Service | Do you intend to recognize incumbent employees' service time under predecessor contracts, in the performance of similar work, for purposes of fringe benefits computations (such as the amount of paid-time-off received)? Offerors shall select only one of the options below. |
| [ ] Yes. No further response required. |
| [ ] No. If you check this box, explain (in the space below and use additional pages if necessary) your policy regarding length of service of incumbents, as it relates to fringe benefits computations (such as the amount of paid-time-off received), and how this will allow you to achieve the intended/expected incumbent retention percentage stated above. |
Exhibit 11
| Cost Element | Hours | Rate | Cost |
| Prime Offeror Direct Labor (DL): | | | |
| Skill mix: (identify labor category) | | | |
| *Example: Technician 1 | 100 | $ 10.00 | $1,000 |
| 1. | | | $0 |
| 2. | | | |
| 3. | | | |
| 4. | | | |
| Total Prime Offeror Direct Labor Cost | - 0 | | $0 |
| Prime Offeror Fringe and/or Overhead on Labor: | | |
| *Example: Overhead | 10% | $100 |
| 1. | | |
| 2. | | |
| Total Fringe/Overhead | | $0 |
| Major Subcontractor Total Cost (list) | |
| 1. | |
| 2. | |
| 3. | |
| 4. | |
| Total Major Subcontractor Cost | $0 |
| Minor Subcontractor Total Cost | |
| 1. | |
| 2. | |
| 3. | |
| Total Minor Subcontractor Costs | $0 |
| Prime Offeror Non-Labor Resources (NLR): | |
| Material/Supplies/Equipment | |
| Travel/Training | |
| Service Agreements, Outsourcing & Consultant Fees | |
| Other | |
| Total Non-Labor Cost | $0 |
| Subtotal DL$, Major & Minor Subs$, OH$ & NLR$ | $0 |
| Prime Offeror Total G&A Cost | |
| Subtotal Estimated Cost | $0 |
| Prime Offeror Profit | $0 |
| Prime Offeror Facilities Capital Cost of Money | |
Total Phase-in Firm Fixed Price $0
| *Remove example from official submission, it is provided to demonstrate formatting and how the |
| data is to be submitted. The data in the example is not real and should not be interpreted as such. |
Exhibit 12 Schedule of Subcontracts
[ ] Prime Contractor: ______________________________________
Description of Work:
| Number of quotes solicted/received | | | | |
| Subcontractor selected: | Subcontract (1) Name and Address | Subcontract (2) Name and Address | Subcontract (3) Name and Address | Subcontract (4) Name and Address |
Basis of Selection:*
Type of Subcontract:**
| Cost | | | | |
| Fee/Profit | | | | |
| Total Amount Proposed | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Affiliation with Prime:*** | | | | |
Cost/Price Analysis Performed by Prime:****
| * Lowest price, teaming partner, technical qualifications, etc. |
| ** FFP, CPAF, CPFF, T&M, etc. |
| *** Subcontractor, subsidiary, interdivisional, etc. |
| **** FAR 15.404-3(b) requires that contractors conduct appropriate cost or price analyses to establish the reasonableness of proposed subcontract prices |
| and include the results of these analyses in the price proposal. If response above is "No", explain why cost or price analyis was not performed and how |
| the Offeror determined that the proposed subcontract price was reasonable. |