8-Attachment F - Score Sheet.xls
XLS spreadsheet 82 KB Posted
- Solicitation number
- BB26-1
- Issued by
- Utah
About this file
This is a Score Sheet for the Subordinate Shared Appreciation Loan Program (Solicitation #BB26-1) issued by the State of Utah Division of Purchasing and the Department of Workforce Services. The RFP aims to award a single contract for a Subordinate Shared Appreciation Loan Program, with a contract length of 1 year and the option of 4 one-year renewals. The scoring methodology evaluates contractors on minimum mandatory requirements and technical criteria, including experience providing or purchasing loans, purchasing condominium construction liability insurance, mortgage loan experience, and documentation requirements.
The evaluation process requires contractors to be authorized to do business in Utah, be a non-profit or partner of a non-profit entity, and have secured a Letter of Interest or Commitment for a 3:1 ratio of private funds to Program funds. The scoring system uses a 0-5 point scale across various technical criteria, with a required technical point threshold of 70% (105 points out of 150 possible). Cost points will be calculated based on the lowest proposal price, with offerors whose prices are more than double the lowest price receiving zero points. The procurement seeks to align Program funds with the Utah Housing Corporation's First Time Homebuyer Program.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7-Attachment E - Contractor Questions.docx | DOCX document | |
| 10-Justification Statement - BB26-1.pdf | ||
| 4-Attachment C - Scope of Work.docx | DOCX document | |
| 6-Attachment D - Policy.docx | DOCX document | |
| 3-Attachment A - Agency Contract Terms and Condition GS.docx.docx | DOCX document | |
| 9-Award Memo.pdf (1).pdf | ||
| 1-Claim of Business Confidentiality Updated.pdf.pdf | ||
| 2-Vendor Prerequisites - RFP Agency.pdf | ||
| 5-Attachment B - DWS SUPPLEMENTAL TCs 9.11.24.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Score Sheet
| Subordinate Shared Appreciation Loan Program | |||||||||
| SOLICITATION #BB26-1 | |||||||||
| RFP EVALUATION SCORESHEET | |||||||||
| Score will be assigned as follows: | |||||||||
| 0 = Fail, the proposal fails to address the requirements or criteria described in the RFP or cannot be assessed du to missing information | |||||||||
| Firm Name: | 1 = Poor, the proposal inadequately addresses the requirements or criteria described in the RFP or cannot be assessed due to incomplete information | ||||||||
| 2 = Unsatisfactory, the proposal addresses the requirements or criteria described in the RFP in an unsatisfactory manner | |||||||||
| Evaluator: | 3 = Satisfactory, the proposal addresses all requirements or criteria described in the RFP in a minimum satisfactory manner | ||||||||
| 4 = Good, the proposal addresses all requirements or criteria described in the RFP and in some respects exceeds them | |||||||||
| Date: | 5 = Excellent, the proposal addresses and exceeds all of the requirements or criteria described in the RFP | ||||||||
| Minimum Mandatory Requirements | RFP Section | Evaluation (Pass/Fail) | |||||||
| 1 | Contractor must be authorized to do business in the State of Utah as of the date of your response. Provide an affirmative statement that the Contractor complies with this requirement. | ||||||||
| 2 | Contractor must be a non-profit or partner of a non-profit entity. | ||||||||
| 3 | Contractor must have secured a Letter of Interest or Letter of Commitment for matching 3:1 ratio of private funds to Program funds. | ||||||||
| 4 | Contractor must have demonstrated professional experience providing or purchasing loans that meet the requirements for a Subordinate Loan. | ||||||||
| 5 | The Contractor must agree that the Department shall be the final authority in matters of policy, procedures and approval of any reports or plans. | ||||||||
| 0 | |||||||||
| Scoreable Technical Criteria | RFP Section | Evaluator Score (0-5) | Criteria Weight | % of Tech Criteria | Points Possible | Points | |||
| Earned | Minimum Required | ||||||||
| 1. Contractor Experience | |||||||||
| 1 | 1.1 Describe your experience providing or purchasing loans that meets the requirements for a Subordinate Loan as defined in Subordinate Shared Appreciation Loan Program Policy. | 5 | 16.7% | 25.0 | 0.0 | ||||
| 2 | 1.2 Does the Contractor have experience purchasing condominium construction liability insurance? If yes, describe your experience in detail. | 6 | 20.0% | 30.0 | 0.0 | ||||
| 3 | 1.3 Has the Contractor purchased or provided mortgage loans? If yes, describe your experience in detail. | 6 | 20.0% | 30.0 | 0.0 | ||||
| 4 | 1.4 Describe any important features that distinguish the Contractor’s qualifications and experience from others in the field. | 5 | 16.7% | 25.0 | 0.0 | ||||
| 2. Documentation Requirements | |||||||||
| 5 | 2.1 Provide documentation as evidence of 3:1 matching funds (Letter of Interest, Letter of Commitment, or clearly delineated financial documents, or other as applicable). | 5 | 16.7% | 25.0 | 0.0 | ||||
| 6 | 2.2 Provide a Letter of Commitment to align and use Program funds in conjunction with the Utah Housing Corporation’s First Time Homebuyer Program, as applicable. | 3 | 10.0% | 15.0 | 0.0 | ||||
| 0.00% | 150.0 | 0.0 | |||||||
| Required Technical Point Threshold | RFP Section | Min Percent | Min Points Required | Points Earned | Percent Earned | Evaluation | |||
| 70% | 105.0 | 0.0 | 0.0% | 0 | |||||
| * Purchasing will use the following cost formula: The points assigned to each offerors cost proposal will be based on the lowest proposal price. The offeror with the lowest Proposed Price will receive 100% of the price points. All other offerors will receive a portion of the total cost points based on what percentage higher their Proposed Price is than the Lowest Proposed Price. An offeror whose Proposed Price is more than double (200%) the Lowest Proposed Price will receive no points. The formula to compute the points is: Cost Points x (2- Proposed Price/Lowest Proposed Price). | |||||||||
| Total Evaluation Points | Percent of Total | Points Possible | Points Earned | ||||||
| Total Technical Evaluation Points | 100% | 150.0 | 0.0 | ||||||
| Total Cost Evaluation Points | 0% | 0.0 | 0.0 | ||||||
| Total Evaluation Points | 100% | 150.0 | 0.0 |
Scoresheet Summary
| XX##### Solicitation Name Scoresheet Summary | |||||||||||||||||||||
| Instructions: | |||||||||||||||||||||
| Enter the solicitation number and name. | |||||||||||||||||||||
| Enter each Offeror name. | |||||||||||||||||||||
| Enter the Criteria name for each category. | |||||||||||||||||||||
| Enter the Weight in column B that corresponds to the Criteria Weight on the Score Sheet tab column J for each criterion. | |||||||||||||||||||||
| Enter the Total Possible Points for each Criterion, Cost Points, and Score Summary section. | |||||||||||||||||||||
| Mandatory Minimum Requirements: Evaluate each offer and enter pass or fail | |||||||||||||||||||||
| Ensure that the number of evaluator lines matches the number of evaluators. | |||||||||||||||||||||
| Offers not meeting the Minimum Mandatory Requirements will not be evaluated further. | |||||||||||||||||||||
| Ensure that the Total Average Score formula includes all of the evaluator line items. | |||||||||||||||||||||
| Technical Scores: Enter each evaluator score for each offer. | |||||||||||||||||||||
| Signatures: | Date: | ||||||||||||||||||||
| Evaluator 1 | __________________ | ||||||||||||||||||||
| Evaluator 2 | __________________ | ||||||||||||||||||||
| Evaluator 3 | __________________ | ||||||||||||||||||||
| Evaluator 4 | __________________ | ||||||||||||||||||||
| Evaluator 5 | __________________ | ||||||||||||||||||||
| Minimum Mandatory Requirements | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| 1 | |||||||||||||||||||||
| 2 | |||||||||||||||||||||
| 3 | |||||||||||||||||||||
| Weight | Technical Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Criteria #1 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #1 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #2 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #2 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #3 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #3 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #4 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #4 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #5 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #5 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #6 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #6 - Total Points (Total Possible XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #7 | |||||||||||||||||||||
| Evaluator 1 | |||||||||||||||||||||
| Evaluator 2 | |||||||||||||||||||||
| Evaluator 3 | |||||||||||||||||||||
| Evaluator 4 | |||||||||||||||||||||
| Evaluator 5 | |||||||||||||||||||||
| Total Average Score | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Criteria #7 - Total Points (Total Possible Points = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Total Technical Points (Total Possible Points = XX) Minimum Threshold = XX | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Total Cost Points | Cost Scores | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T |
| Cost | |||||||||||||||||||||
| Cost Points | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Score Summary | Offeror A | Offeror B | Offeror C | Offeror D | Offeror E | Offeror F | Offeror G | Offeror H | Offeror I | Offeror J | Offeror K | Offeror L | Offeror M | Offeror N | Offeror O | Offeror P | Offeror Q | Offeror R | Offeror S | Offeror T | |
| Total Technical Points (Total Possible = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Total Cost Points (Total Possible = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |
| Grand Total Points (Total Possible = XX) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
U3P Posting
| XX##### Solicitation Name Scoresheet Summary | |
| Instructions: | |
| Important Note: Do not post this entire document to Utah Public Procurement Place. This serves as a guide only. Develop a separate document to post on Utah Public Procurement Place so that the other Worksheet tabs are NOT included on your Utah Public Procurement Place Posting. | |
| Enter the solicitation number and name. | |
| Enter the name of the winning firm, but all other Offeror names will labeled alphabetically. | |
| Enter the Grand Total Score (includes technical, interview, cost and all other | |
| scores combined) for each Offeror. | |
| Do not include the scores of Offerors who have been disqualified. | |
| Offeror | Total Score |
| Company ABC | |
| Offeror A | |
| Offeror B | |
| Offeror C |