8-LNAA-CO-26-002 Part VII, Bid Book.pdf
PDF 379 KB Posted
- Attached to
- Cooling Tower Replacement
- Solicitation number
- US.258403
- Issued by
- Lehigh County, Pennsylvania
About this file
This is a Bid Book (Part VII) for a cooling tower replacement project issued by the Lehigh-Northampton Airport Authority at Lehigh Valley International Airport in Allentown, Pennsylvania. The project involves three separate contracts: General Construction, Mechanical Construction, and Electrical Construction. Bidders must submit sealed proposals by 2:00 p.m. on Friday, November 13, 2026, via www.PennBid.net, with public opening of proposals scheduled for the same date and time at the Airport Authority Boardroom located on the 2nd Floor, Main Terminal, 3311 Airport Road, Allentown, PA 18109. A non-mandatory virtual pre-bid meeting will be held at 1:00 p.m. on Tuesday, October 20, 2026, via Microsoft Teams. Questions regarding the Request for Proposals must be submitted by 4:00 p.m. on Tuesday, October 27, 2026, via www.PennBid.net. All proposals shall remain valid for one hundred twenty (120) calendar days from the bid opening date, and the Authority reserves the right to accept or reject any and all proposals or award the contract as deemed in its best interest.
Bidders must provide bid security in the amount of 10 percent of the Total Base Bid and submit a Schedule of Values with unit prices for each contract. The Bid Book requires completion and submission of multiple forms including Signature to Bids, Affirmation Regarding Collusion, Affirmation Regarding Bribery Convictions, Contractor's Certification of Eligibility, Bidder's List Collection Form, Subcontractor's List Collection Form, Bidder and Subcontractor Utilization Summary Form, Small Business Participation Utilization Plan, and Small Business Participation Letter of Intent Forms. The Authority requests a self-performance goal of 50 percent for the bidder. Bidders must hold a valid State of Pennsylvania Construction Firm License and provide their Federal Employer Identification Number or Social Security Number. Upon acceptance of a proposal, the contractor must execute the formal contract within ten (10) calendar days. All documents, materials, or data developed as a result of this contract become the property of the Authority, which has the right to use and reproduce any information, including confidential information, for its own purposes or for reporting to Federal agencies.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART VII: BID BOOK
LNAA-CO-26-002
Cooling Tower Replacement
ALL ENCLOSED FORMS MUST BE COMPLETED
AND SUBMITTED WITH THE BID PROPOSAL
LEHIGH-NORTHAMPTON AIRPORT AUTHORITY
LEHIGH VALLEY INTERNATIONAL AIRPORT
4th Edition July, 2026
LNAA-CO-26-002 TECHNICAL PROVISIONS
Cooling Tower Replacement PART VII: BID BOOK at Lehigh Valley International Airport 10/13/2026
BF.2
THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
at Lehigh Valley International Airport 10/13/2026
BF.3
Contents
Signature to Bids .............................................................................................. BF.5-BF.8 Affirmation Regarding Collusion ................................................................................ BF.9 Affirmation Regarding Bribery Convictions ..............................................................BF.10 Contractor’s Certification of Eligibility.......................................................................BF.11 Bidder’s List Collection Form ...................................................................................BF.12 Subcontractor’s List Collection Form ..................................................... BF.13 thru BF.15 Bidder & Subcontractor Utilization Summary Form ............................... BF.16 thru BF.17
BF.4
at Lehigh Valley International Airport 10/13/2026
BF.5
SIGNATURE TO BIDS
NOTE: Bidders shall use this page as a cover page when submitting his/her bid.
Each bid must show the full business address and telephone number of the Bidder and be signed by the person legally authorized to sign contracts. All correspondence concerning the bid and contract, including Notice of Award, copy of contract and purchase order, will be provided via electronic correspondence to the authorized individual shown on the bid forms, in the absence of written instructions from the Bidder to the contrary. Bids by partnerships must be signed in the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and designation of the person signing, who shall also state the names of the individuals composing the partnership. Bids by corporations must be signed with the name of the corporation, followed by the signature and designation of the officer having authority to sign. When requested, satisfactory evidence of authority of the officer signing on behalf of the corporation shall be furnished. Anyone signing the bid as agent shall file satisfactory evidence of his/her authority to do so.
All documents, materials, or data developed as a result of this contract are the Authority’s property. The Authority has the right to use and reproduce any documents, materials, and data, including confidential information, used in or developed as a result of this contract. The Authority may use this information for its own purposes or use it for reporting to Federal agencies. The Bidder warrants that it has title to or right of use of all documents, materials, or data used or developed in connection with this contract. The Bidder must keep confidential all documents, materials, and data prepared or developed by the Bidder or supplied by the Authority. All erasures and/or changes shall be initialed by the individual making modifications to the proposal.
BIDDER MUST SIGN THE APPLICABLE PAGES WITHIN THE BID BOOK AND
UPLOAD THE COMPLETED FORMS TO PENNBID WITH THE BID SUBMISSION.
FAILURE TO PROVIDE THESE DOCUMENTS CAN RESULT IN A NON-RESPONSIVE
BID.
By signing where indicated on these forms, Bidder does hereby attest that he/she has fully read and understands the general conditions and instructions, specifications, and any other b id documents herein contained, and will furnish and deliver all labor and materials in accordance with the specifications for the price as listed on the proposal form.
Bidder acknowledges receipt of Addenda by initialing the following:
Addendum No. 1 _____ Addendum No. 2 _____ Addendum No. 3 _____
Addendum No. 4 _____ Addendum No. 5 _____ Addendum No. 6 _____
(This form must be completed and submitted with the Bid Proposal.)
at Lehigh Valley International Airport 10/13/2026
BF.6
BIDDER INFORMATION
Company Name*: ____________________________________________
Contact Name: ______________________________________________
Title: _____________________________________________________
Address: ___________________________________________________
E-Mail Address: _____________________________________________________________________________________________________________________________________________________________________________________________________
*Insert corporation, partnership or individual as applicable.
Gentlemen/Ladies:
The Bidder, in compliance with the Invitation for Bids has examined the plans and specifications with related documents and the size of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment, plant and services, and to construct the project in accordance with the Contract Documents and Addenda within the time set forth therein, and at the total sum base bid stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this proposal is a part.
1. CONTRACT 1 – GENERAL CONSTRUCTION – TOTAL SUM BASE BID:
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
______________________________________________ Dollars $ _________
(Written) (Figures)
2. CONTRACT 2 – MECHANICAL CONSTRUCTION – TOTAL SUM BASE BID:
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
______________________________________________ Dollars $ _________
(Written) (Figures) at Lehigh Valley International Airport 10/13/2026
BF.7
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
3. CONTRACT 3 – ELECTRICAL CONSTRUCTION – TOTAL SUM BASE BID:
To furnish labor, materials, equipment, plant and services necessary to properly complete the work required under the TOTAL SUM BASE BID, based on the unit prices set forth in the required Schedule of Values (attached by reference) in strict accordance with the aforesaid documents. Any add or deduct alternatives should only be shown on the Schedule of Values and not included in the total sum below.
______________________________________________ Dollars $ _________
(Written) (Figures)
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.)
It is understood that the bid price will be firm for a time period of one hundred twenty
(120) calendar days from the bid opening date and that if the undersigned is notified of acceptance of this proposal within this time period, the firm shall complete the total work as defined in Section GI-1.05.10 based on the total contract award) from the date of "Notice of Award" for project and to complete the work in accordance with the provisions of the Contract Documents.
at Lehigh Valley International Airport 10/13/2026
BF.8
1. SUBCONTRACTORS:
A. All Bidders shall submit their list of subcontractors list as part of their bid packet.
B. No change or deviation from this list shall be allowed except as determined by the Owner or the Owner's Representative.
2. AWARD: Award of the bid can be made by the Owner to the responsive, responsible low bidder based on the Total Sum Bid.
3. BIDDER'S STATE OF PENNSYLVANIA REGISTRATION NUMBER:
Construction Firm License No. Date Issued Place of Issuance
Federal Employer Identification Number (FEIN) or Social Security No. if no FEIN
Bid Security Bonds shall be attached to this proposal in the amount of (10%) percent of the Total Base Bid. Originals will be provided by the lowest responsive bidder upon notice of award.
If no bid has been accepted within ninety (120) Calendar days after the bid opening, then any bond may be returned upon demand of the bidder.
Upon receipt of written notice of the acceptance of this bid, bidder will execute the formal contract within ten (10) calendar days. The Bid Security attached, in the sum of:
______________________________________________ Dollars $ _________
(Written) (Figures) is to become the property of the Owner in the event the Contract and Bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.
Failure to properly and completely fill in all blanks may be cause for rejection of this proposal. All alternates and unit prices called for in the Contract Documents must be submitted herewith.
at Lehigh Valley International Airport 10/13/2026
BF.9
I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE
PENALTIES OF PERJURY THAT THE CONTENTS OF THE
AFFIDAVITS AND BID SUBMISSION DOCUMENTS ARE TRUE AND
CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND
BELIEF AND THAT I AM THE DULY AUTHORIZED
REPRESENTATIVE OF THE BELOW BUSINESS AND THAT I POSSESS
THE LEGAL AUTHORITY TO MAKE THE AFFIDAVITS ON BEHALF
OF MYSELF AND THE BUSINESS FOR WHICH I AM ACTING.
BY:
(Signature of Authorized Representative and Affiant)
(Name & Title Printed)
(Business Address)
(Phone Number) (Fax Number)
(Federal Employer Identification Number)
(SEAL) If bid is by corporation.
at Lehigh Valley International Airport 10/13/2026
BF.10
AFFIRMATION REGARDING COLLUSION
I AFFIRM THAT:
Neither I nor, to the best of my knowledge, information, and belief, the below stated business has:
Agreed, conspired, connived, or colluded to produce a deceptive show of competition in the compilation of the accompanying bid or offer that is being submitted;
(a) In any manner, directly or indirectly, entered into any agreement of any kind to fix the bid price or price proposal of the Bidder or Offeror or of any competitor, or otherwise taken any action in restraint of free competitive bidding in connection with the contract for which the accompanying bid or offer is submitted.
That the information above is true and complete to the best of my knowledge.
Printed Name and Title
Signature Date at Lehigh Valley International Airport 10/13/2026
BF.11
AFFIRMATION REGARDING BRIBERY CONVICTIONS
I FURTHER AFFIRM:
Neither I nor, to the best of my knowledge, information, and belief, the below-named business, nor any of its officers, directors, partners, or any of its employees directly involved in obtaining or performing contracts with public bodies has been convicted of, or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe in violation of Pennsylvania law, or of the law of any other State or federal law, except as follows (indicate the reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of person(s) involved, and their current positions and responsibilities with the business).
Bidder’s Company/Firm:
Address:
Authorized Signature:
Name & Title Printed:
Telephone & Fax Number: /
E-Mail Address:
Date:
Federal Employer’s Identification No.:
at Lehigh Valley International Airport 10/13/2026
BF.12
CONTRACTOR'S CERTIFICATION OF ELIGIBILITY
The bidder/offeror certifies, by submission of this proposal or acceptance of this contract, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.
The bidder/offers or further agrees by submitting this proposal that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the bidder/offer/contractor or any lower tier participant is unable to certify to this statement, it shall attach an explanation to this solicitation/proposal.
That the information above is true and complete to the best of my knowledge.
Printed Name and Title
Signature Date
NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001.
The full names and residences of all persons interested in this proposal as principals are as follows:
at Lehigh Valley International Airport 10/13/2026
BF.13
BIDDER’S LIST COLLECTION FORM
LNAA is required by CFR Title 49, Subtitle A, Part 26, subpart A, § 26.11(c) to collect bidders list information from all bidders at the time of bid submittal. The data must be collected for all firms who bid as prime contractors or subcontractors. Please list yourself (bidder) and all firms that provided a quote (successfully or not).
As such, it is the responsibility of the bidder to complete the following information as a condition of submitting a proposal for this project. The sponsor will consider incomplete information to be an irregular proposal.
Airport Name: Lehigh Valley International Airport
AIP No.: N/A
Project Name: Cooling Tower Replacement
Bidder’s Information
Bidders Name:
Firm Address, Zip Code, Phone No.
DBE/ SBE, or Non-DBE
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
SBE
Less than 1 year
3 years
4-7 years
8-10 years
More than 10 years
Less than $1 million
$1-3 million
$3-6 million
$6-10 million
Over $10 million
(This form must be completed and submitted with the Proposal.)
at Lehigh Valley International Airport 10/13/2026
BF.14
SUBCONTRACTOR’S LIST COLLECTION FORM
LNAA is required by CFR Title 49, Subtitle A, Part 26, subpart A, § 26.11(c) to collect bidders list information from all bidders at the time of bid submittal. The data must be collected for all firms who bid as prime contractors or subcontractors. Please list yourself (bidder) and all firms that provided a quote (successfully or not).
As such, it is the responsibility of the bidder to complete the following information as a condition of submitting a proposal for this project. The sponsor will consider incomplete information to be an irregular proposal.
Airport Name: Lehigh Valley International Airport
Project Name: Cooling Tower Replacement
Subcontractor’s Information
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
at Lehigh Valley International Airport 10/13/2026
BF.15
Bidders Name:
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
BF.16
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
Status
NAICS Code(s) of Scope(s) Bid Age of Firm Annual Gross
Receipts
DBE
(Copy this form and submit with your original proposal if more space is needed.)
at Lehigh Valley International Airport 10/13/2026
BF.17
BIDDER & SUBCONTRACTOR UTILIZATION SUMMARY FORM
As outlined in the bid documents and Contract Summary, the Owner requires the Bidder to provide their project utilization summary of all work to be self-performed and / or designated to the identified subcontractors (listed on the bidder and subcontractor collection forms included in this Bid Book). The project utilization percentage (%) should be based on the estimated contract value of each contractor’s estimated work in relation to the total sum Base Bid value submitted by the Bidder. For this project, a bidder’s self-performance goal of 50% is requested. The Owner will consider incomplete information to be a non-responsive bid.
Airport Name: Lehigh Valley International Airport
Project Name: Cooling Tower Replacement_________________________________________
Bidder / Prime Contractor Utilization Summary
Firm Name Estimated Contract Value Contract %
Subcontractor’s Utilization Summary
Firm Name Estimated Contract Value
Contract % (based on value) at Lehigh Valley International Airport 10/13/2026
BF.18
Firm Name Estimated Contract Value Contract %
(Copy this form and submit with your original proposal if more space is needed.)
at Lehigh Valley International Airport 10/13/2026
BF.19
SMALL BUSINESS PARTICIPATION UTILIZATION PLAN
Contractor must submit this form and attach one letter of intent for each small business subcontractor, supplier or manufacturer that you are committed to utilizing on this project.
LNAA encourages participation of all small businesses in the performance of this project.
AIRPORT NAME: ________________________________________________________
PROJECT NAME:________________________________________________________
NAME OF BIDDERS FIRM:_________________________________________________
STREET ADDRESS: ______________________________________________________
CITY _____________________ STATE _______________ ZIP CODE _____________
PRINTED NAME OF SIGNER: ______________________________________________
EMAIL ADDRESS: _______________________________________________________
TOTAL BID AMOUNT: _________________________________________
SMALL BUSINESS UTILIZATION SUMMARY
Small Business Firm Scope of Work Amount
SMALL BUSINESS PARTICIPATION: $ __________________
Affirmation:
The undersigned hereby assures that the information included herein is true and correct, and that the Small Business firm(s) listed on the attached Letter of Intent Forms have agreed to perform a commercially useful function in the work items noted for each firm.
By: _______________________________________ __________________________
Signature of Bidder’s Representative Title at Lehigh Valley International Airport 10/13/2026
BF.20
SMALL BUSINESS PARTICIPATION LETTER OF INTENT FORM
Submit one letter of intent for each small business subcontractor, supplier or manufacturer if the Contractor is completing the Small Business Participation Plan Form on the following page.
PROJECT NAME/LOCATION: _________________________________________________
NAME OF BIDDER’S FIRM: __________________________________________________
STREET ADDRESS: ________________________________________________________
CITY: _____________________ STATE: ________________ ZIP CODE: _____________
NAME OF SMALL BUSINESS:_________________________________________________
STREET ADDRESS: _______________________________________________________
CITY: _____________________ STATE: ________________ ZIP CODE: _____________
CONTACT PERSON:
EMAIL ADDRESS:
PROOF ATTACHED OF SMALL BUSINESS ELIGIBILITY
_____ Certification Included: _______________________________________ Or
_____ Verification of Gross Revenue form
CLASSIFICATION (Check one):
___ PRIME CONSULTANT ___ SUBCONSULTANT ___ JOINT VENTURE
___ PRIME CONTRACTOR ___ SUBCONTRACTOR ___ MANUFACTURER
___ BROKER ___ SUPPLIER/DEALER ___ SUPPLIER/DISTRIBUTOR
DESCRIPTION OF WORK ITEMS TO BE PERFORMED:
NAICS Scope of Work to be performed Dollar Value
BF.21
| Each bid must show the full business address and telephone number of the Bidder and be signed by the person legally authorized to sign contracts. All correspondence concerning the bid and contract, including Notice of Award, copy of contract and purch... |
| I DO SOLEMNLY DECLARE AND AFFIRM UNDER THE PENALTIES OF PERJURY THAT THE CONTENTS OF THE AFFIDAVITS AND BID SUBMISSION DOCUMENTS ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF AND THAT I AM THE DULY AUTHORIZED REPRESENTATIVE ... |
| E-Mail Address: |