This document is a Contractor Cost Estimate Worksheet template for a federal contract opportunity. The worksheet provides a format for the contractor to submit a lump sum cost estimate for each division of work required for the project, including general conditions, mobilization, site investigation, and the various construction trades. The worksheet allows the contractor to provide the unit of measure, number of units, unit cost, and extended/total cost for each division. Additional lines can be added as needed. The worksheet is intended to be used for the Solicitation Number 36C78624B0024, which is for construction work to correct cemetery facility condition assessment (FCA) deficiencies at the Knoxville National Cemetery in North Carolina.

View the file

Other files

File Type Posted
36C78624B0024 0002.docx DOCX document
BD Plans 885CM3015 Knoxville.pdf PDF
BD Specs 885CM3015 Knoxville.pdf PDF
36C78624B0024 0001.docx DOCX document
Cost Estimate Worksheet.pdf PDF
IFB 36C78624B0024_revised.pdf PDF
P02 885CM3015_Knoxville_BD_Submission_Specs.pdf PDF
36C78624B0024_1.docx DOCX document
P02 885CM3015_Knoxville_BD_Submission_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.

If a Division is not being used put N/A in that field.

Additional lines/items can be added if needed or appropriate.

Bidder shall use and edit to fit specified identified requirement.
Project Title:
Solicitation Number:
DivisionUnit of Measure# of UnitsUnit Cost $Extended/Total Cost $Comments / Remarks
Division 0 - Special Sections
General Conditions and AdministrationJB1
Division 01 - General Requirements
MobilizationJB1
Division 02 - Existing Conditions
Site InvestigationJB1
Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastic, and Composites

Division 07 - Thermal and Moisture Protection

Division 08 - Openings (Doors, Windows, etc...)

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12- Furnishings

Division 13 - Special Construction

Division 14 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 25 - Integrated Automation

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead________ %$0.00
Profit________ %$0.00
GRAND TOTALS$