15-BP036 - BASE BID PROPOSAL FORM.pdf

PDF 332 KB Posted

Attached to
BP036 Sitework Package 1- Package A
Solicitation number
CSP 26-041AL
Issued by
Fort Bend County, Texas

About this file

This is a Base Bid Proposal Form for Fort Bend Independent School District (FBISD) seeking a contractor to provide sitework renovations and repairs at multiple campuses under CSP 26-041AL BP 036 (Sitework Package 1). The scope of work includes repairs to site grading, sidewalks, storm drainage, irrigation, and parking lots. The project is anticipated to take 575 calendar days to complete from the date of the executed contract and issuance of Notice to Proceed, though contractors may propose shorter completion timelines for FBISD consideration. Contractors must submit proposals acknowledging receipt of all addenda (ADD-01 through ADD-08) and certify that they have examined the site, locality conditions, and all relevant legal requirements. The proposal will remain open for 60 days after proposal opening, and contractors must sign the agreement and submit contract security within 10 calendar days of receiving the Notice of Award.

Pricing must be submitted as a lump sum amount for the complete work. The proposal includes unit price provisions for multiple categories including foundation work (drilled piers and auger cast piling at various diameters), site concrete work (sidewalks, flatwork, concrete paving, and curbing), electrical power installation, standard electrical work, and data ports. Liquidated damages are established at $1,000 per day for each calendar day that substantial completion is delayed, with an additional $250 per day for non-completion of punch list items and contract closeout within 60 calendar days after substantial completion. Contractors must accept all terms and conditions of the Instructions to Bidders, proposal documents, and contract documents, and must certify that the proposal is genuine and submitted without collusion or improper inducement of other parties.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RETURN THIS DOCUMENT IN CSP BID/PROPOSAL PACKAGE

BASE BID FORM – P a g e | 1

SECTION AC

PACKAGE “A” BASE BID PROPOSAL FORM – CSP STIPULATED SUM

CSP No: CSP 26-041AL BP 036 - BP Name: Sitework Package 1

FORT BEND INDEPENDENT SCHOOL DISTRICT

Submitted by: _______________________________________________________________________

Date: ______________________ Phone Number: __________________________________________

Vendors are required to respond to all requests identified in the Solicitation and indicate their acceptance or objection to the terms of the Solicitation and these General Provsisions must be clearly indicated in

Vendor’s Solicatiation Response. No-bid is deemed non-responsive by FBISD.

Having examined Proposal and Contract Documents prepared by Fort Bend ISD and MWA Architects dated 12/12/2025 and having examined site conditions, the undersigned proposes to furnish all labor, equipment and materials and perform all work for the completion of the above-named project for the sum indicated below.

I. DESCRIPTION: FBISD is seeking a contractor to provide a turnkey solution for site work renovations and repairs at multiple campuses (BP036). The scope of work includes repairs to site grading, sidewalks, storm drainage, irrigation, and parking lots.

Undersigned agrees to complete the work for the lump sum amounts of:

_______________________________________________________________________________Dollars

(Amount written in words governs)

(Amount in figures)

II. PROJECT TIMELINES

The District anticipates that this project will take 575 calendar days to complete. Contractor agrees the work will be substantially completed within 575 calendar days from executed contract and issuance of Notice to Proceed.

Should the Contractor anticipate lower calendar days to complete this project, please indicate below. The District will consider contractor proposed lower calendar days and incorporate into contract if deemed appropriate.

CONTRACTOR’S PROPOSED DAYS TO COMPLETE BP 036_________________

III. LIQUIDATED DAMAGES:

The undersigned understands that liquidated damages as defined in the Supplementary Conditions will be included in the form of Agreement Between Owner and Contractor and that the contractor will be bound thereto.

BASE BID FORM – P a g e | 2

Contractor accepts the provisions of the Contract as to liquidated damages in the event of failure to complete the work on time. Liquidated damages shall be the sum of $1,000.00 per day for each calendar day that Substantial Completion is delayed for each project.

Further, the Contractor acknowledges that additional liquidated damages in the sum of $250.00 per day for each calendar day shall be imposed for non-completion of punch list items and contract close-out within sixty (60) calendar days after Substantial Completion.

IV. ALLOWANCES:

Allowances are to be included in the Contractor’s base bid for each project in the following amounts:

A. $Add dollar amount . Add description of allowance

B. $Add dollar amount . Add description of allowance

Contractor should include allowance and markup in the base bid. Section 3.8 of the

Supplementary Conditions defines the procedures for markups.

V. UNIT PRICES – BASE BID

UNIT PRICES – FOUNDATION

A. Provide unit pricing for straight shaft drilled piers in lieu of drilled bell bottom piers –same depth as indicated on the Drawings:

01 ☐24” Diameter ______________ Each (EA)

02 ☐30” Diameter ______________ Each (EA)

03 ☐36” Diameter ______________ Each (EA)

04 ☐42” Diameter ______________ Each (EA)

05 ☐48” Diameter ______________ Each (EA)

06 ☐54” Diameter ______________ Each (EA)

07 ☐60” Diameter ______________ Each (EA)

08 ☐66” Diameter ______________ Each (EA)

09 ☐72” Diameter ______________ Each (EA)

10 ☐ add diameter Diameter ______________ Each (EA)

11 ☐ add diameter Diameter ______________ Each (EA)

12 ☐ add diameter Diameter ______________ Each (EA)

13 ☐ add diameter Diameter ______________ Each (EA)

14 ☐ add diameter Diameter ______________ Each (EA)

B. Provide unit pricing for auger cast piling:

01 ☐14” Diameter ______________ Lin. Foot (LF)

02 ☐16” Diameter ______________ Lin. Foot (LF)

03 ☐18” Diameter ______________ Lin. Foot (LF)

04 ☐20” Diameter ______________ Lin. Foot (LF)

05 ☐24” Diameter ______________ Lin. Foot (LF)

06 ☐ add diameter Diameter ______________ Lin. Foot (LF)

07 ☐ add diameter Diameter ______________ Lin. Foot (LF)

BASE BID FORM – P a g e | 3

08 ☐ add diameter Diameter ______________ Lin. Foot (LF)

09 ☐ add diameter Diameter ______________ Lin. Foot (LF)

10 ☐ add diameter Diameter ______________ Lin. Foot (LF)

UNIT PRICES – SITE CONCRETE

A. Provide unit pricing for the following site concrete work:

01 ☐ Add/Delete 60” Wide Sidewalks _________Lin. Foot (LF)

02 ☐ Add/Delete Non-Traffic Concrete Flatwork _________ Sq. Foot (SF)

03 ☐ Add/Delete Med. Duty (5”) Concrete Paving _________ Sq. Foot (SF)

04 ☐ Add/Delete Heavy Duty (7”) Concrete Paving _________ Sq. Foot (SF)

05 ☐ Add/Delete 6” Concrete Curb _________Lin. Foot (LF)

UNIT PRICES – ELECTRICAL POWER

B. Provide unit pricing for the following electrical power work:

01 ☐Add/Delete Contractor generated power to the site/project (in the absence of CenterPoint power availability). __________ Per Month

UNIT PRICES – ELECTRICAL POWER

A. Provide unit pricing for the following electrical work:

01 ☐ Add/Delete 120V Duplex Rec. On Nearby Circuit _________ Each (EA)

02 ☐ Add/Delete 120V Duplex Rec. On Dedicated Circuit, including 20 amp circuit breaker _________ Each (EA)

03 ☐ Add/Delete 220V Rec. On Dedicated Circuit including 20 amp circuit breaker _________ Each (EA)

04 ☐ Add/Delete Two-Way Light Switch _________ Each (EA)

05 ☐ Add/Delete Two-Way Light Switch _________ Each (EA)

06 ☐ Add/Delete J-Box with 1-1/4” Conduit stubbed to above ceiling __________ Each (EA)

UNIT PRICES – DATA

A. Provide unit pricing for the following electrical work:

01 ☐Add/Delete Data Port Wired to Nearest IDF/MDF __________Each (EA)

UNIT PRICES – Add Description

01 ☐ add description ______________ add unit

02 ☐ add description ______________ add unit

03 ☐ add description ______________ add unit

04 ☐ add description ______________ add unit

05 ☐ add description ______________ add unit

VI. CHANGES IN THE WORK

BASE BID FORM – P a g e | 4

The undersigned understands that changes in the work shall be performed in accordance with the

Supplementary Conditions.

VII. PROPOSAL EVALUATION WAIVER

By submitting a Proposal, the proposer indicated below agrees to waive any claim it has or may have against the Owner, Architect, Engineers, Consultants and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any proposal.

The proposer further agrees the Owner reserves the right to waive any requirements under the proposal documents or the Contract Documents, acceptance or rejection of any proposals, and recommendation or award of the contract.

It is understood that the right is reserved by the Owner to reject any or all proposals, or waive any informalities in Receipt of Proposals.

The undersigned certifies that the amounts contained in this Competitive Sealed Proposal have been carefully checked and are submitted as correct and final; and additionally, agrees to comply with all provisions of the Proposal Form.

The undersigned CONTRACTOR proposes and agrees, if this Proposal is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to complete all work as specified or indicated in the Contract Documents for the Contract Price and within the Contract

Time indicated in this Proposal and in accordance with the Contract Documents.

CONTRACTOR accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Proposal Security. This Proposal will remain open for sixty (60) days after the day of Proposal opening. CONTRACTOR will sign the

Agreement and submit the Contract Security and other documents required by the Contract documents within ten (10) calendar days after the date of the OWNER'S Notice of Award.

In submitting this Proposal, CONTRACTOR represents, as more fully set forth in the Agreement, that:

(a) Contractor has examined copies of all the Contract Documents and of the following addenda, receipt of which is hereby acknowledged, and also copies of the Advertisement or Invitation to

Submit Proposal.

________ ADD-01 dated ________ Total # pgs________ ADD-02 dated ________ Total # pgs________

________ ADD-03 dated ________ Total # pgs________ ADD-04 dated ________ Total # pgs________

________ ADD-05 dated ________ Total # pgs________ ADD-06 dated ________ Total # pgs________

________ ADD-07 dated ________ Total # pgs________ ADD-08 dated ________ Total # pgs________

(b) CONTRACTOR has examined the site and locality where the work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules and regulations) and the conditions effecting cost, progress or performance of the work and has made such independent investigations as CONTRACTOR deems necessary.

BASE BID FORM – P a g e | 5

(c) This PROPOSAL is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; CONTRACTOR has not directly or indirectly induced or solicited any other Contractor to submit a false or sham Proposal;

CONTRACTOR has not solicited or induced any person, firm or a corporation to refrain from submitting a proposal; and CONTRACTOR has not sought by collusion to obtain for himself any advantage over any other Contractor or over OWNER.

Type of Proposer’s Organization:

(Corporation, Co-Partnership, Individual, etc.)

Proposer: _______________________________________________________

(Print or Type)

Signature of Proposer

Title of Office: _______________________________________________________

(Print or Type)

Legal Address: _______________________________________________________

Zip Code: ________________ Tel:(__________) _____________________

ATTEST:

(Secretary, if Proposer is a Corporation

SEAL:

(If Corporation)