8-Deviations Request Form (REV).pdf

PDF 186 KB Posted

Attached to
BP036 Sitework Package 1- Package A
Solicitation number
CSP 26-041AL
Issued by
Fort Bend County, Texas

About this file

This is a Deviation Request Form for the Fort Bend Independent School District (FBISD) Sitework Package 1 (BP036) contract opportunity in Texas. The form provides a standardized process for bidders to request deviations from specified products, materials, or details outlined in the project specifications and drawings. Bidders must submit deviation requests as Alternate 2 with supporting documentation and comparative data explaining why the specified item cannot be provided and how the proposed alternative differs from the specification. The form requires bidders to identify the affected specification section or drawing number, describe the item, and detail the reason for the deviation with point-by-point comparative analysis between the proposed deviation and the specified product or material.

The form requires bidders to disclose whether the proposed deviation affects other project components, any time impacts (additions or deductions in days), and anticipated cost savings or benefits to the District. Deviation requests must include the printed name and signature of an authorized representative along with the submission date. The Architect/Engineer (A/E) provides a recommendation section indicating whether the deviation request is approved to proceed or rejected in favor of using the specified product. Notably, the instructions explicitly state that no deviations are allowed in the Base Bid or Base Bid Adjustment, restricting deviations to Alternate 2 submissions only. The form was revised as of February 23, 2023.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEVIATION REQUEST FORM

Instructions to Bidders: No deviations are allowed in the Base Bid or Base Bid Adjustment. Deviations shall be submitted on the Deviations Form as Alternate 2. Complete this form, attach any supporting data and submit with Package B.

Project Title and Number:

Deviation Request No. Date Submitted: Specification Section, and/or Drawing No:

Item Description:

Reason for Deviation: (If specified product, material or detail cannot be provided, include statement indicating why and provide supporting information.):

Differences (point-by-point comparative data) between proposed deviation and specified product, material or detail:

Proposed deviation affects other parts of the project : YES NO

Explain:

Time Impact due to Deviation: YES NO ADD DEDUCT

Anticipated deviation savings and/or benefit to the District:

Days

Date:

Printed Name of Authorized Representative:

Signature of Authorized Representative:

A/E Recommendation:

Deviation Request approved to proceed with deviation:

Deviation Request rejected:

Use specified product

Notes: Date:

Additional Information if Applicable

Reason for Deviation: (If specified product, material or detail cannot be provided, include statement indicating why and provide supporting information.)

Differences (point-by-point comparative data) between proposed deviation and specified product, material or detail:

Revised 2/23/23

Project Title and Number:
Deviation Request No:
Date Submitted:
Specification Section andor Drawing No:
Item Description:
Reason for Deviation If specified product material or detail cannot be provided include statement indicating why and provide supporting information:
Differences pointbypoint comparative data between proposed deviation and specif ed product material or detail:
undefined:
AE Recommendation Deviation Request approved to proceed with deviation Deviation Request rejected Use specified product Notes Date:
Reason for Deviation If specified product material or detail cannot be provided include statement indicating why and provide supporting information_2:
Differences pointbypoint comparative data between proposed deviat on and specified product material or detail:
Text1:
Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off

File details come from the government source that posted it. Updated .