4-01. AVL General Solicitation Information- Concrete.doc
DOC document 116 KB Posted
- Solicitation number
- UDOT250326MP- 2026
- Issued by
- Utah
About this file
This is a General Solicitation Information document issued by the Utah Department of Transportation (UDOT) Procurement Services for a Request for Statement of Qualifications (RFSQ) to establish an Approved Vendor List (AVL) of qualified contractors to provide installation, upgrade, and repair of concrete. The solicitation is conducted in accordance with the State of Utah Procurement Code (UCA Chapter 63G-6a) and applicable Utah Administrative Code rules. This is Stage 1 of a multi-stage process focusing on qualification only, with pricing to be requested in a subsequent stage or per individual project. The solicitation anticipates multiple contract awards, and UDOT reserves the right to cancel the solicitation or reopen it at any time. Responders must submit their responses electronically through the online bidding system by the established deadline. All responses must remain valid for a minimum of 120 calendar days after the response due date. The resulting approved vendor list will expire on August 30, 2030, with qualifications required to be resubmitted annually. Existing approved providers must recertify annually, and new suppliers may join the list during anticipated annual recertification solicitations.
Pricing submission is by invitation only for offerors meeting the mandatory minimum requirements, with pricing guaranteed for 12 months from the amended contract date and subject to adjustment only under specific conditions with a minimum 45-day notice. Mandatory minimum requirements include current Utah Business License and E-200 Vendors License, completion of at least five similar UDOT or municipal roadway projects within the last three years, at least one American Concrete Institute (ACI) Certified Flatwork Finisher on staff, capability to obtain performance and payment bonds up to $2,500,000.00 (up to $6,000,000 for Type II Work Orders), adequate cost control and quality control procedures, and willingness to service all currently listed counties across four regions. UDOT does not guarantee any minimum or maximum purchase volume, and performance evaluations are subject to continuous monitoring with potential impacts on future solicitation participation. No set-asides are indicated in this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-05. Submittal Form- Attachment A- Agency Terms and Conditions- Yes No.docx | DOCX document | |
| 9-07. Submittal Form- Certifications- Yes No.docx | DOCX document | |
| 3-10. Sample Qualifications Evaluation Sheet.doc | DOC document | |
| 1-08. Title VI.docx | DOCX document | |
| 8-02.1 Items- Measurement Payment.docx | DOCX document | |
| 10-03. Submittal Form- Vendor Set Up Form And W-9.pdf | ||
| 7-02.2 Template- Type II.docx | DOCX document | |
| 6-06. Submittal Form- Itemized Price List.xlsx | XLSX spreadsheet | |
| 2-04. Submittal Form- Business Confidentiality- Yes No.doc | DOC document | |
| 11-02.0 Scope of Work.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. Solicitation Overview and Instructions
This Request for Statement of Qualifications Responses (“RFSQ”) is designed to provide interested responders with sufficient basic information to submit responses meeting minimum requirements. It is not intended to limit a response's content or exclude any relevant or essential data.
This solicitation is issued in accordance with the State of Utah Procurement Code, Utah Code Annotated (UCA) Chapter 63G-6a, and applicable Rules found in the Utah Administrative Code (UAC). If any provision of this solicitation conflicts with the UCA or UAC, the UCA or UAC will take precedence.
NOTICE: In this solicitation, if an item is defined through use of a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, “or equivalent” apply; and invites the submission of equivalent products by the Responders.
CANCELLATION OF PROCUREMENT
The Utah Department of Transportation (the State) reserves the right to cancel this solicitation at any time and not award a contract if such action is determined in writing to be in the best interest of the State.(UCA §63G-6a-709).
FUTURE PROCUREMENTS
UDOT reserves the right to reopen this solicitation or create a new solicitation if it determines there may be more need for the procurement item than when the original solicitation was issued. Should a re-solicitation occur, previously awarded contracts will remain active, and all new contracts will be structured to terminate on the same date as the initial awards.
A new solicitation may open annually. New suppliers may apply during this annual solicitation period. All contracts awarded will expire at the end of the same initial end date, whether awarded at the beginning of year 1, year 2, or year 3, etc.
Award of a contract resulting from this solicitation does not guarantee exclusivity on scope items to the awarded provider. UDOT, at its sole discretion, may contract with other vendors to complete similar, but not identical, tasks at any time.
QUESTIONS AND ANSWERS
Questions MUST be submitted through the online bidding system during the designated Question and Answer period. Questions submitted through any other channel will not be answered. Answers disseminated by the State through the online bidding system may modify the specifications or requirements of this solicitation and will constitute an addendum to this solicitation.
Questions or notifications to the State of any ambiguity, inconsistency, excessively restrictive requirement, or errors in this solicitation MUST be submitted as a question during the Q&A period.
Issues with the solicitation that have not been previously addressed within the Q&A period of the procurement are not allowed to be addressed within a response and may result in the Responder’s response being considered non-responsive.
Responders should periodically check the bidding system for answered questions and addenda before the closing date. It is the responsibility of the Responder to submit their proposal as required by this solicitation, including any requirements contained in an answered question and/or addenda.
Exceptions to the scope of work or other content of the solicitation not previously addressed within the Q&A period of the procurement may result in the Responder’s response being considered non-responsive.
ADDENDA
Any modification to this procurement will be made by addendum issued by the State. Addendums to this solicitation may be made for the purpose of making changes to the scope of work, the schedule, the qualification requirements, the criteria, the weighting, or other requirements of this solicitation.
Authorized and properly issued addenda shall constitute the official and binding position of the State. Any submission in response to this solicitation which has as its basis any communications or information received from sources other than this solicitation, or related addenda, may be considered non-responsive and be rejected at the sole discretion of the State.
The State accepts no responsibility for a prospective Responder not receiving solicitation documents and/or revisions to the solicitation. It is the responsibility of the prospective Responder to monitor the bidding system to obtain addenda or other information relating to the solicitation.
RESTRICTIONS ON COMMUNICATIONS
From the issue date of this solicitation until an award is published, Responders are prohibited from communications regarding this solicitation with staff, evaluation committee members, or other associated individuals EXCEPT the UDOT procurement officers overseeing this solicitation. Failure to comply with this requirement may result in disqualification.
RESPONSE SUBMISSION
All materials submitted become the property of the State. Materials may be evaluated by anyone designated by the state as part of the response evaluation committee. Materials submitted may be returned only at the State's option.
Responses must be received by the due date and time (“deadline”). Responses received after the deadline will be late and ineligible for consideration.
Electronic submission instructions: When submitting a response electronically through the online bidding system, please allow sufficient time to complete the online forms and to upload response documents. The solicitation will end at the deadline. If an Responder is in the middle of uploading a response when the deadline arrives, the system will stop the upload process and the response will not be accepted by the bidding system, and the attempted submission will be considered late and ineligible for consideration.
Electronic responses may require uploading of electronic attachments. The online bidding system will accept a wide variety of document types as attachments. However, the State is unable to view certain documents. Therefore, DO NOT submit documents that are embedded (zip files) or encrypted. All documents/files must be uploaded in the bidding system as separate files.
Files submitted electronically must NOT be password protected or locked in any way.
All costs incurred by a Responder in the preparation and submission of a response, including any costs incurred during interviews, oral presentations, and/or product demonstrations are the responsibility of the Responder and will not be reimbursed.
PROTECTED INFORMATION
Portions of a proposal may be protected by submitting a Claim of Business Confidentiality Form. However, an entire proposal cannot be identified as “PROTECTED”, “CONFIDENTIAL” or “PROPRIETARY”, and if identified as such shall be considered non-responsive unless the Responder removes the designation.
The Government Records Access and Management Act (GRAMA), Utah Code Ann., Subsection 63G-2-305, provides in part that …”the following records are protected if properly classified by a government entity:”
(1) trade secrets as defined in Section 13-24-2 if the person submitting the trade secret has provided the governmental entity with the information specified in Section 63G-2-309 (Business Confidentiality Claims);
(2) commercial information or non-individual financial information obtained from a person if:
(a) disclosure of the information could reasonably be expected to result in unfair competitive injury to the person submitting the information or would impair the ability of the governmental entity to obtain necessary information in the future;
(b) the person submitting the information has a greater interest in prohibiting access than the public in obtaining access; and
(c) the person submitting the information has provided the governmental entity with the information specified in Section 63G-2-309;
(6) records the disclosure of which would impair governmental procurement proceedings or give an unfair advantage to any person proposing to enter into a contract or agreement with a governmental entity, except that this Subsection (6) does not restrict the right of a person to see bids submitted to or by a governmental entity after bidding has closed;
Pricing may not be classified as confidential or protected and will be considered public information after award of the contract.
Process for Requesting Non-Disclosure: Any Responder requesting that a record be protected must provide with their proposal the following information:
1. Must provide a completed Claim of Business Confidentiality at the time the information (proposal) is provided to the state, and
2. Must include a concise statement of reasons supporting the claim of business confidentiality (UCA § 63G-2-309(1)).
3. Must submit an electronic “redacted” (excluding protected information) copy of the proposal. Copy must clearly be marked “Redacted Version.”
Redacted Copy: If an Responder submits a proposal that contains information claimed to be business confidential or protected information, the Responder MUST submit two separate proposals: one redacted version for public release, with all protected business confidential information either blacked-out or removed, clearly marked as "Redacted Version"; and one non-redacted version for evaluation purposes, clearly marked as "Protected Business Confidential."
Responder acknowledges that its proposal or redacted copy will be made public upon the State’s receipt of a GRAMA request. The Responder will not be notified of any GRAMA request made to the State for Responder’s proposal. If the Responder submits a redacted copy, then the State will respond to a GRAMA request for Responder’s proposal with Responder’s redacted copy. However, if the Responder fails to submit a redacted copy, then the State will respond to a GRAMA request with Responder’s proposal, which will result in Responder’s protected/proprietary information, if any, being made public. Responder acknowledges that notations in the header, footer or watermark of the proposal will not be considered sufficient to constitute a request for non-disclosure of protected/proprietary information.
Failure to comply with the requirements regarding Protected Information releases the State from any obligation or liability arising from the inadvertent release of Responder information.
CORRECTION OR WITHDRAWAL OF RESPONSE
Responses may be modified or withdrawn by written or electronic notice received by the procurement officer prior to the established due date.
A decision to permit the correction or withdrawal of a response or the cancellation of an award or a contract shall be supported in a written document, signed by the chief procurement officer or head of a procurement unit with independent procurement authority.
The State reserves the right to waive minor informalities as well as minor deviations. The State also reserves the right to seek clarification on any response.
DISCUSSIONS OR CLARIFICATIONS
Discussions may be held with a responder to obtain a more complete understanding of whether the responder is responsible, or whether the responder’s response is responsive. Following discussions, a response may be rejected if it is determined that the responder is not responsible, or the response is not responsive.
INTERVIEWS AND PRESENTATIONS
Interviews and presentations may be held at the option of the State. The State shall establish a date and time for the interviews or presentations and shall notify eligible Responders of the procedures. Interviews or presentations shall be limited to those Responders meeting the minimum requirements specified in the solicitation. Interviews and presentations will be at the Responder's expense.
Representations made by a responder during interviews or presentations shall become an addendum to the Responder's response and shall be documented. Representations must be consistent with the Responder's original response and may only be used for purposes of clarifying or filling in gaps in the Responder's response.
BEST AND FINAL OFFER
A Best and Final Offer (BAFO) may be issued if it is determined to be necessary. The Best and Final Offer process is a formal request for responders to amend specific portions of the technical response or cost response.
Under the Utah Procurement Code, a Best and Final Offer may be requested if:
(i) no single response adequately addresses all the specifications stated in the request for responses;
(ii) all responses are unclear or deficient in one or more respects;
(iii) all cost responses exceed the identified budget or the procurement unit’s available funding; or
(iv) two or more responses receive an identical evaluation score that is the highest score.
RESPONSE EVALUATION
All responses that have not been disqualified from consideration under the provisions of Utah Code 63G-6a, using the criteria established in this solicitation will be evaluated by an evaluation committee in accordance with the Utah Procurement Code, Administrative Rules, policies, and the evaluation criteria set forth in this solicitation.
All responses shall remain valid for a minimum of 120 calendar days after the Response Due Date to allow adequate time for evaluation.
SOLICITATION AWARD IS NOT A CONTRACT
A solicitation award does not constitute a contract. Any award made through the bid system, notifications received from the bid system, email notifications received directly from the procurement unit, documents received by the vendor, or documents posted in the bid system, DO NOT constitute or create a contract. Only a fully executed Purchase Order (PO) or a fully executed contract constitutes a binding contract.
Between the notification of award and the receipt of a fully executed PO or contract, the procurement unit may cancel the award and/or the solicitation in full, or in part, in accordance with UCA 63G-6a-902 and 63G-6a-120.
If awarded, vendor may not begin work, purchase materials, or enter into subcontracts relating to this solicitation until they receive a fully executed PO or contract.
After the evaluation and final scoring of proposals is completed, the State shall award the contract as soon as practicable, provided the solicitation is not canceled without awarding a contract.
QUANTITY ESTIMATES AND NO GUARANTEE OF VOLUME OF PURCHASE
Historical usage may not be representative of forthcoming need, and as such, UDOT does not guarantee to purchase any amount under this contract.
The issuance of a contract under this RFP does not guarantee a minimum or maximum amount in expenditure. UDOT is not obligated to purchase any devices or services from an awarded Responder. Purchases will be made on an as-needed basis at the Department’s sole discretion.
UDOT reserves the right to perform testing on a limited number of devices from a vendor to assess compatibility and performance before deciding whether to purchase more devices.
PROTEST PROCESS
Responders are directed to Utah Code Part 16 and Utah Administrative Code Rule R33-16 for available appeal processes.
CONTRACT TERMS AND CONDITIONS, EXCEPTIONS, AND NEGOTIATIONS
Any contract resulting from this solicitation will include, but not be limited to the following:
· Scope of Work Specifications, Requirements, and Instructions.
· Any addendums to the solicitation as issued through the bidding system.
· Attachment A- State of Utah Standard Terms and Conditions.
Exceptions and/or additions to the Standard Terms and Conditions are strongly discouraged. Any requested exceptions and/or additions to the Standard Terms and Conditions must be submitted with the proposal. Exceptions and/or additions submitted after the date and time for receipt of proposals will not be considered. Responders may not submit requests for exceptions and/or additions by reference to a responder's website or URL.
The State may refuse to negotiate exceptions and/or additions that are determined to be excessive; that are inconsistent with similar contracts of the procurement unit; to warranties, insurance, or indemnification provisions that are necessary to protect the procurement unit after consultation with the Attorney General's Office or other applicable legal counsel; where the solicitation specifically prohibits exceptions and/or additions; or that are not in the best interest of the procurement unit.
In a multiple award situation, the State reserves the right to negotiate exceptions and/or additions to terms and conditions in a manner resulting in expeditious resolutions. This process may include beginning negotiations with the Responder having the least number of exceptions and/or additions and conclude with the Responder submitting the greatest number of exceptions and/or additions. Contracts may be executed and become effective as negotiations are completed.
If negotiations are required, Responders must provide all documents in Microsoft Word format for redline editing. Responders must also provide name, contact information, and access to the person(s) that will be directly involved in legal negotiations.
Any mandatorily required acceptance of a Responder’s terms and conditions may result in the proposal being determined to be non-responsive.
An award resulting from this solicitation is subject to successful contract terms and conditions negotiation (if required). The State, at its sole discretion, will determine when contract terms and conditions negotiations become unproductive and will result in termination of award to that Responder and the State may move to the next eligible Responder.
PERFORMANCE EVALUATION
Contracts resulting from this solicitation are subject to performance evaluations. Continuous negative performance evaluations and documented feedback from end users may impact a responder’s ability to participate in future solicitations. Performance evaluations may include end user surveys, performance audits, reports, interviews, or other reasonable methods of performance evaluation. Responders will be notified of any negative performance evaluations or end user feedback collected.
STABILITY OF RESPONDER
The State reserves the right to request financial and other information it deems relevant as necessary to evaluate a responder’s stability and capability to complete the Scope of Work.
TRAVEL TIME AND EXPENSES
For insurance purposes, state business travel, whether reimbursed or not, must have prior approval by an appropriate authority. This also includes non-state employees where the agency or political subdivision is paying for the travel expenses.
Approved travel will be reimbursed at the state approved rate. All travel must be pre-approved in writing by the UDOT Program Manager. Mileage will be reimbursed according to current state standards, and any invoice for mileage must be accompanied by a completed mileage log.
Authorized Travel expenses will have the following conditions:
1. Food expenses are limited to the rate allowed by then-current State of Utah Finance per diem policy.
2. Reimbursement for lodging will be limited to the applicable State of Utah government rates. If accommodation is unavailable within these limits, the State will make hotel reservations through the Utah State Travel Office, in which case reimbursement will be limited to the lowest rate obtainable by the Travel Office.
3. All air travel will be booked through the Utah State Travel Office. Any requests for Exceptions to State Travel policy must be submitted from the Director to State Travel with sufficient documentation backing up the circumstances behind the request.
4. All rental cars will be booked by the State through the Utah State Travel Office.
5. All air travel will be booked by the State through the Utah State Travel Office. In the event a contractor requests to book their own air travel, an exception would need to be requested. The State of Utah Travel Office would need a memo from your Director requesting an exception to State Finance Policies written to the State Director of Finance. The air travel could not be booked until a decision has been made regarding the exception request.
BACKGROUND CHECKS
The State reserves the right to require any Contractor (and Subcontractor if applicable) with access to secure state facilities, sensitive data, or technology to complete a background check.
Contractor (and Subcontractor if applicable) agrees to notify the State immediately if an arrest or conviction of any employee that has access to secure state facilities, sensitive data, or technology occurs during the performance of a contract resulting from this solicitation.
Contractor (and Subcontractor if applicable) shall not permit any of its employees who have been convicted of a felony or misdemeanor to have access to secure state facilities, sensitive data, or technology.
The State reserves the right to determine what state facilities, sensitive data, or technology applies to the background and disclosure/notification requirements.
SUBCONTRACTORS
The planned use of any and all subcontractors must be clearly explained in the Executive Summary. The Responder, if awarded the contract, shall be responsible for all costs and contract performances if subcontractors are used. The State reserves the right to review and approve all subcontractors, review services conducted by subcontractors, and refuse payment on projects where subcontractors are used without foreknowledge or approval by the State.
Subcontractors must be authorized to do business in the State of Utah. Subcontractors must include information, in the same detail as the prime contractor or responder, of any and all personnel and companies who are not in the direct employ of the Contractor. Freelance/contracted labor may not be billed above the prevailing labor rate in the contract and is not considered a reimbursable expense. The prime Responder shall be responsible for all costs and contract performances by subcontractors if used.
Joint Bids: Where two or more Bidders desire to submit a single bid in response to a solicitation, they must do so on a prime/subcontractor basis rather than as a joint venture. The State intends to contract with a single firm or multiple firms, but not with multiple firms doing business as a joint venture.
II. Solicitation Specifics NOTICE 1: The electronic bidding system’s Event Number must be referred to on all responses, correspondence, and documentation relating to this solicitation.
NOTICE 2: An annual solicitation will be released allowing existing providers on the Approved Vendor List to submit their required annual re-certification. The annual solicitation will also allow New Providers to be added to the existing Approved Vendor List (AVL).
NOTICE 3:
This solicitation is for Stage 1- Qualification. Pricing will be requested in a subsequent stage or per project as outlined within the Scope of Work document.
PURPOSE OF REQUEST FOR STATEMENT OF QUALIFICATIONS (RFSQ)
The purpose of this Request for Statement of Qualifications (RFSQ) is to allow the Utah Department of Transportation (UDOT) to enter into a Statewide Approved Vendor List (AVL) with qualified companies interested in providing INSTALLATION, UPGRADE, OR REPAIR OF CONCRETE.
UDOT does not guarantee any purchase amount if a Vendor is prequalified.
CONTRACT AWARD INTENT
It is anticipated that this solicitation will result in multiple approved contractors.
QUALIFICATION, AND APPROVED VENDOR LIST PROCESS
Contractors determined to be qualified will be placed on the Approved Vendors List for a period of 12 months. Approved contractors must resubmit qualifications for evaluation and renewal annually.
New/additional Vendors may be qualified and placed on the approved vendor list with submission of qualification for evaluation, approval, and during an open period that is anticipated to occur annually.
The RFSQ can be reopened for any reason the State deems appropriate.
LENGTH OF CONTRACT, CERTIFICATION, AND PRICING GUARANTEE
· Approved Vendor List Term: this Approved Vendor List expires 08/30/2030).
· Certification, New Suppliers, and Updated Price Submission
· Existing Approved providers must resubmit qualifications for evaluation and renewal annually. If a contract holder fails to recertify, they will have to wait until the next annual solicitation to recertify for a new contract.
· New Suppliers will be able to join the Approved Responder List whenever an annual recertification solicitation is issued. Recertification windows are anticipated to open annually.
· Updated Pricing- Providers will be allowed to be submitted at each annual recertification solicitation. Pricing is to be guaranteed for the span of 12 months from the amended contract date, to ensure Statewide coverage and availability.
· A request for price increase adjustment requires a minimum of forty-five (45) calendar days prior to the effective date. Requests for price adjustment must include sufficient documentation supporting the request (i.e., through Federal commodity indices) and demonstrating a logical mathematical link between the current price and the proposed price.
Price adjustments may occur no more frequently than the established pricing guarantee period. An "Exception" will be considered if there is a net change in price of five (5) percent or more based on a change in the index(es). If a price adjustment is granted earlier than the price guarantee period, that adjustment must be in effect for a full price guarantee period unless there is a subsequent Exception.
Any adjustment or amendment to the contract will not be effective unless approved by the State. The State will be given the immediate benefit of any decrease in the market, or allowable discount.
In a multiple award situation, any adjustment made by one contractor may result in the necessity of providing the same opportunity to all other contracted vendors to adjust pricing on the same item(s).
CONTRACTOR PERFORMANCE
If the contractor at any time is not meeting project schedule, standards or specifications as agreed upon for the project, the UDOT representative may do any of the following:
• Issue a written warning.
• Stop award of any future projects until current work is complete or rectified.
• Withdraw work and award to another contractor.
III. Scope of Work and Associated Requirements All Scope of Work Requirements MUST be demonstrably met by a Responder in order for their response to be considered. Any breach of requirements once the Contract has been awarded constitutes breach of Contract by the responder and the Contract may be terminated immediately.
The Scope of Work is subject to change based on the awarded contract(s).
DETAILED SCOPE OF WORK AND ASSOCIATED REQUIREMENTS
See document titled- “Scope of Work.”
IV. Required Response Submission Information
RESPONSE RESPONSE
All responders must submit responses that detail their experience and qualifications in the requested areas (each area must be addressed. Do not list “not applicable”).
For ease of evaluation, the submitted responses must provide a point-by-point response, addressing in detail each area of the evaluation criteria. The criteria are not intended to limit a response's content or exclude any relevant or essential data. Responders are at liberty and are encouraged to expand upon the criteria to demonstrate the Responder’s capability to provide the State with a solution.
Responders bear sole responsibility for providing evidence in their response that they are capable of performing the requested Scope of Work.
RESPONSE FORMAT and SUBMISSION REQUIREMENTS Responses should be concise, straightforward, and prepared simply and economically. Expensive displays, bindings or promotional materials are neither desired nor required. However, there is no intent in these instructions to limit a response’s content or to exclude any relevant or essential data.
Responses should be organized and titled using each of the following specific headings:
1.
Section Title: UDOT Vendor Setup Form.
UDOT’s Responder Setup Form fully completed and signed by the responder.
See document titled “Submittal Form- Vendor Setup Form.pdf”.
2.
Section Title: Cover Letter.
Include a one-page cover letter that identifies the name and primary contact information of the person who will be authorized to execute an agreement with the State of Utah on behalf of the Responder.
3.
Section Title: Business Confidential/Protected Information.
All protected/proprietary information must be indicated by submitting a completed Claim of Business Confidentiality form.
If responder’s proposal contains protected/proprietary information (please refer to the Protected Information section of this solicitation for additional information) then responder must also submit a redacted copy of the proposal at the same time as the responder submits its proposal. The redacted copy of the responder’s proposal must be submitted in compliance with the other sections of this solicitation.
If there is no protected information, check the “None” box on the submittal form.
Failure to comply with this Section releases the State from any obligation or liability arising from the inadvertent release of Responder information.
See document titled “Submittal Form- Business Confidentiality- Yes No.doc”.
4.
Section Title: Potential Conflicts of Interest, etc.
Responders must identify any debarment, conflict or potential conflicts of interest that might arise during the contract, outstanding tax liens, and any other potentially impacting information.
If no conflicts are identified or expected, indicate “No” in the appropriate submittal sections.
See document titled “Submittal Form- Certifications- Yes No.docx”.
5.
Section Title: Exceptions and/or Additions to the Standard Terms and Conditions.
Proposed exceptions and/or additions to the Standard Terms and Conditions must be submitted. Responder must provide all proposed exceptions and/or additions, including an Responder’s terms and conditions in Microsoft Word redline format. Responders must also provide the name, contact information, and access to the person(s) that will be directly involved in terms and conditions negotiations.
If there are no exceptions and additions to the Standard Terms and Conditions, check the “No” boxes on the submittal form.
See document titled “Submittal Form- Attachment A- Standard Terms and Conditions- Yes No.docx”.
6. Section Title: Mandatory Minimum Requirements/Qualifications (Pass/Fail Criteria).
Responders must provide the required evidence and/or documentation/narratives demonstrating compliance with the stated Mandatory Minimum Requirements/Qualifications. A Responder’s failure to meet any one of the mandatory requirements will result in the proposal being classified as non-responsive and will be rejected under the provisions of the Utah Procurement Code.
Responders should review the scope of work and/or specifications in the files before submitting their responses to the mandatory minimum requirements.
All of the items described as mandatory minimums are non-negotiable. If it is determined that a response does not meet the mandatory minimum requirements, at any time during the solicitation process, it will be deemed non-responsive and disqualified from further consideration.
Responders must provide sufficient evidence and/or documentation demonstrating that the responder is compliant with the Mandatory Minimum Requirements:
| Evaluation Criteria |
| Submission Requirement |
| Evaluation |
1. Contractor must have and maintain a Current Utah Business License
Provide: provide evidence of a current Utah Business License that is current at time of response submission. The company name on the Utah Business License must match the name of the submitting contractor.
Pass/Fail
2. Contractor must have and maintain a Current State of Utah’s E-200 Vendors License
| Provide: current copy of the State of Utah’s E-200 Vendors License. |
| Pass/Fail |
3. Contractor must have completed similar work as a general contractor or sub-contractor on at least 5 UDOT or municipal roadway projects within the last 3 years.
Provide: list of work documenting compliance with this requirement.
Pass/Fail
4. Contractor must have at least one American Concrete Institute (ACI) Certified Flatwork Finisher on staff.
Provide: documentation showing compliance with this requirement.
Pass/Fail
5. Contractor must be capable of obtaining a Performance and Payment bond up to $2,500,000.00.
Provide: letter from a Surety Company documenting ability to meet this requirement.
NOTE: Performance Bonds and Payment bonds will be set at the value of each Work Order. For Type II Work Orders, bonds may be required of $6,000,000.
Upon request, bonds must be obtained within seven (7) calendar days.
At their discretion, UDOT may then require an annual letter from the contractor’s surety company for each successive 12-month period, for the life of the contract.
Pass/Fail
6. Contractor must have adequate standard policy, practices and procedures, for implementing cost control and quality control measures.
Provide: documentation outlining Contractor’s standard policy, practices and procedures, for implementing cost control and quality control measures. Documentation may include excerpts from the Contractor’s policy manual, handbook, etc. and will be provided as a separate attachment. Limited to two pages.
Pass/Fail
6. Contractor must have adequate standard policy, practices and procedures, for implementing cost control and quality control measures.
Provide: statement confirming intent to service all currently listed counties:
Region One: Box Elder, Cache, Davis, Morgan, Rich, and Weber Counties Region Two: Salt Lake, Summit, and Tooele Counties Region Three: Daggett, Duchesne, Juab, Uintah, Utah, and Wasatch counties Region Four: Beaver, Carbon, Emery, Garfield, Grand, Iron, Kane, Millard, Piute, San Juan, Sanpete, Sevier, Washington, and Wayne counties
Pass/Fail
NOTICE: PRICE SUBMISSION is by INVITATION ONLY by those offerors that have been determined to meet the Mandatory Minimum Requirements.
Offerors will be notified by email if they are to submit Pricing Information.
See Submittal Form- Attachment D Itemized Price List.
| Item |
| Submission Requirement |
1. Pricing Submission
Offerors are to provide pricing as per Submittal Form- Attachment D Itemized Price List.
Offerors may not change/modify the format of the Price Response Form and must submit pricing in the exact format requested for a fair comparison of pricing among all offerors. Altering the format or conditioning the cost on acceptance of additional/conflicting terms or limitations may result in a finding that your price submittal is non-responsive.
V. Response Evaluation and Contract Award
RESPONSE EVALUATION PROCESS
All responses submitted in response to this solicitation will be evaluated in a manner consistent with the Utah Procurement Code, Administrative Rules, policies and the evaluation criteria in this solicitation.
This solicitation will be evaluated under a Multiple Stage process. Responders must pass a stage in order to move to the next stage in the evaluation process.
Stage 1: Determination of Responsiveness (Pass/Fail) In Stage One of the evaluation process, all responses timely received will be reviewed for responsiveness to solicitation requirements. Responses not conforming to solicitation requirements or unable to meet the Minimum and/or Mandatory Requirements will not proceed on to Stage 2 Technical Response Evaluation.
Stage 2: Determination of Qualification Stage Two will consist of an evaluation committee conducting a detailed Evaluation of each responsive and responsible response that has not been previously disqualified or rejected.
Responsive responses will be evaluated against the Evaluation Criteria. The evaluation committee will review and arrive at a consensus individual offeror qualification.
Offerors determined to be qualified will be asked to submit pricing
Offerors who are determined not to be qualified at the time of evaluation will be able to resubmit requirements for consideration at future re-openings of the Approved Vendor List.
Stage 3: Determination of Contract Award Multiple Award:
In regards to this solicitation, UDOT has determined to enter into Multiple contracts.
After the evaluation and qualification determinations are completed, the State shall award the contracts as soon as practicable, provided the solicitation is not canceled in accordance with Utah Procurement Code requirements.
Offerors who are not awarded a Contract will be able to resubmit requirements for consideration at future re-openings of the Approved Vendor List.
General Solicitation Document
File details come from the government source that posted it. Updated .