8-Attachment F - Oliver Tank Inspection Report.pdf
PDF 3 MB Posted
- Attached to
- Water Tank Painting Services
- Solicitation number
- RFP #3858
- Issued by
- Riverside County, California
About this file
This document is an underwater inspection report prepared by Liquivision Technology Diving Services for Eastern Municipal Water District's Oliver Reservoir, conducted on December 8, 2021. The report details a comprehensive diving inspection of a welded steel reservoir with a 6,300,000-gallon capacity, measuring 180 feet in diameter and 33 feet in height. The inspection methodology included full-time voice communication between the diver and surface personnel, disinfection of all equipment with a 200ppm chlorine solution, and live high-resolution color video recording.
The inspection revealed that the reservoir's components were generally in good to excellent condition, with most areas receiving a rust grade between 7 and 9 (indicating minimal corrosion). Specific findings include approximately 1/16" of sediment removed from the floor, 98% of the cathodic protection anode remaining, and minor corrosion observed on various components such as walls, floors, ceilings, vents, and penetrations. The report recommends repairing coating failures on interior fixtures, floors, and walls using specialized two-part epoxy, and suggests performing a regular cleaning, inspection, and repair cycle every 2-3 years to maintain superior water quality and coating condition.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oliver Reservoir Eastern Municipal WD
Report of Findings From the
Diving Operations
Conducted on
December 8, 2021 by
711 Market Street, Klamath Falls, OR 97601, (800) 229-6959 www.divingservices.com
Technology
DIVING SERVICES
LiquiVision http://www.divingservices.com/
Liquivision Technology - Inspection Report – December 8, 2021- Page 1
This Page Intentionally Left Blank
Liquivision Technology - Inspection Report – December 8, 2021- Page 2
December 8, 2021
John Dotinga Eastern Municipal WD 2270 Trumble Rd.
Perris, CA 92572
Following is the report of findings during the underwater work conducted on your reservoir.
It will focus on issues of concern or areas that need attention. In order to see a complete and detailed inspection, please view each video.
Color images of all plumbing fixtures, components and areas of concern were taken via underwater digital camera. The images should give you a clear view of the conditions described.
The video may give you another view and a clearer understanding of any area that you may wish to look at more closely.
METHODOLOGY:
Disinfection of All Equipment With 200ppm+ Chlorine Solution Immediately Prior to Entering System: This process prevents contamination of the water supply. All LVT equipment was properly disinfected prior to entering the potable water system.
Full-Time Voice Communication between surface and Diver: The system allowed for constant communication between the diver, and all surface personnel. In addition, customers were able to communicate with the diver at any time. For purposes of a more efficient inspection, cleaning, and repair program, that enabled the diver to immediately discuss any observations he made inside the reservoir.
Full-Time Live High Resolution Color Video: Allowed for constant viewing of the diver's work and observations. This also enabled the district personnel to view what the diver in the reservoir was witnessing.
Underwater Inspection of
Liquivision Technology - Inspection Report – December 8, 2021- Page 3
TERMINOLOGY:
When describing the features or areas of interest inside the reservoir, an image number is placed next to the description that corresponds with the inspection findings. The diagram is shown in a view looking from the top down. The entry hatch is referred to as the 12:00 o’clock position.
Following the diagram are pictures of the pertinent areas of the reservoir and the locations where the pictures were taken. Each picture is descript and numbered.
The standards used to evaluate the condition of the reservoir include: Standard Method of Evaluating Degree of Rusting on Painted Steel Surfaces – SSPC-Vis 2-82 & ASTM D 610-85 NACE Standard RP0196-96 & RP0388-2001 or Condition of Concrete In-service – ACI 201.1R-92.
Liquivision Technology - Inspection Report – December 8, 2021- Page 4
OVERVIEW OF RESERVOIR INSPECTED:
Customer Name: Eastern Municipal WD Reservoir Name: Oliver Reservoir Reservoir
Manager: John Dotinga Construction: Welded Steel
Job Number: CA126521R28T0 Capacity (gal.): 6,300,000
Date of Inspection: December 8, 2021 Diameter or L x W: 180'
Report Writer: John Budden Height: 33'
Diver: Mark Budden Floor Square FT: 25446.2
Tender: Jacob Budden Date Built: unknown
N/A –not applicable Excellent (Ex.) –like new condition, no repairs needed. Good – Cosmetic only problems, repairs if wanted. Fair-Minor problems, repairs needed, not immediate. Poor –Major problems, structural or like, immediate repairs needed.
1. Rust Grades
Grades % of Surface Rusted Description
10 0% - 0.01% No rusting or less than 0.01% of surface rusted
9 0.01% - 0.03% Minute rusting, less than 0.03% of surface rusted
8 0.03% - 0.1% Few isolated rust spots, less than 0.1% of surface rusted
7 0.1%- 0.3% Less than 0.3% of surface rusted
6 0.3% - 1% Extensive rust spots, but less than 1% of surface rusted
5 1% - 3% Rusting to the extent of 3% of surface rusted
4 3% - 10% Rusting to the extent of 10% of surface rusted
3 10% - 16% Approximately one sixth of the surface rusted (16%)
2 16% - 33% Approximately one third of the surface rusted (33%)
1 33% - 50% Approximately one half of the surface rusted (50%)
0 50% - 100% Approximately 100% of the surface rusted
2. Concrete Deformities
Unable to Evaluate
Good Condition
Cracks Blistering Chalking De- Lamination
Pitting Popouts Scaling Spalling Warping
UE GC CK BL CH DL PT PO SC SP WA
Liquivision Technology - Inspection Report – December 8, 2021- Page 5
RECOMMENDATIONS:
Recommendation
Estimated Time - Hrs.
Repair coating failure on interior fixtures, floor and walls. Repairs below the water line can be accomplished utilizing divers, the proper tools and specially formulated two-part epoxy.
Please contact our sales office for an estimate.
Perform a regular cleaning, inspection and repair cycle every 2-3 years in order to ensure superior water quality and proper maintenance of coating condition and appurtenances is performed.
Please contact our sales office for an estimate.
Other
Total Estimated Hours
Liquivision Technology - Inspection Report – December 8, 2021- Page 6
Reservoir Diagram
20 1 2 19 3
21 36 30 33 32 22 34 25r 48 23r
51c
15,17 26,27,49,50 28,29
14 47 35 4 37f 38 45 52c 13 44f 5
12 53c
24r
10,11 42 40f
8 7 6
Drawing Not to Scale
Entry Hatch
Overflow
Telemetry
Common Inlet/Outlet
Man Entry
Water Tap
Drain/Scour
Cathodic Protection Anode
Air Vent
12:00
1:00
2:00
3:00
4:00
5:00
6:00
7:00
8:00
9:00
10:00
11:00
Liquivision Technology - Inspection Report – December 8, 2021- Page 7
Image #1
Exterior Base
Condition:
Concrete Deform3 GC.
Description:
Exterior Base appeared to be in good condition with no concrete problems.
Image #2
Exterior Wall
Rust Grade1 8.
Exterior Wall appeared to be in good condition with a minor amount of corrosion.
Liquivision Technology - Inspection Report – December 8, 2021- Page 8
Image #3
Rust Grade1 9.
Water Tap appeared to be in
Image #4
Liquivision Technology - Inspection Report – December 8, 2021- Page 9
Image #5
Image #6
Man Way
Man Way appeared to be in
Liquivision Technology - Inspection Report – December 8, 2021- Page 10
Image #7
Image #8
Liquivision Technology - Inspection Report – December 8, 2021- Page 11
Image #9
Water Tap appeared to be in
Image #10
Overflow appeared to be in good condition with a minor amount of corrosion.
Liquivision Technology - Inspection Report – December 8, 2021- Page 12
Image #11
Image #12
Drain
Drain appeared to be in good
Liquivision Technology - Inspection Report – December 8, 2021- Page 13
Image #13
Image #14
Liquivision Technology - Inspection Report – December 8, 2021- Page 14
Image #15
Telemetry Penetration
Telemetry Penetration appeared to be in good condition with a minor amount of corrosion.
Image #16
Liquivision Technology - Inspection Report – December 8, 2021- Page 15
Image #17
Telemetry
Image #18
Stairs
Stairs appeared to be in good
Liquivision Technology - Inspection Report – December 8, 2021- Page 16
Image #19
Image #20
Entry Hatch
Entry Hatch appeared to be in
Liquivision Technology - Inspection Report – December 8, 2021- Page 17
Image #21
Capped Off Penetration
Capped Off Penetration appeared to be in good condition with a minor amount of
Image #22
Telemetry Penetration
Telemetry Penetration appeared to be in good condition with a minor amount of corrosion.
Liquivision Technology - Inspection Report – December 8, 2021- Page 18
Image #23
Roof
Rust Grade1 7.
Roof appeared to be in good
Image #24
Roof 6:00
Roof appeared to be in fair
Liquivision Technology - Inspection Report – December 8, 2021- Page 19
Image #25
Roof 11:30
Roof appeared to be in fair
Image #26
Vent Center
Vent appeared to be in fair
Liquivision Technology - Inspection Report – December 8, 2021- Page 20
Image #27
Vent Center
Vent appeared to be in fair
Image #28
Vent
Rust Grade1 10.
Vent appeared to be in excellent condition with no signs of corrosion
Liquivision Technology - Inspection Report – December 8, 2021- Page 21
Image #29
Vent
Rust Grade1 10.
Vent appeared to be in excellent condition with no signs of
Image #30
Landing
Landing appeared to be in fair
Liquivision Technology - Inspection Report – December 8, 2021- Page 22
Image #31
Floor
Floor appeared to be in good
Image #32
Wall
Wall appeared to be in good
Liquivision Technology - Inspection Report – December 8, 2021- Page 23
Image #33
Reference Cell
Image #34
Cathodic Protection Anode
There was approximately 98% of the anode remaining.
Liquivision Technology - Inspection Report – December 8, 2021- Page 24
Image #35
Mixer
Image #36
Water Tap was in good condition. There was a minor amount of rust occurring at the penetration.
Liquivision Technology - Inspection Report – December 8, 2021- Page 25
Image #37
Image #38
Liquivision Technology - Inspection Report – December 8, 2021- Page 26
Image #39
Image #40
Liquivision Technology - Inspection Report – December 8, 2021- Page 27
Image #41
Image #42
Water Tap appeared to be in fair
Liquivision Technology - Inspection Report – December 8, 2021- Page 28
Image #43
Image #44
Liquivision Technology - Inspection Report – December 8, 2021- Page 29
Image #45
Image #46
Liquivision Technology - Inspection Report – December 8, 2021- Page 30
Image #47
Altitude Port
Altitude Port appeared to be in fair condition with a minor
Image #48
Inlet / Outlet
Inlet / Outlet appeared to be in
Liquivision Technology - Inspection Report – December 8, 2021- Page 31
Image #49
Column
Column appeared to be in good
Image #50
Column
Column appeared to be in good
Liquivision Technology - Inspection Report – December 8, 2021- Page 32
Image #51
Ceiling
Ceiling appeared to be in good
Image #52
Liquivision Technology - Inspection Report – December 8, 2021- Page 33
Image #53
Image #54
Sediment
There was approximately 1/16” of sediment removed from the floor.
Liquivision Technology - Inspection Report – December 8, 2021- Page 34
REFERENCES:
Standard Method of Evaluating Degree of Rusting on Painted Steel Surfaces
– SSPC-Vis 2-82 & ASTM D 610-85 (1989)
The graphical representations show examples of area percentages, which may be helpful in rust grading.
The use of photographical reference standards requires the following precautions:
1. Some finishes are stained by rust. This staining must not be confused with the actual rusting involved.
2. Accumulated dirt or other material may make accurate determination of the degree of rusting difficult.
3. Certain types of deposited dirt that contain iron or iron compounds may cause surface discoloration that should not be mistaken for corrosion.
4. It must be realized that failure may vary over a given area and discretion must therefore be used in applying these reference standards.
5. In evaluating surfaces, consideration shall be given to the color of the finish coating, since failures will be more apparent on a finish that shows color contrast with rust, such as white, than on a similar color, such as iron oxide finish.
6. The photographic reference standards are not required for use of the rust-grade scale since the scale is based upon the percent of the area rusted and any method of assessing area rusted may be used to determine the rust grade.
Rust Grades Description Graphical Representation
No rusting or less than 0.01% of surface rusted Unnecessary
Minute rusting, less than 0.03% of surface rusted
Few isolated rust spots, less than 0.1% of surface rusted
Less than 0.3% of surface rusted
Extensive rust spots, but less than 1% of surface rusted
Liquivision Technology - Inspection Report – December 8, 2021- Page 35
Rusting to the extent of 3% of surface rusted
Rusting to the extent of 10% of
Approximately one sixth of the surface rusted (16%)
Approximately one third of the surface rusted (33%)
Approximately one half of the surface rusted (50%)
Approximately 100% of the
Unnecessary