Cost Estimate Worksheet.pdf
PDF 86 KB Posted
- Solicitation number
- 36C78624B0024
About this file
The provided document is a Cost Estimate Worksheet template for a federal contract opportunity. It lists various construction divisions (e.g., General Conditions, Concrete, Electrical) and requires the bidder to provide lump sum estimates for each applicable division. The template is intended to be used in conjunction with the related federal contract opportunity, Solicitation Number 36C78624B0024, for construction services to correct cemetery deficiencies at the Knoxville National Cemetery. The solicitation requires repairs and upgrades to the existing Hunter Automated Irrigation System, including removing/replacing old components and installing new Hunter irrigation parts and materials across the approximately 44-acre cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0024 0002.docx | DOCX document | |
| BD Plans 885CM3015 Knoxville.pdf | ||
| BD Specs 885CM3015 Knoxville.pdf | ||
| 36C78624B0024 0001.docx | DOCX document | |
| IFB 36C78624B0024_revised.pdf | ||
| P02 885CM3015_Knoxville_BD_Submission_Specs.pdf | ||
| 36C78624B0024_1.docx | DOCX document | |
| P02 885CM3015_Knoxville_BD_Submission_Plans.pdf | ||
| 8 - Cost Estimate Worksheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title:
Solicitation Number:
Division Unit of Measure # of Units Unit Cost $ Extended/Total
Cost $ Comments / Remarks Division 0 - Special Sections
General Conditions and Administration
JB 1
Division 01 - General Requirements
Mobilization JB 1
Division 02 - Existing Conditions
Site Investigation JB 1
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number.
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
Contractor Cost Estimate Worksheet
Bidder shall use and edit to fit specified identified requirement.
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Mechanical, Electrical, Plumbing Subtotal
General Construction Subtotal
Total Base Construction Cost
Insurance (if applicable)
Bonding (if applicable)
Overhead ________ % $0.00
Profit ________ % $0.00
GRAND TOTALS $