8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78625B0010
About this file
This is a contractor cost estimate worksheet template designed for submitting pricing for facility repairs at Mill Springs National Cemetery (Project 861CM3011). The worksheet is structured using Construction Specifications Institute (CSI) divisions from Division 0 through Division 33, requiring contractors to provide lump sum costs for each applicable division of work. The template includes dedicated sections for General Conditions, Mobilization, Site Investigation, and various construction categories including concrete, masonry, metals, finishes, HVAC, electrical, and utilities.
The worksheet calculates total base construction costs by combining mechanical/electrical/plumbing and general construction subtotals, with additional fields for insurance, bonding, overhead percentage, and profit percentage to determine the final grand total. The template is specifically tied to VA National Cemetery Administration solicitation 36C78625B0010 for Facility Condition Assessment (FCA) Deficiencies Corrections Repairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mill Springs National Cemetery - RFIs_Response.xlsx | XLSX spreadsheet | |
| 36C78625B0010 0004.docx | DOCX document | |
| 36C78625B0010 0003.docx | DOCX document | |
| 36C78625B0010 0002.docx | DOCX document | |
| 36C78625B0010 0001.docx | DOCX document | |
| S02 Bid Documents Drawings.pdf | ||
| 36C78625B0010.docx | DOCX document | |
| P07 Mill Springs Heavy.txt | TXT text file | |
| 861CM30011_BD Specifications_Correct Cemetery FCA Def Mill Springs NC_Rev1.pdf | ||
| P07 Mill Springs Highway.txt | TXT text file | |
| P07 Mill Spring Building.txt | TXT text file |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Offeror shall use and edit to fit Task Order Project |
| Project Number: |
| Solicitation Number: |
| Project Title: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |