8-02.1 Items- Measurement Payment.docx
DOCX document 2 MB Posted
- Solicitation number
- UDOT250326MP- 2026
- Issued by
- Utah
About this file
Summary of Measurement & Payment Document and Related RFSQ
This is a Measurement and Payment specification document from the Utah Department of Transportation (UDOT) outlining bid items, unit measurements, and payment terms for installation, upgrade, or repair of concrete paving, barrier, and general flatwork projects across all 29 Utah counties. The document details approximately 190 line items covering mobilization (separated by county), traffic control, erosion control, site preparation, concrete construction, drainage infrastructure, and miscellaneous work. Payment methodologies vary by item type, including lump sum, per linear foot, per square yard, per square foot, per cubic yard, per hour, per ton, per day, and per unit. All work must comply with UDOT Standard Drawings and Specifications, with supplemental specifications and drawings available through the UDOT website. The related RFSQ solicitation is for Stage 1 Qualification/Re-qualification to establish an Approved Vendor List (AVL) of qualified firms; pricing will be requested in a subsequent stage. Suppliers approved through this process will maintain qualified status for 12 months, after which requalification is mandatory. The existing AVL list expires August 31, 2030, with anticipated extension to November 30, 2030, and the solicitation may reopen at UDOT's discretion for additional vendors or requalification cycles.
No specific pricing terms, set-asides, incumbent contractors, funding amounts, or contract award dates are identified in these documents. The document serves primarily as a comprehensive payment schedule and qualification framework rather than a detailed procurement solicitation with pricing information. All work is subject to State Representative approval and compliance with current UDOT standards and specifications, with payment contingent upon work meeting required standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-05. Submittal Form- Attachment A- Agency Terms and Conditions- Yes No.docx | DOCX document | |
| 9-07. Submittal Form- Certifications- Yes No.docx | DOCX document | |
| 3-10. Sample Qualifications Evaluation Sheet.doc | DOC document | |
| 1-08. Title VI.docx | DOCX document | |
| 10-03. Submittal Form- Vendor Set Up Form And W-9.pdf | ||
| 4-01. AVL General Solicitation Information- Concrete.doc | DOC document | |
| 7-02.2 Template- Type II.docx | DOCX document | |
| 6-06. Submittal Form- Itemized Price List.xlsx | XLSX spreadsheet | |
| 2-04. Submittal Form- Business Confidentiality- Yes No.doc | DOC document | |
| 11-02.0 Scope of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Measurement & Payment
Installation, Upgrade, or Repair of Concrete Paving, Barrier, and General Flatwork
See UDOT Standard Drawings and Specifications, found here:
https://udot.utah.gov/connect/business/standards/.
Supplemental Specifications and Supplemental Drawings can be found at:
https://udot.utah.gov/connect/business/standards/
UDOT Guidelines for Crash Cushions & Barrier End Treatments can be found at:
https://drive.google.com/file/d/1fZDWhIqGRczHcbtx2eXBdg9iXud1jk2a/view
General Notes:
1. The Department will not make payments for items not in compliance with standard drawings and standard specifications
2. See Attachment F for special provision specifications.
| 1. 1 |
| Mobilization - Box Elder County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
E. Includes time and travel for project related meetings.
| 2. 1 |
| Mobilization - Cache County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 3. 1 |
| Mobilization - Davis County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 4. 1 |
| Mobilization - Morgan County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 5. 1 |
| Mobilization - Rich County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 6. 1 |
| Mobilization - Weber County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 7. 1 |
| Mobilization - Salt Lake County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 8. 1 |
| Mobilization - Summit County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 9. 1 |
| Mobilization - Tooele West County (I-80, MP 0 - 80) |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 10. 1 |
| Mobilization - Tooele East County (I-80, MP 80 - 102) |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 11. 1 |
| Mobilization - Daggett County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 12. 1 |
| Mobilization - Duchesne County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 13. 1 |
| Mobilization - Juan County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 14. 1 |
| Mobilization - Uintah County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 15. 1 |
| Mobilization - Utah County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 16. 1 |
| Mobilization - Wasatch County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 17. 1 |
| Mobilization - Beaver County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 18. 1 |
| Mobilization - Carbon County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 19. 1 |
| Mobilization - Emery County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 20. 1 |
| Mobilization - Garfield County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 21. 1 |
| Mobilization - Grand County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 22. 1 |
| Mobilization - Iron County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 23. 1 |
| Mobilization - Kane County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 24. 1 |
| Mobilization - Millard County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 25. 1 |
| Mobilization - Piute County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 26. 1 |
| Mobilization - San Juan County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 27. 1 |
| Mobilization - Sanpete County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 28. 1 |
| Mobilization - Sevier County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 29. 1 |
| Mobilization - Washington County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 30. 1 |
| Mobilization - Wayne County |
| Lump |
A. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, materials, and incidentals to each work site before beginning work.
B. Includes labor and operations which must be performed before beginning other items under the Contract.
C. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
D. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
| 31. 1 |
| Mobilization for Emergency Work (additional to Items 1-28) |
| Lump |
A. Paid in addition to items 1-28 for mobilization to an "Emergency" site as directed by the State Representative.
B. Includes mobilization, preparatory work and operations necessary for moving personnel, equipment, supplies, and incidentals to each work site before beginning work.
C. Includes labor and operations which must be performed before beginning other items under the Contract.
D. Includes removal of personnel, equipment, and supplies from each work site at the completion of the work.
E. Includes work that is not included with other items under the Contract such as cleanup and restoration of disturbed areas.
F. Includes time and travel for pre-construction meetings.
| 32. 1 |
| Traffic Control for Beyond Shoulder |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal.
| 33. 1 |
| Traffic Control for Shoulder Closure |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal of closures up to one half mile in length (work space).
| 34. 1 |
| Traffic Control for Single Lane Closure |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal of closures up to one half mile in length (work space).
| 35. 1 |
| Traffic Control for Sidewalk Closure |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal.
| 36. 1 |
| Traffic Control - Freeway/Expressway Shoulder Closure |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal of closures up to one half mile in length (work space).
| 37. 1 |
| Traffic Control - Freeway/Expressway Lane Closure |
| Each |
Includes preparation and submission of traffic control plans for approval. Includes transport of all traffic control materials to/from project site. Includes all labor, equipment, and materials for initial set up, maintaining traffic control, and final removal of closures up to one half mile in length (work space).
| 38. 1 |
| Flagging |
| Hour |
Provide necessary certified personnel for flagging operations as approved by the State Representative.
| 39. 1 |
| Additional Advance Warning Arrow Panel |
| Dev/Day |
This item is intended as additional warning within a full TC closure or as requested by the State Representative. Includes transport, labor and equipment for set up, maintenance, and removal of arrow board.
| 40. 1 |
| Variable Message Sign (VMS) |
| Dev/Day |
Includes but not limited to VMS and static signs on interstate, ramps, state route, and adjacent arterials necessary to warn traffic, bicyclists, and recreational roadway uses of future and current construction. Includes transport, labor and equipment for set up, maintenance, and removal of VMS sign.
| 41. 1 |
| Additional Static Sign |
| Dev/Day |
This item is intended as additional warning within a full TC closure or as requested by the State Representative. Includes set up, maintenance, and removal of sign.
| 42. 1 |
| Construction Zone Crash Cushion or Temporary End Treatment |
| Each |
Includes set up, maintenance and removal.
| 43. 1 |
| Check Dam |
| Linear Foot |
Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal. Includes use of stone or fiber roll check dams. Measured along the centerline of the check dam.
| 44. 1 |
| Drop-inlet Barrier |
| Each |
Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal. Fiber Roll or drop-inlet upon approval of the State Representative.
| 45. 1 |
| Fiber Roll |
| Linear Foot |
Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal. Fiber Roll or drop-inlet upon approval of the State Representative.
| 46. 1 |
| Silt Fence |
| Linear Foot |
Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal.
| 47. 1 |
| Slope Drain |
| Linear Foot |
A. Includes all materials, labor, and equipment necessary to complete the item, including maintenance and removal.
B. Includes directional berm, pipe end section, pipe, stakes, and riprap for outlet protection as shown in EN 3.
C. Sediment trap is not included.
| 48. 1 |
| Sediment Trap |
| Each |
Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal.
| 49. 1 |
| Temporary Berm |
| Linear Foot |
Measured along the centerline of the berm. Payment includes all costs for labor, equipment, and materials for installation, inspection, maintenance, and removal.
| 50. 1 |
| Site Clearing and Grubbing |
| Sq Yd |
Includes disposal of waste materials and backfilling of stump holes, cuts, depressions and other holes resulting from clearing and grubbing.
| 51. 1 |
| Landscape Grading |
| Sq Yd |
Includes grading and compacting of existing material to top of constructed hardscape and blend into slope.
| 52. 1 |
| Contractor Furnished Topsoil |
| Sq Yd |
Includes placement and spreading of topsoil at a 4 inch depth unless otherwise specified.
| 53. 1 |
| Landscaping Rock Mulch 2" to 4" |
| Ton |
Includes placement of landscaping rock mulch either to match existing materials or as specified by the State Representative over a weed barrier geotextile. Geotextile not included in payment of rock mulch. Contractor to obtain approval from the State Representative before placing.
| 54. 1 |
| Weed Barrier Geotextiles |
| Sq Yd |
Measurement does not include overlaps.
| 55. 1 |
| Erosion Control Blanket |
| Sq Yd |
A. Measurement along the slope and does not include overlaps.
B. Geotextile anchors at the crests and toes of the slope are incidental to work.
| 56. 1 |
| Broadcast Seed |
| Sq Yd |
Includes labor, material and equipment to place broadcast seed in accordance with approved specifications. Includes a hydroseeder, a cyclone seeder or other approved mechanical seeder. Includes incorporating the seed into the soil via cat-tracking, hand raking or slope chaining.
| 57. 1 |
| Turf Sod |
| Sq Yd |
Includes labor, material, equipment and fertilizer. Includes leveling, rolling, raking and watering areas for turf sod.
| 58. 1 |
| Irrigation - Sch 40 1-1/2" PVC Pipe w/ Fittings |
| Linear Foot |
A. Includes labor, material, equipment and trenching to place lateral lines from valves to sprinkler heads.
B. Includes receipt of a letter of acceptance from the property owner for all irrigation system components, corresponding configuration and changes.
C. Includes all glues, primers, teflon tape, etc as necessary to assemble mainline and lateral lines in accordance with manufacturer's recommendations.
D. Includes pressure testing irrigation lines and repair of any leaks.
E. Includes backfilling and compacting irrigation trenches.
| 59. 1 |
| Irrigation - Sch 40 3/4" PVC Pipe w/ Fittings |
| Linear Foot |
A. Includes labor, material, equipment and trenching to place lateral lines from valves to sprinkler heads.
B. Includes receipt of a letter of acceptance from the property owner for all irrigation system components, corresponding configuration and changes.
C. Includes all glues, primers, teflon tape, etc as necessary to assemble mainline and lateral lines in accordance with manufacturer's recommendations.
D. Includes pressure testing irrigation lines and repair of any leaks.
E. Includes backfilling and compacting irrigation trenches.
| 60. 1 |
| Irrigation - Sprinkler Head w/ Riser |
| Each |
A. Includes labor, material, and equipment to install sprinkler heads and risers.
B. Includes receipt of a letter of acceptance from the property owner for all irrigation system components, corresponding configuration and changes.
C. Includes all glues, primers, teflon tape, etc as necessary to install sprinkler heads and risers.
D. Includes testing sprinkler heads, risers and repair of any leaks or components.
| 61. 1 |
| Concrete Profile Grinding |
| Sq Yd |
A. Includes labor and equipment to profile grind concrete surfaces.
B. Includes removal of all debris from the grinding process and for a swept clean finish.
| 62. 1 |
| Sawcutting |
| Inch Foot |
A. Includes all labor, equipment and materials required to sawcut roadway. Measured along the centerline of the cut..
| 63. 1 |
| General Earthwork Excavation |
| Cu Yd |
A. Contractor to obtain approval from the State Representative before utilizing this item.
B. Includes excavation of all material within the designated area, placement of excavated material onsite, removal and haul off of excess material.
C. Exclude from measurement and payment areas or items covered in other payment items.
| 64. 1 |
| Remove Concrete Curb and Gutter |
| Lin ft |
A. Includes all labor and equipment needed to remove concrete curb / gutter B. Includes removal of waste debris from the project site, but excludes dump fee.
C. Includes all labor and equipment needed to sawcut concrete.
| 65. 1 |
| Remove Concrete Flatwork (0- to 5-inch depth) |
| Sq Yd |
A. Includes all labor and equipment needed to remove concrete B. Includes removal of rebar, waste debris from the project site, but excludes dump fee.
| 66. 1 |
| Remove Concrete Flatwork (5- to 9-inch depth) |
| Sq Yd |
A. Includes all labor and equipment needed to remove concrete
| 67. 1 |
| Remove Concrete Flatwork (9-inch depth or greater) |
| Sq Yd |
A. Includes all labor and equipment needed to remove concrete.
| 68. 1 |
| Remove Concrete Slope Protection |
| Sq Yd |
A. Includes all labor and equipment needed to remove concrete.
B. Includes removal of reinforcing steel (usually a welded wire mesh) waste debris from the project site, but excludes dump fee.
| 69. 1 |
| Remove Asphalt Pavement |
| Sq Yd |
A. Includes all labor and equipment needed to remove asphalt pavement, regardless of the depth
C. Includes all labor and equipment needed to sawcut asphalt.
| 70. 1 |
| Remove Cast-In-Place Concrete Barrier |
| Linear Foot |
A. Includes removal of underlying pavement and saw cutting.
C. Includes all labor and equipment needed to sawcut concrete and remove concrete.
| 71. 1 |
| Remove Precast Concrete Barrier |
| Linear Foot |
A. Includes removal of connection pins and stabilization pins when present.
B. Includes disposal of barrier or salvaging transport as determined by the State Representative.
| 72. 1 |
| Remove Plowable End Section |
| Each |
A. Includes removal of waste debris from the project site, but excludes dump fee.
| 73. 1 |
| Lift Sidewalk or Driveway Panel |
| Sq Ft |
Includes labor, materials, and equipment needed to permanently lift a sidewalk or driveway panel with hydraulic cement concrete to be flush with adjacent panels or ground.
| 74. 1 |
| Relocate Slipbase Steel Post-Mounted Sign |
| Each |
Includes removal and disposal of existing sign base. Includes installation of top casting, stub base, concrete foundation, core drilling (if required), and all hardware to mount sign as required by SN Series Standard Drawings.
| 75. 1 |
| Relocate Sign Only |
| Each |
Includes frame or mounting bar and hardware as required in SN Series Standard Drawings.
| 76. 1 |
| Clean Asphalt or Clean Concrete Dump Fee |
| Ton |
A. Fees resulting from disposal of clean construction debris.
B. Transport of debris is paid separately (covered in corresponding removal items).
| 77. 1 |
| Landfill Dump Fee |
| Ton |
A. Fees resulting from disposal of miscellaneous construction debris.
B. Transport of debris is paid separately (covered in corresponding removal items).
| 78. 1 |
| Borrow |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, equipment and compaction.
| 79. 1 |
| Granular Borrow |
| Ton |
A. Calculated using weight tickets.
| 80. 1 |
| Untreated Base Course |
| Ton |
A. Calculated using weight tickets.
| 81. 1 |
| Free Draining Granular Backfill |
| Ton |
A. Calculated using weight tickets.
| 82. 1 |
| Flowable Fill |
| Cu Yd |
A. Measured using batch tickets.
B. Includes labor, material, and equipment.
| 83. 1 |
| Embankment for Bridge |
| Ton |
A. Calculated using weight tickets.
| 84. 1 |
| Hot Mix Asphalt - 1/2 inch |
| Ton |
A. Calculated from weight tickets.
B. Includes aggregates, asphalt binder, hydrated lime, tack coat, and other additives used in material mixing and installation.
| 85. 1 |
| Hot Mix Asphalt - 3/4 inch |
| Ton |
A. Calculated from weight tickets.
B. Includes aggregates, asphalt binder, hydrated lime, tack coat, and other additives used in material mixing and installation.
| 86. 1 |
| Highly Modified Hot Mix Asphalt |
| Ton |
A. Calculated from weight tickets.
B. Includes aggregates, asphalt binder, hydrated lime, tack coat, and other additives used in material mixing and installation.
| 87. 1 |
| High Early Strength Accelerator Adder to Any Concrete Items |
| Cu Yd |
A. Calculated using batch tickets B. Includes additional cost for high early strength for any cast-in-place concrete items.
C. Paid in addition to cast-in-place concrete item payments.
| 88. 1 |
| High Early Strength Accelerator Adder to Any Concrete Items (Delivery Only) |
| Cu Yd |
A. Calculated using batch tickets B. Includes additional cost for high early strength for any cast-in-place concrete items.
C. Paid in addition to cast-in-place concrete item payments.
| 89. 1 |
| Rapid Setting Hydraulic Cement Concrete |
| Cu Yd |
A. Includes labor to place and finish rapid setting hydraulic cement concrete.
B. Includes testing, trial batches, and material including but not limited to cement, aggregate, water, admixtures, and curing compound.
C. Includes equipment, fuel, and labor to operate a UDOT certified volumetric mixer.
D. Paid in addition to cast-in-place concrete item payments.
| 90. 1 |
| Rapid Setting Hydraulic Cement Concrete (Delivery Only) |
| Cu Yd |
A. Includes labor to place and finish rapid setting hydraulic cement concrete.
B. Includes testing, trial batches, and material including but not limited to cement, aggregate, water, admixtures, and curing compound.
C. Includes equipment, fuel, and labor to operate a UDOT certified volumetric mixer.
D. Paid in addition to cast-in-place concrete item payments.
| 91. 1 |
| Class I Riprap - 6" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
C. Geotextile fabric is paid separately.
| 92. 1 |
| Class II Riprap - 9" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 93. 1 |
| Class III Riprap - 12" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 94. 1 |
| Class IV Riprap - 15" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 95. 1 |
| Class V Riprap - 18" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 96. 1 |
| Class VI Riprap - 21" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 97. 1 |
| Class VII Riprap - 24" |
| Ton |
A. Calculated using weight tickets.
B. Includes labor, material, and equipment for excavation and grading required for placement of riprap.
| 98. 1 |
| Concrete Sidewalk |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes excavation and compaction.
C. Contractor to construct minimum sidewalk thickness to meet UDOT standards or match adjacent thicknesses, whichever is greater.
D. Includes all labor, equipment, and materials necessary for a complete sidewalk.
E. Includes untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 99. 1 |
| Concrete Driveway |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes excavation and compaction. Includes untreated base course.
C. Includes Radius and Flares. Contractor to match existing driveway type, flares or radius, unless otherwise directed.
D. Contractor to construct minimum driveway thickness to meet UDOT standards or match adjacent thicknesses, whichever is greater.
E. Includes all labor, equipment, and materials necessary for a complete driveway.
F. The curb cut will remain part of the curb and gutter installation.
G. Includes untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 100. 1 |
| Concrete Flatwork 4- to 5- inch thick |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes excavation and compaction C. Includes untreated base course. UTBC to be 4 inch thick or match adjacent thickness, whichever is greater.
| 101. 1 |
| Concrete Flatwork 6- to 7-inch thick |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes excavation and compaction.
C. Includes untreated base course. UTBC to be 4 inch thick or match adjacent thickness, whichever is greater.
| 102. 1 |
| Concrete Flatwork 8- to 9-inch thick |
| Sq Ft |
A. Calculated using the in-place surface area.
C. Includes untreated base course. UTBC to be 4 inch thick or match adjacent thickness, whichever is greater.
| 103. 1 |
| Concrete Flatwork 10-inch thick or greater |
| Sq Ft |
A. Calculated using the in-place surface area.
C. Includes untreated base course. UTBC to be 4 inch thick or match adjacent thickness, whichever is greater.
| 104. 1 |
| Concrete Slope Protection Repair |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes all labor, equipment, and materials necessary to construct or repair concrete slope protection.
C. Includes excavation and compaction.
| 105. 1 |
| Detectable Warning Surface (Polymer Composite Installation) |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes all labor, equipment, and materials necessary to remove and construct a detectable warning surface according to PA Series UDOT Standard Drawings.
| 106. 1 |
| Detectable Warning Surface (Precast Concrete Panel Installation) |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes all labor, equipment, and materials necessary to remove and construct a detectable warning surface according to PA Series UDOT Standard Drawings.
| 107. 1 |
| Detectable Warning Surface (Cast Iron Panel Installation) |
| Sq Ft |
A. Calculated using the in-place surface area.
B. Includes all labor, equipment, and materials necessary to remove and construct a detectable warning surface according to PA Series UDOT Standard Drawings.
| 108. 1 |
| Pedestrian Access Ramp |
| Sq Ft |
A. Calculated from in-place surface area of pedestrian ramp, including turning space, ramps, blended transition, flares, and monolithic curb at back of sidewalk.
B. Includes construction of corner pedestrian access ramps and perpendicular/parallel access ramps.
C. Includes all labor, equipment, materials, disposal, untreated base course, and incidental work to construct a complete pedestrian access ramp according to PA Series UDOT Standard Drawings.
D. Incidental work includes the removal and replacement of up to 20 sq ft of landscaping, and repair of irrigation and asphalt damaged to construct pedestrian access ramp.
E. The curb cut will remain part of the curb and gutter installation.
F. Includes untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
G. Does not include Detectable Warning Surface.
| 109. 1 |
| Concrete Curb and Gutter Type B1 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 110. 1 |
| Concrete Curb and Gutter Type B1 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 111. 1 |
| Concrete Curb and Gutter Type B2 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 112. 1 |
| Concrete Curb and Gutter Type B2 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 113. 1 |
| Concrete Curb Type B3 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes dowel bars and median reflectors.
| 114. 1 |
| Concrete Curb Type B3 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
| 115. 1 |
| Concrete Curb Type B4 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 116. 1 |
| Concrete Curb Type B4 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 117. 1 |
| Concrete Curb Type B5 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
| 118. 1 |
| Concrete Curb Type B5 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
| 119. 1 |
| Concrete Curb and Gutter Type M1 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 120. 1 |
| Concrete Curb and Gutter Type M1 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
| 121. 1 |
| Concrete Curb Type M2 - Less than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
| 122. 1 |
| Concrete Curb Type M2 - Greater than 50 feet |
| Linear Foot |
A. Measured along the roadway face.
| 123. 1 |
| Plowable End Section |
| Each |
A. Measured along the roadway face.
B. Includes excavation, compaction and untreated base course. UTBC to be 3 inch thick or match adjacent thickness, whichever is greater.
C. Includes median reflectors.
| 124. 1 |
| Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 42 Inch - Less than 100 feet |
| Linear Foot |
A. Form and cast-in-place barrier wall to match existing.
B. Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors.
| 125. 1 |
| Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 42 Inch - 100 to 1000 feet |
| Linear Foot |
A. Form and cast-in-place barrier wall to match existing.
| 126. 1 |
| Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 42 Inch - Greater than 1000 feet |
| Linear Foot |
A. Form and cast-in-place barrier wall to match existing.
| 1 | Cast-In-Place Concrete Constant Slope Barrier End Section (TL-3) – 42 Inch | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 127. 1 |
| Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 54 Inch - Less than 100 feet |
| Linear Foot |
A. Form and cast-in-place barrier wall to match existing.
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 54 Inch - 100 to 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-3) – 54 Inch - Greater than 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier End Section (TL-3) – 54 Inch | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier Transition (TL-3) – 42 Inch to 54 Inch | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 42 Inch - Less than 100 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 42 Inch - 100 feet to 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 42 Inch - Greater than 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier End Section (TL-5) – 42 Inch - Greater than 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 54 Inch - Less than 100 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 54 Inch - 100 feet to 1000 | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier (TL-5) – 54 Inch - Greater than 1000 feet | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier End Section (TL-5) – 54 Inch | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 1 | Cast-In-Place Concrete Constant Slope Barrier Transition (TL-5) – 42 Inch to 54 Inch | Linear Foot |
| Form and cast-in-place barrier wall to match existing. | Includes labor, material and equipment. Item includes reinforcing steel and barrier reflectors. |
| 128. 1 |
| Precast Concrete Constant Slope Barrier - F Shape |
| Linear Foot |
A. Measured along the barrier face.
B. Includes stabilization pins, connection pins and barrier reflectors. Includes asphalt impregnated polyurethane foam when required. Includes labor, material, equipment, transport and placement.
| 129. 1 |
| Precast Concrete Constant Slope Barrier – 42 Inch New Jersey Shape |
| Linear Foot |
A. Measured along the barrier face.
B. Includes stabilization pins, connection pins and barrier reflectors. Includes asphalt impregnated polyurethane foam when required. Includes labor, material, equipment, transport and placement.
| 130. 1 |
| Portland Cement Concrete Pavement |
| Cu Yd |
A. Calculated by the area of pavement multiplied by the specified thickness.
B. Includes dowels and tie bar per UDOT Standard Drawings.
C. Includes longitudinal tining, diamond grinding, transverse tining, artificial turf drag, and grinding to correct unacceptable texturing.
D. Includes curing, contact Ds, sawed joints, transverse expansion joints, and associated joint sealing as approved prior to commencing work.
E. Includes labor, material, and equipment to construct concrete pavement.
F. Specified thickness is based on adjacent panel thicknesses as specified by the State Representative.
| 131. 1 |
| Portland Cement Concrete Pavement (Delivery Only) |
| Cu Yd |
A. Calculated by the area of pavement multiplied by the specified thickness.
B. Includes dowels and tie bar per UDOT Standard Drawings.
C. Includes longitudinal tining, diamond grinding, transverse tining, artificial turf drag, and grinding to correct unacceptable texturing.
D. Includes curing, contact Ds, sawed joints, transverse expansion joints, and associated joint sealing as approved prior to commencing work.
E. Includes labor, material, and equipment to construct concrete pavement.
F. Specified thickness is based on adjacent panel thicknesses as specified by the State Representative.
| 132. 1 |
| Off Hours Plant Opening Fee |
| Each |
A. Fees incurred for concrete or asphalt plant opening during off hours or weekends.
B. Provide documentation confirming the cost was passed on from the plant.
| 133. 1 |
| Small Batch Fee (Concrete) |
| Each |
A. Fees incurred for concrete plant producing a small batch.
B. Provide documentation confirming the cost was passed on from the plant.
| 134. 1 |
| Remove Concrete Spalls or Delamination, Ground Level |
| Sq Yd |
A. Includes labor, materials and equipment to remove damaged, shattered and delaminated concrete.
| 135. 1 |
| Remove Concrete Spalls or Delamination, Overhead |
| Sq Yd |
A. Includes labor, materials and equipment to remove damaged, shattered and delaminated concrete.
| 136. 1 |
| Structural Reinforcing Steel |
| Pound |
A. Includes “in-place” coated reinforcing steel needed for structural pothole patching.
B. Reinforcing steel for all other applications are included in the related concrete items and incidental to that work.
| 137. 1 |
| Structural Pothole Patching - Approach Slab Repair (up to 4 inches depth) |
| Sq Ft |
A. Contractor to identify areas for repair and confirm with UDOT prior to commencing work.
B. Department will not allow additional compensation for repairing blow throughs or removing and repairing failed patches.
C. Includes labor, materials, and equipment.
| 138. 1 |
| Structural Pothole Patching - Approach Slab Repair (4 to 8 inches depth) |
| Sq Ft |
A. Contractor to identify areas for repair and confirm with UDOT prior to commencing work.
B. Department will not allow additional compensation for repairing blow throughs or removing and repairing failed patches.
C. Includes labor, materials, and equipment.
| 139. 1 |
| Penetrating Concrete Sealer |
| Sq Ft |
A. Includes labor, materials, and equipment.
| 140. 1 |
| Hot Pour Paving Joint Sealing |
| Linear Foot |
A. Crack or joint width measured up to 1/2-inch in width.
B. Measured along centerline of joints.
C. Includes all labor, material, and equipment necessary for installation of the joint seal.
D. Includes joint cleaning, backer rod. Includes expansion joint filler and pre-molded joint filler option when applicable.
| 141. 1 |
| Cold Pour Slope Paving Joint Sealing |
| Linear Foot |
A. Crack or joint width measured up to 1/2-inch in width.
B. Measured along centerline of joints.
C. Includes all labor, material, and equipment necessary for installation of the joint seal.
D. Includes joint cleaning, backer rod. Includes expansion joint filler and pre-molded joint filler option when applicable.
| 142. 1 |
| Drainage Excavation and Backfill |
| Cu Yd |
A. Intended for pipe or drainage box excavation and waste removal.
B. Includes excavation and backfill (with native materials) for foundations, box culverts, pipe culverts, drains, and other structures.
C. Includes labor, materials, and equipment necessary for excavation and backfill to meet UDOT Specifications and Standard Drawings.
D. If native materials are not suitable for backfill use, imported materials will be paid separately.
E. Contractor to obtain approval for excavation limits from the State Representative prior to commencing work.
| 143. 1 |
| Core Existing Drainage Box, Install & Grout Culvert |
| Each |
A. Includes labor, material, and equipment to core an existing drainage box to install and grout culvert.
B. No additional payment will be made for connections to drainage structures placed by the Contractor.
| 144. 1 |
| Trench Shoring |
| Linear Foot |
Paid per linear foot of a single trench box per OSHA requirements.
| 145. 1 |
| Trench Plate |
| Sq Ft |
A. Charged per foot of open trench requiring cover.
B. Includes labor, material, and equipment to place, maintain and remove trench plate.
| 146. 1 |
| Trench Plate - Grooved In |
| Sq Ft |
A. Charged per foot of open trench requiring cover.
B. Includes labor, material, and equipment to groove in, place, maintain and remove trench plate.
| 147. 1 |
| Solid Cover or Bicycle-Safe Frame and Grate |
| Each |
A. Includes frame and cover, either a solid cover or bicycle safe grates as directed by the State Representative.
B. When replacing an existing frame or cover, contractor to match existing solid cover or bicycle grate unless otherwise directed. Contractor to obtain approval prior to ordering material.
C. Refer to DB and GF Series UDOT Standard Drawings.
| 148. 1 |
| Remove Valve Box |
| Each |
A. Includes labor, material and equipment.
B. Includes removal of waste debris from the project site, but excludes dump fee.
C. Backfill and associated compaction when required paid separately.
D. Protect in Place valve and associated infrastructure until approval is obtained.
| 149. 1 |
| Reconstruct Valve Box |
| Each |
A. Includes reinforcing steel, labor, material and equipment to lower and raise to meet grade of the adjacent surface.
| 150. 1 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .