13-LNAA - ABE - Cooling Tower Replacement - Addendum No. 1.pdf

PDF 470 KB Posted

Attached to
Cooling Tower Replacement
Solicitation number
US.258403
Issued by
Lehigh County, Pennsylvania

About this file

This is Addendum No. 1 to the contract documents for the Cooling Tower Replacement project at Lehigh Valley International Airport issued by the Lehigh-Northampton Airport Authority (LNAA), with engineering support from McFarland-Johnson, Inc. The project consists of the one-for-one replacement of an existing roof-mounted cooling tower, replacement of the associated screen wall system, repairs to the existing rooftop mechanical penthouse including man door replacement and structural repairs, and replacement of an existing IT room air conditioning split system. The work is divided into three separate contracts: Contract 1 (General Construction) covering screen wall replacement, penthouse repairs, and related work; Contract 2 (Mechanical Construction) covering cooling tower and HVAC system replacement, with bidders required to submit cooling tower equipment specifications with their bids; and Contract 3 (Electrical Construction) covering electrical power disconnection/reconnection, variable frequency drive replacement, and lightning protection system replacement. A non-mandatory pre-bid meeting was held virtually on October 27, 2026, via Microsoft Teams. Questions regarding the solicitation must be submitted by 4:00 p.m. on October 27, 2026, via www.PennBid.net. Sealed proposals must be submitted by 2:00 p.m. on Friday, November 13, 2026, via www.PennBid.net, with public bid opening at the LNAA Boardroom, 2nd Floor, Main Terminal, 3311 Airport Road, Allentown, Pennsylvania. Construction is anticipated to commence in Spring 2027 with an overall duration of 60 calendar days. All proposals remain valid for 120 days.

The contract includes no Disadvantaged Business Enterprise (DBE) set-aside goal. Bidders must account for prevailing wage rate requirements as specified in the contract documents and obtain proper airport badging for all crew leaders and personnel, with any badging fees to be included in bid submissions. Liquidated damages are assessed at $1,000 per calendar day or portion thereof for work completed beyond the project completion time. There are no cost escalation clauses included in the contract; bidders must account for all costs within their fixed-price proposals. Contractors must coordinate with a concurrent roof replacement project being provided by others and are responsible for any necessary roofing patching or repairs to accommodate their installations. All crane work must be performed during night or off-hours and coordinated with LNAA. Site access, staging areas, and traffic maintenance during both day and night hours within and outside the terminal are subject to LNAA coordination and requirements.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 01

to

CONTRACT DOCUMENTS

for

LEHIGH VALLEY INTERNATIONAL AIRPORT

LEHIGH-NORTHAMTPN AIRPORT AUTHORITY

COOLING TOWER REPLACEMENT

LNAA-CO-26-002

M-J PROJECT NO.: 01.19181.12

November 4, 2026

Lehigh Valley International Airport

Cooling Tower Replacement Addendum No. 01

LEHIGH VALLEY INTERNATIONAL AIRPORT

COOLING TOWER REPLACEMENT

TABLE OF CONTENTS

1. Instructions

2. Minutes from Pre-Bid Conference

3. Contractor Questions and Answers

4. Attachments

ADDENDUM No. 01 November 4, 2026

Addendum No. 01

1. INSTRUCTIONS TO ALL HOLDERS OF CONTRACT DOCUMENTS

Your attention is directed to the following interpretations of changes in and additions to the

Contract Documents for the construction of the COOLING TOWER REPLACEMENT project at

LEHIGH VALLEY INTERNATIONAL AIRPORT.

Please indicate receipt of this addendum on page BF.5 of the Bid Book.

2. MINUTES OF PREBID CONFERENCE

See Attachments for Pre-Bid Meeting Minutes.

3. CONTRACTOR QUESTIONS AND ANSWERS

See www.PennBid.net for questions and answers.

4. ATTACHMENTS

a. Pre-Bid Meeting Minutes http://www.pennbid.net/

PROJECT PRE-BID MEETING MINUTES

Tuesday, October 20, 2026 at 1:00 p.m.

via Microsoft Teams

1) Attendance:

Meeting attendance available upon request.

II. Project Description:

This project consists of a Base Bid only, A general description of the major work associated with the base bid is as follows:

This project consists of the one-for-one replacement of an existing roof mounted cooling tower and replacement of the associated screen wall system. Repairs to the existing roof top mechanical penthouse including man door replacement, removal of existing wall louver, and structural repairs are also included. Additionally, the replacement of an existing IT room air conditioning split system is to be provided.

III. Relationships

A. The Owner: Lehigh-Northampton Airport Authority (LNAA)

B. Grant Agencies: N/A

C. Engineer: McFarland-Johnson, Inc.

D. Contractor: To be awarded as a multi-prime contract with

LNAA.

IV. Items included in the Bid

The contract bid items include in general:

A. Contract 1 - General Construction:

1. The work under this contract is generally comprised of the following items: The removal of an existing brick screen wall system and replacement with new metal wall system, replacement of an existing mechanical penthouse man door, and removal of existing wall louver and replacement with overhead door.

2. All work shown and described in the following drawing Series: “S” and “A”, of the drawing set entitled “Cooling Tower Replacement”.

3. All work required and described in the following Specification Sections:

i) Parts I, II, IV, V, VI, VII in their entirety.

ii) The following Divisions of Part III Technical Specifications:

a. Division 1 – General Requirements.

b. Division 2 – Existing Conditions.

c. Division 4 – Masonry.

d. Division 5 – Metals.

e. Division 7 – Thermal and Moisture Protection.

f. Division 8 – Openings.

g. Division 9 – Finishes.

h. Division 10 – Specialties.

B. Contract 2 – Mechanical Construction:

following items: The one-for-one replacement of an existing roof mounted cooling tower and the replacement of an existing IT room air conditioning split system.

2. All work shown and described in the following drawing Series:

“M”, of the drawing set entitled “Cooling Tower Replacement”.

iii) Parts I, II, IV, V, VI, VII in their entirety.

iv) The following Divisions of Part III Technical Specifications:

a. Division 1 – General Requirements.

b. Division 23 – Heating, Ventilating, and Air-

Conditioning (HVAC).

4. Please note, due to expected equipment lead times, Contract 2 bidders are required to provide cooling tower equipment submittal with bid submission. Submittal shall be reviewed by Engineer at the time of bid analysis with the expectation that equipment will be ordered immediately upon award of contract to meet project schedule.

C. Contract 3 - Electrical Construction following items: The disconnection and reconnection of electrical power in support of the HVAC equipment replacement, replacement of existing variable frequency drives, and replacement of existing roof mounted lightning protection system.

2. All work shown and described in the following drawing Series: “E”, of the drawing set entitled “Cooling Tower Replacement”.

v) Parts I, II, IV, V, VI, VII in their entirety.

vi) The following Divisions of Part III Technical Specifications:

a. Division 1 – General Requirements.

b. Division 26 – Electrical.

D. Contractor’s Schedule:

1. Contractor shall provide a construction schedule for all work activities. This schedule shall be submitted to the Engineer for review during the Pre-Construction meeting. The schedule shall be maintained throughout the project to the satisfaction of the Engineer.

V. Items NOT included in the Bid

A. Work by Others:

1. Roof replacement in the same general area as this project is being provided by others and is not part of this project.

Contractors are expected to coordinate with roof replacement project as necessary. Patching/repair of roofing to accommodate installation of items as part of this project shall be the responsibility of this project’s contractors per bid documents.

VI. Additional Considerations/Topics –

A. Security and Airport Access

1. Badging of Crew Leaders– All Bidders shall note that it is a requirement for all construction crews to be under the direct supervision of a properly badged individual. Bidders shall consider the number of badged personnel both they and their Subcontractors will require to allow for orderly progression of contract work. If a badged individual is required to leave the job site, without a badged replacement, the work crew under his or her direction will need to leave as well.

2. Badging Process – Refer to project specifications to badging process information. Any badging fees are to be included in the items for bid.

3. Site Access – Access to the areas of work will take place per the

LNAA.

4. Contractor Staging – Limited stages areas provided by the LNAA.

5. Maintenance and Protection of Traffic – Contractors shall be working inside and outside the terminal. Traffic will be both vehicular and pedestrian.

6. Coordination with the LNAA is required for any closures roadways/sidewalks.

7. All crane work must be performed at night/off-hours and be coordinated with the LNAA.

8. Site inspections during bidding period shall be available to schedule for pre-bid attendees by appointment only

B. General Requirements for review

1. Bonding and Insurance – the Contractor is directed to review the requirements for insurance and bonding contained within the contract documents.

2. Prevailing Wages –State wage rate schedules are included in the contract documents.

3. EEO Goals:

a. Disadvantaged Business Enterprise (DBE) Goal: 0.00%

4. Liquidated Damages – Clauses have been included for work beyond the completion times of the project. Damages are $1000 per Calendar Day or portion thereof.

5. Design Interpretation: All questions shall be submitted via www.PennBid.net. The deadline for submitting inquiries related to this project is Tuesday, October 27, 2026 at 4:00 pm local time.

C. Addendum Items

1. Minutes from this Pre-Bid Meeting will be submitted via

Addendum.

D. Anticipated Construction Schedule

1. Construction commencement is anticipated in the Spring of 2027.

2. The overall construction duration is 60 calendar days.

3. There are no cost escalation clauses for any item in the contract.

Bidders shall take this into consideration when preparing and submitting their bid.

E. Bid Opening

1. Bids proposals shall be submitted via www.PennBid.net no later than 2:00 pm local time on Friday, November 13, 2026. Bids will be opened in the Main Terminal Boardroom on the 2 nd Floor of the Lehigh Valley International Airport.

VII. Open Discussion http://www.pennbid.net/

ADDENDUM NO. 01
CONTRACT DOCUMENTS
for
LEHIGH VALLEY INTERNATIONAL AIRPORT
LEHIGH-NORTHAMTPN AIRPORT AUTHORITY
November 4, 2026
LEHIGH VALLEY INTERNATIONAL AIRPORT
TABLE OF CONTENTS
ADDENDUM No. 01
Please indicate receipt of this addendum on page BF.5 of the Bid Book.