This is a Comcheck Report prepared for the Utah National Guard's Camp Williams Building 21 Upgrade project managed by the State of Utah's Division of Facilities Construction and Management (DFCM). The project encompasses a comprehensive building repair and renovation with a construction cost estimate of $2,400,000.00. The scope of work includes replacement of all exterior windows, storefront, and doors; roof framing; electrical devices, wiring, and panels from the electrical main distribution panel; ceiling tiles and flooring covering; metal soffit and rain gutters with downspouts; installation of a standing metal seam roof; updates to latrines and showers; HVAC system installation; and application of EFIS exterior wall finish over the entire building envelope. Additionally, the floor plan will be updated to accommodate users' needs and comply with current code requirements.
This Stage II Invitation to Bid is restricted to contractors who have been prequalified under DFCM's Stage I Prequalification for Contractors and appear on the current DFCM Prequalified Contractors list as of the solicitation date. The Comcheck Report documents energy code compliance analysis for the proposed construction work, serving as technical documentation to support the project's design and bidding process. No specific bid due dates, site visit requirements, or bidders' meetings are detailed in this report document itself, as it functions as a technical supporting exhibit rather than the primary bid solicitation notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 1 of 21
Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
2021 IECC
25062 Camp Williams Building 21 Remodel Bluffdale, Utah 5b Alteration 102516 false false false false false
Construction Site: Owner/Agent: Designer/Contractor:
17800 S. Redwood Rod Bluffdale , Utah 84065
Kevin Miller 2505 E Parleys Way Architectural Nexus Salt Lake City , Utah 84109 801-924-5032 kmiller@archnexus.com
Notes:
Energy Credits
Description Credit
Building Area
Description Floor Area
1-Office (Office) : Nonresidential 5432
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 2 of 21
Envelope Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
Vertical Glazing / Wall Area:
2021 IECC
25062 Camp Williams Building 21 Remodel Bluffdale, Utah 5b Alteration 0.120
Construction Site: Owner/Agent: Designer/Contractor:
17800 S. Redwood Rod Bluffdale , Utah 84065
Kevin Miller 2505 E Parleys Way Architectural Nexus Salt Lake City , Utah 84109 801-924-5032 kmiller@archnexus.com
Envelope Assemblies
Post-Alteration Assembly Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Proposed
SHGC
Max Allowed U-Factor
Max Allowed
SHGC
Roof:Roof, [Bldg. Use 1 - Office] 6442 --- 36.00 0.027 --- 0.032 ---
NORTH
Ext Wall:2"EIFS - N,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
104 0.00 8.00 0.090 --- 0.090 ---
Window:Window - N, Other, Fixed, Fixed, [Bldg. Use 1 - Office]
48 --- --- 0.360 0.27 0.360 0.46
Ext Wall:3"EIFS - N,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
308 0.00 12.00 0.066 --- 0.090 ---
EAST
Ext Wall:4" EIFS - E,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
74 0.00 16.00 0.052 --- 0.090 ---
Ext Wall:3" EIFS - E,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
797 0.00 12.00 0.066 --- 0.090 ---
Ext Wall:2" EIFS - E,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
211 0.00 8.00 0.090 --- 0.090 ---
Window:Window - E, Other, Fixed, Fixed, [Bldg. Use 1 - Office]
96 --- --- 0.360 0.27 0.360 0.46
Door:Door - E, Entrance Door, Entrance Door, [Bldg. Use 1 - Office]
44 --- --- 0.290 0.27 0.630 0.46
SOUTH
Ext Wall:2"EIFS - S,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
130 0.00 8.00 0.090 --- 0.090 ---
Window:Window - S, Other, Fixed, Fixed, [Bldg. Use 1 - Office]
60 --- --- 0.360 0.27 0.360 0.46
Ext Wall:3" EIFS - S,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
281 0.00 12.00 0.066 --- 0.090 ---
WEST
Ext Wall:3" EIFS - W,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
792 0.00 12.00 0.066 --- 0.090 ---
Ext Wall:2" EIFS - W,Normal Density , Furring: Metal, [Bldg. Use 1 - Office]
292 0.00 8.00 0.090 --- 0.090 ---
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 3 of 21
Post-Alteration Assembly Gross Area or Perimeter
Cavity R- Value
Cont.
R- Value
Proposed U-Factor
Proposed
SHGC
Max Allowed U-Factor
Max Allowed
SHGC
Window:Window - W, Other, Fixed, Fixed, [Bldg. Use 1 - Office]
108 --- --- 0.360 0.27 0.360 0.46
Door:Door - W, Swinging, [Bldg. Use 1 - Office]
47 --- --- 0.370 --- 0.370 ---
(a) Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
Envelope PASSES
Envelope Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed envelope systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date kmiller Image kmiller Text Box Kevin Miller - Architect kmiller Text Box 5/13/26
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 4 of 21
Interior Lighting Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2021 IECC
25062 Camp Williams Building 21 Remodel Bluffdale, Utah 5b Alteration
Construction Site: Owner/Agent: Designer/Contractor:
17800 S. Redwood Rod Bluffdale , Utah 84065
Kevin Miller 2505 E Parleys Way Architectural Nexus Salt Lake City , Utah 84109 801-924-5032 kmiller@archnexus.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area (ft2) Allowed Watts / ft2 Allowed Watts
1-Space (Common Space Types:Office - Enclosed) 5432 0.74
Total Allowed Watts: 4020
Proposed Interior Lighting Power
A B C D
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
# of Fixture Fixture Watt. (B X C)
1-Space (Common Space Types:Office - Enclosed)
A1/A1E: A1/A1E: LED: 68 26 1768
B1: B1: LED: 5 33 165
C2: C2: LED: 2 7.5 15
P1: P1: LED: 3 60 180
R1: R1: LED: 7 28.8 201.6
R2: R2: LED: 4 38.4 153.6
V1: V1: LED: 2 17 34
Total Proposed Watts: 2517.2
Proposed Interior Lighting Controls
Fixture Lighting Control
1-Space (Common Space Types:Office - Enclosed)
A1/A1E: A1/A1E: LED: Occupancy Sensor, Manual Control
B1: B1: LED: Occupancy Sensor, Manual Control
C2: C2: LED: Occupancy Sensor, Manual Control
P1: P1: LED: Occupancy Sensor, Manual Control
R1: R1: LED: Occupancy Sensor, Manual Control
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 5 of 21
Fixture Lighting Control
R2: R2: LED: Occupancy Sensor, Manual Control
V1: V1: LED: Occupancy Sensor, Manual Control
Interior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date
Trevor Stott - Electrical Engineer 05/14/2026
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 6 of 21
Mechanical Compliance Certificate
Project Information
Energy Code:
Project Title:
Location:
Climate Zone:
Project Type:
2021 IECC
25062 Camp Williams Building 21 Remodel Bluffdale, Utah 5b Alteration
Construction Site: Owner/Agent: Designer/Contractor:
17800 S. Redwood Rod Bluffdale , Utah 84065
Kevin Miller 2505 E Parleys Way Architectural Nexus Salt Lake City , Utah 84109 801-924-5032 kmiller@archnexus.com
Mechanical Systems List
Quantity Component Description
HVAC Systems
1 VRCU-1 (Unknown): VRF Condensing Unit, Air Cooled w/ Heat Recovery Heat Pump Heating Mode: Capacity = 270 kBtu/h, Proposed Efficiency = 3.75 COP, Required Efficiency = 3.20 COP Cooling Mode: Capacity = 240 kBtu/h, Proposed Efficiency = 23.00 EER, Required Efficiency = 9.30 EER Proposed Part Load Efficiency = 13.15 IEER, Required Part Load Efficiency = 12.50 IEER Fan System: None
2 VRF Fan Coil 1 (Single Zone):
Cooling: 2 each - VRF Zone Fan Unit (VRFC-1,2), Capacity = 48 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
11 VRF Fan Coil (Single Zone):
Cooling: 1 each - VRF Zone Fan Unit (VRFC-3,5,6,25,26,7,8,11,12,13,17), Capacity = 5 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
4 VRF Fan Coil 2 (Single Zone):
Cooling: 4 each - VRF Zone Fan Unit (VRFC-18,14,15,16), Capacity = 8 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
2 VRF Fan Coil 3 (Single Zone):
Cooling: 2 each - VRF Zone Fan Unit (VRFC-7,8), Capacity = 12 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
1 VRF Fan Coil 4 (Single Zone):
Cooling: 1 each - VRF Zone Fan Unit (VRFC-20), Capacity = 15 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
3 VRF Fan Coil 5 (Single Zone):
Cooling: 3 each - VRF Zone Fan Unit (VRFC-9,10,19), Capacity = 18 kBtu/h, No Economizer, Economizer exception: VRF systems installed with a DOAS No minimum efficiency requirement applies Fan System: Unspecified
Water Heaters
1 WH-1: Gas Storage Water Heater, Capacity: 50 gallons, Input Rating: 100 kBtu/h Proposed Efficiency: 95.00 % Et, Required Efficiency: 80.00 % Et
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 7 of 21
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been designed to meet the 2021 IECC requirements in COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist.
Name - Title Signature Date drevels Typewritten Text Darrin Revels drevels Typewritten Text 05/14/2026 drevels Pen Dan drevels Pen . Rael
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 8 of 21
Inspection Checklist
Energy Code: 2021 IECC
Requirements: 0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Plan Review
Section
& Req.ID Plan Review Complies? Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.2
[PR14]1
In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non-refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent.
Complies
Does Not Comply
Not Observable
Not Applicable
C103.2
[PR2]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical and service water heating systems and document where exceptions to the standard are claimed.
Load calculations per acceptable engineering standards and handbooks. Hot water system sized per manufacturer's sizing guide.
Complies
Does Not Comply
Not Observable
Not Applicable
C103.2
[PR4]1
Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30 percent of the gross above-grade wall area.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.1
[PR11]1
The skylight area <= 3 percent of the gross roof area.
Complies
Does Not Comply
Not Observable
Not Applicable
Additional Comments/Assumptions:
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 9 of 21
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 10 of 21
Footing / Foundation Inspection
Section # & Req.ID Footing / Foundation Inspection Complies? Comments/Assumptions
C303.2.1
[FO6]1
Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.13.2, C403.13.3
[FO9]3
Snow/ice melting system and freeze protection systems have sensors and controls configured to limit service for pavement temperature above 50F and outdoor temperature above 40F.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 11 of 21
Framing / Rough-In Inspection
Section # & Req.ID Framing / Rough-In Inspection Complies? Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in accordance with NFRC certified and as to performance labels or certificates provided.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.4
[FR18]3
Factory-built fenestration and doors are labeled as meeting air leakage requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.9
[FR17]3
Vestibules are installed on all building entrances. Doors have self-closing devices.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value. Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.4.3, C402.4.3.4
[FR8]1
Installed vertical fenestration U-factor and SHGC consistent with label specifications and as reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.4.5
[FR14]2
U-factor of opaque swinging and nonswinging doors associated with the building thermal envelope meets requirements.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.1
[FR16]1
The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 12 of 21
Plumbing Rough-In Inspection
Section # & Req.ID Plumbing Rough-In Inspection Complies? Comments/Assumptions
C404.5, C404.5.1, C404.5.2 [PL6]3
Heated water supply piping conforms to pipe length and volume requirements.
Refer to section details.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 13 of 21
Mechanical Rough-In Inspection
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.7, C403.7.7
[ME3]3
Stair and elevator shaft vents have motorized dampers that automatically close.
Reference section C403.7.7 for operational details.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.2.2
[ME59]1
Natural or mechanical ventilation is provided in accordance with International Mechanical Code Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply to minimum per IMC Chapter 4.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.1
[ME59]1
Demand control ventilation provided for spaces >500 ft2 and >15 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.2
[ME115]3
Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.6
[ME141]3
HVAC systems serving guestrooms in Group R-1 buildings with > 50 guestrooms:
Each guestroom is provided with controls that automatically manage temperature setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2).
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.4
[ME57]1
Exhaust air energy recovery on systems meeting Table C403.7.4(1) and C403.7.4(2).
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.5
[ME116]3
Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.12.1, C403.12.2
[ME60]2
HVAC ducts and plenums insulated in accordance with C403.11.1 and constructed in accordance with C403.11.2, verification may need to occur during Foundation Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.7.7
[ME58]3
Outdoor air and exhaust systems have motorized dampers that automatically shut when not in use and meet maximum leakage rates. Check gravity dampers where allowed. Reference section language for operational details.
Complies
Does Not Comply
Not Observable
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 14 of 21
Section # & Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.4.3.3.2
[ME121]3
Closed-circuit cooling tower within heat pump loop have either automatic bypass valve or lower leakage positive closure dampers. Open-circuit tower within heat pump loop have automatic valve to bypass all heat pump water flow around the tower.
Open- or closed-circuit cooling towers used in conjunction with a separate heat exchanger have heat loss by shutting down the circulation pump on the cooling tower loop. Open- or closed circuit cooling towers have a separate heat exchanger to isolate the cooling tower from the heat pump loop, and heat loss is controlled by shutting down the circulation pump on the cooling tower loop.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.12.3
[ME61]2
HVAC piping insulation insulated in accordance with Table C403.11.3.
Insulation exposed to weather is protected from damage and is provided with shielding from solar radiation.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.4
[ME63]2
Heating for vestibules and air curtains with integral heating include automatic controls that shut off the heating system when outdoor air temperatures > 45F. Vestibule heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint <= 60F and cooling setpoint >= 80F.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.1
[ME65]3
HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
C404.2.1
[ME111]2
Gas-fired water-heating equipment installed in new buildings: where a singular piece of water-heating equipment >= 1,000 kBtu/h serves the entire building, thermal efficiency >= 92 Et. Where multiple pieces of water-heating equipment serve the building with combined rating >= 1,000 kBtu/h, the combined input-capacity-weighted-average thermal efficiency >= 90 Et. Exclude input rating of equipment in individual dwelling units and equipment <= 100 kBtu/h.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.2.1
[ME53]3
Air outlets and zone terminal devices have means for air balancing.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.11.3, C403.11.3.1, C403.11.3.2
[ME123]3
Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.11.3.1 and refrigeration compressor systems that comply with C403.11.3.2..
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 15 of 21
& Req.ID Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.8.3
[ME117]2
Fans have a fan energy index (FEI) >= 1.00.
Variable volume fans will have an FEI >= 0.95.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.9
[ME144]2
Large diameter fans where installed shall be tested and labeled in accordance with
AMCA 230.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.13.1
[ME71]2
Systems that heat outside the building envelope are radiant heat systems controlled by an occupancy sensing device or timer switch.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.3
[ME55]2
HVAC equipment efficiency verified. Complies
Does Not Comply
Not Observable
Not Applicable
See the Mechanical Systems list for values
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 16 of 21
Rough-In Electrical Inspection
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.3.1
[EL22]1
Spaces required to have light-reduction controls have a manual control that allows the occupant to reduce the connected lighting load in a reasonably uniform illumination pattern >= 50 percent.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.7
[EL26]2
Low-voltage dry-type distribution electric transformers meet the minimum efficiency requirements of Table C405.6.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.8
[EL27]2
Electric motors meet the minimum efficiency requirements of Tables C405.7(1) through C405.7(4). Efficiency verified through certification under an approved certification program or the equipment efficiency ratings shall be provided by motor manufacturer (where certification programs do not exist).
Complies
Does Not Comply
Not Observable
Not Applicable
C405.9.1, C405.9.2
[EL28]2
Escalators and moving walks comply with ASME A17.1/CSA B44 and have automatic controls configured to reduce speed to the minimum permitted speed in accordance with ASME A17.1/CSA B44 or applicable local code when not conveying passengers.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.10
[EL29]2
Total voltage drop across the combination of feeders and branch circuits <= 5%.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.1.1
[EL30]2
At least 90% of dwelling unit permanently installed lighting shall have lamp efficacy >= 65 lm/W or luminaires with efficacy >= 45 lm/W or comply with C405.2.4 or C405.3.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.11, C405.11.1
[EL31]2
50% of 15/20 amp receptacles installed in enclosed offices, conference rooms, copy rooms, break rooms, classrooms and workstations and > 25% of branch circuit feeders for modular furniture will have automatic receptacle control in accordance with C405.11.1.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.1, C405.2.1.1
[EL18]1
Occupancy sensors installed in classrooms/lecture/training rooms, conference/meeting/multipurpose rooms, copy/print rooms, lounges/breakrooms, enclosed offices, open plan office areas, restrooms, storage rooms, locker rooms, corridors, warehouse storage areas, and other spaces <= 300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.1.2
[EL19]1
Occupancy sensors control function in warehouses: In warehouses, the lighting in aisleways and open areas is controlled with occupant sensors that automatically reduce lighting power by 50% or more within 20 minutes of when the areas are unoccupied.
The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time-switch.
Complies
Does Not Comply
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 17 of 21
Section
& Req.ID Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.1.3
[EL20]1
Occupant sensor control function in open plan office areas: Occupant sensor controls in open office spaces >= 300 sq.ft. have controls 1) configured so that general lighting can be controlled separately in control zones with floor areas <= 600 sq.ft. within the space, 2) general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by >= 80% of the full zone general lighting power within 20 minutes of all occupants leaving that control zone.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.2, C405.2.2.1
[EL21]2
Each area not served by occupancy sensors (per C405.2.1.1) have time-switch controls and functions detailed in sections C405.2.2.1.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.4, C405.2.4.1, C405.2.4.2
[EL23]2
Daylight zones provided with individual controls that control the lights independent of general area lighting. See code section C405.2.3 Daylight-responsive controls for applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone.
Complies
Does Not Comply
Not Observable
Not Applicable
C405.2.5
[EL27]1
Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting.
Complies
Does Not Comply
Not Observable
Not Applicable
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 18 of 21
Insulation Inspection
Section
& Req.ID Insulation Inspection Complies? Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per manufacturer’s instructions and is labeled with R-value or insulation certificate providing R-value and other relevant data. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.2.1
[IN20]1
Roof assembly meets minimal thermal resistance installed between roof framing or in a continuous fashion on the roof assembly as stipulated in Table C402.1.3. Requirements for above deck insulation, minimum thickness, suspended ceilings, staggered joints and skylight curbs will be met.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.2.6
[IN18]3
Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5.
Complies
Does Not Comply
Not Observable
Not Applicable
C105 [IN2]1 Installed roof insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports. For some ceiling systems, verification may need to occur during Framing Inspection.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
C402.5.1.1
[IN1]1
All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor-permeable wrapping material to minimize air leakage.
Complies
Does Not Comply
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed per manufacturer’s instructions.
Complies
Does Not Comply
Not Observable
Not Applicable
C105 [IN6]1 Installed above-grade wall insulation type and R-value consistent with insulation specifications reported in plans and COMcheck reports.
Complies
Does Not Comply
Not Observable
Not Applicable
See the Envelope Assemblies table for values
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 19 of 21
Final Inspection
Section # & Req.ID Final Inspection Complies? Comments/Assumptions
C303.3, C408.2.5.2
[FI17]3
Furnished O&M instructions for systems and equipment to the building owner or designated representative.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1
[FI47]3
Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.1
[FI42]3
Heat pump controls prevent supplemental electric resistance heat from coming on when not needed.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.2
[FI38]3
Thermostatic controls have a 5 °F deadband. Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.1.3
[FI20]3
Temperature controls have setpoint overlap restrictions.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.2
[FI39]3
Each zone equipped with setback controls using automatic time clock or programmable control system.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.4.2.1, C403.4.2.2
[FI40]3
Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2-hour occupant override, 10-hour backup
Complies
Does Not Comply
Not Observable
Not Applicable
C404.3
[FI11]3
Heat traps installed on supply and discharge piping of non-circulating systems.
Complies
Does Not Comply
Not Observable
Not Applicable
C303.3, C408.2.5.3
[FI8]3
Furnished O&M manuals for HVAC systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
C401.3
[FI58]1
A thermal envelope certificate will be supplied and completed by an approved third party.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.1.1
[FI57]1
Building operations and maintenance documents will be provided to the owner.
Documents will cover manufacturers' information, specifications, programming procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated.
Complies
Does Not Comply
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 20 of 21
& Req.ID Final Inspection Complies? Comments/Assumptions
C408.2.1
[FI28]1
Commissioning plan developed by registered design professional or approved agency.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.3.1
[FI31]1
HVAC equipment, systems and system-to-system relationships have been tested to ensure proper operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.3.2
[FI10]1
HVAC and service water heating control systems have been tested to ensure proper operation, calibration and adjustment of controls.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.4
[FI29]1
Preliminary commissioning report completed and certified by registered design professional or approved agency.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5
[FI7]3
Furnished HVAC as-built drawings submitted within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5
[FI16]3
Furnished as-built drawings for electric power systems within 90 days of system acceptance.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5.1
[FI43]1
An air and/or hydronic system balancing report is provided for HVAC systems.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.2.5.2
[FI30]1
Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy.
Complies
Does Not Comply
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.10
[FI26]3
Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled.
Seal between interior finish and luminaire housing.
Complies
Does Not Comply
Not Observable
Not Applicable
C402.5.11
[FI59]1
Operable openings > 40 ft2 will be interlocked with heating and cooling systems to setback setpoint temperatures within 10 minutes of opening.
Complies
Does Not Comply
Report Title: 25062 Camp Williams Building 21 Remodel Report Date: May 13, 2026, 02:44 PM (PDT) 21 of 21
& Req.ID Final Inspection Complies? Comments/Assumptions
C402.5.8
[FI37]1
Weatherseals installed on all loading dock cargo door openings and provide direct contact along the top and sides of vehicles parked in the doorway.
Complies
Does Not Comply
Not Observable
Not Applicable
C403.1.1
[FI50]3
HVAC systems and equipment design loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or by an approved equivalent computational procedure
Complies
Does Not Comply
Not Observable
Not Applicable
C403.3.1
[FI27]3
HVAC systems and equipment capacity does not exceed calculated loads.
Complies
Does Not Comply
Not Observable
Not Applicable
| 2026-05-14T12:47:57-0600 | |
| Trevor Stott |
File details come from the government source that posted it. Updated .