8-RFP 26-006 Turf bid Form.pdf

PDF 144 KB Posted

Attached to
RFP26-006 Pivot Synthetic Turf or equivalent or better: -5 locations
Solicitation number
RFP26-006
Issued by
Utah

About this file

This is a bid form for RFP 26-006 issued by Ogden School District (OSD) in Utah for synthetic turf field replacement and installation at five locations. The project encompasses replacement of existing artificial turf fields at three locations—Spence Eccles OCSC Field #1, Ogden High School, and Ben Lomond High School—and conversion of natural grass to artificial turf at two elementary school playgrounds: New Bridge Elementary School and Polk Elementary School. Work specifications vary by site but generally include mobilization and general conditions, installation of new synthetic turf fields (100 oz with pad for primary fields), conversion turf (90 oz without pad), and site-specific amenities such as netting systems, soccer goals, track resurfacing, sand fill for jump pits, long jump covers, gravel landscaping, batting cage turf, digital play clocks, playground turf, and maintenance equipment. The bid form requires contractors to acknowledge any applicable addenda and provides a designated project contingency of $100,000.00.

Contractors must submit itemized pricing for each work component at each school location and provide a total contract bid amount for all five projects combined. The bid form is generic and places full responsibility on the contractor to construct each site according to all design specifications contained in the contract documents. Bidders must provide signature of preparer, printed name, organization, email address, and phone number. The form includes line items for listing any discounts offered and acknowledging receipt of addenda, with specific reference to Addendum #1 and Addendum #2. No specific response deadline, award date, or contract term information is provided in this bid form document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

OCSC FIELD #1

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Mobilization and General Conditions 2 New Synthetic Turf Field 100 oz - including pad 3 New netting system (north & south) 4 Synthetic Turf 90 oz - all conversion areas (no pad) 5 New Soccer Goals

TOTAL CONTRACT BID AMOUNT ($)

SIGNATURE OF PREPARER:

Ogden High School

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Mobilization and General Conditions 2 New Synthetic Turf Field 100 oz - including pad 3 Synthetic Turf 90 oz - outlying areas (no pad) 4 Sand Fill (shot & long jump pits) 5 Long Jump Cover 6 Track Resurface 7 Gravel Landscape (track perimetter) 8 Baseball Batting Cage Turf - 90 oz 9 Digital Play Clocks

Ben Lomond High School

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Mobilization and General Conditions 2 New Synthetic Turf Field 100 oz - including pad 4 Sand Fill ( long jump pits) 5 Long Jump Covers 6 Track Resurface 7 Gravel Landscape (track perimetter) 8 Digital Play Clocks

Polk Elementary School

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Mobilization and General Conditions 2 New Synthetic Turf Field 100 oz - including pad

New Bridge Elementary School

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Mobilization and General Conditions 2 New Synthetic Turf Field 100 oz - including pad 3 New Playground Turf 90 oz - including pad

Ogden School District Grand Total

NOTE: CONTRACTOR AGREES TO PERFOMR ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLING PRICES. BID FORM IS GENERIC AND CONTRACTOR SHALL BE RESPONSIBLE TO CONSTRUCT FULLY

DESIGNED SITE PER DOCUMENTS.

# WORK DESCIPTION CONSTRUCTION AMOUNT

1 Spence Eccles OCSC Field #1 2 Ogden High School 3 Ben Lomond High School 4 New Bridge Elementary School 5 Polk Elementary School 6 Maintenance Equipment (See specs) 7 Project Contingency $100,000.00 8 List any discounts:

Initial acknowldegment of any addenda if applicable:

Addendum #1

Addendum #2

TOTAL CONTRACT BID AMOUNT FOR ALL 5 PROJECTS ($)

SIGNATURE OF PREPARER:

PRINTED NAME

ORGANIZATION

EMAIL ADDRESS

PHONE NUMBER

File details come from the government source that posted it. Updated .