8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B0024
About this file
This document is a Contractor Cost Estimate Worksheet template for a federal contract opportunity. The worksheet provides a format for the contractor to submit a lump sum cost estimate for each division of work required for the project, including general conditions, mobilization, site investigation, and the various construction trades. The worksheet allows the contractor to provide the unit of measure, number of units, unit cost, and extended/total cost for each division. Additional lines can be added as needed. The worksheet is intended to be used for the Solicitation Number 36C78624B0024, which is for construction work to correct cemetery facility condition assessment (FCA) deficiencies at the Knoxville National Cemetery in North Carolina.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0024 0002.docx | DOCX document | |
| BD Plans 885CM3015 Knoxville.pdf | ||
| BD Specs 885CM3015 Knoxville.pdf | ||
| 36C78624B0024 0001.docx | DOCX document | |
| Cost Estimate Worksheet.pdf | ||
| IFB 36C78624B0024_revised.pdf | ||
| P02 885CM3015_Knoxville_BD_Submission_Specs.pdf | ||
| 36C78624B0024_1.docx | DOCX document | |
| P02 885CM3015_Knoxville_BD_Submission_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Bidder shall use and edit to fit specified identified requirement. |
| Project Title: |
| Solicitation Number: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |
File details come from the government source that posted it. Updated .