11-02.0 Scope of Work.docx

DOCX document 100 KB Posted

Attached to
UDOT RFSQ/AVL- Concrete Repair- Stage 1- Qualification/Re-Qualification
Solicitation number
UDOT250326MP- 2026
Issued by
Utah

About this file

Summary

This Scope of Work document outlines the requirements for the Utah Department of Transportation's Approved Vendor List (AVL) contract for installation, upgrade, or repair of concrete services across four UDOT regions in Utah. The contract is anticipated to result in multiple awards and will remain valid through August 31, 2030. Contractors may bid on any combination of the four regions (Region One covering Box Elder, Cache, Davis, Morgan, Rich, and Weber counties; Region Two covering Salt Lake, Summit, and Tooele counties; Region Three covering Daggett, Duchesne, Juab, Uintah, Utah, and Wasatch counties; and Region Four covering Beaver, Carbon, Emery, Garfield, Grand, Iron, Kane, Millard, Piute, San Juan, Sanpete, Sevier, Washington, and Wayne counties). Work will be awarded through two mechanisms: Type I work orders based on known items from the contractor's submitted cost sheet, and Type II work orders consisting of customized projects with varying scopes that require a mandatory site visit. Contractors have four calendar days to accept or decline awarded work orders and must submit project schedules within fourteen calendar days of acceptance for Type I work. The maximum project value per award is $2.5 million.

Pricing submitted by contractors is guaranteed for one year from the contract start date, with price increase requests requiring a minimum of forty-five calendar days' notice and supporting market analysis documentation. UDOT retains the right to receive immediate benefit of any market price decreases or allowable discounts. Mandatory contractor qualifications include maintaining a current Utah E-100 Contractors License and State Business License, completing at least five similar UDOT or municipal roadway projects within the last three years, having at least one American Concrete Institute (ACI) Certified Flatwork Finisher on staff, and demonstrating capability to obtain Performance and Payment bonds up to $2,500,000. Contractors must re-certify annually with updated pricing allowed at each recertification solicitation. Work must comply with UDOT's 2025 Standards and Specifications, State and Federal safety requirements, and UDOT's Safety and Health Manual. Three documented events of non-compliance may result in contractor removal from the contract, and contractors that fail to respond to work order awards within four calendar days may be removed after three non-responsive incidents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

INSTALLATION, UPGRADE, OR REPAIR OF CONCRETE

CONTRACT AWARD INTENT

It is anticipated that this solicitation will result in multiple contract awards and may be awarded to more than one offeror.

1.0 CONTRACT TERMS

Utah Department of Transportation (UDOT) is contracting to provide installation, upgrade, or repair of concrete. This is an Approved Vendor List award. Existing Approved Vendor List expires 08/31/2030.

1.1 Pricing

A. Guarantee Period - Prices submitted guaranteed for one year from the contract start date.

B. Price Increase - A request for price increase adjustment requires a minimum of forty-five (45) calendar days prior to the effective date. A request for price increase adjustment must include sufficient documentation (market analysis) supporting the request. Price adjustments will not be effective unless approved by UDOT's Procurement Manager. A price increase adjustment if allowed, guaranteed for the same length of time as the original price guarantee. The conducting procurement unit will be given the immediate benefit of any decrease in the market, or allowable discount.

C. Price Decrease - UDOT is to be granted the immediate benefit of any decrease in market price, allowable discount(s) or other price reductions.

1.2 Re-Certification

Previously Qualified Vendors must re-certify with the mandatory requirements every 12 months. Failure to do so will be cause for cancellation of contract.

New Suppliers will be able to join the Approved Vendor List whenever a recertification solicitation is issued.

Updated Pricing- Will be allowed to be submitted at each annual recertification solicitation.

2.0 UDOT REGIONS

Contractors must be able to provide services for work in all counties in each Region they provide a bid. Contractors are not required to bid all Regions (i.e. Contractors may bid any combination of 1 or more regions). The contract will encompass the following UDOT Regions:

Region One(Box Elder, Cache, Davis, Morgan, Rich, and Weber counties)
Region Two(Salt Lake, Summit and Tooele counties)
Region Three(Daggett, Duchesne, Juab, Uintah, Utah, and Wasatch counties)
Region Four(Beaver, Carbon, Emery, Garfield, Grand, Iron, Kane, Millard, Piute, San Juan, Sanpete, Sevier, Washington, and Wayne counties)

3.0 DEFINITIONS

State Representative: Any UDOT employee or authorized contract employee.

Contractor: A qualifying entity that has been awarded a contract from this solicitation Emergency Work: A sudden and serious event or an unforeseen change in circumstances that calls for immediate action to avert, control, or remedy harm.

Not Meeting Schedule: Any project that exceeds the agreed upon start time or completion time is deemed not meeting schedule. If there are conditions outside of the Contractor's control, or a change in scope, then the State Representative shall be notified for negotiation of additional project time.

Notification of Poor Performance: A written or verbal warning to the Contractor outlining areas of performance which need to be addressed in order to conform to the contract or project requirements.

Open Project: Any project that is in the period between Notice to Proceed and Payment Approval.

Work Order Type 1: will consist of known work items present on the cost sheet submitted with the contract (see Itemized Price List).

Work Order Type 2: will consist of customized project with varying work items and scope elements (see Type II Template). This work order type shall be utilized for projects based on the extent of the project, or those deemed unique or complex by UDOT.

4.0 CONTRACTOR MANDATORY QUALIFICATIONS AND REQUIREMENTS

This section contains mandatory minimum requirements. All of the items described in this section are non-negotiable. All Contractors express their willingness, capability, and ability to satisfy these requirements when solicitation requirements were met.

4.1Maintain a current copy of the State of Utah's E-100 Contractors License.
4.2Maintain a current State of Utah's Business License
4.3Must have completed similar work as a general contractor or sub-contractor on at least 5 UDOT or municipal roadway projects within the last 3 years.
4.4Must have at least one American Concrete Institute (ACI) Certified Flatwork Finisher on staff.
4.5Contractor is capable of obtaining a Performance and Payment bond up to $2,500,000.00.

Note: Payment and Performance Bond may be required per project as determined by the Project Manager. Upon request, bonds must be obtained within seven (7) calendar days.

4.6 A detailed statement, providing the Contractor’s standard policy, practices and procedures, for implementing cost control and quality control measures. Statement may include excerpts from the Contractor’s policy manual, handbook, etc. and will be provided as a separate attachment. Limit to two pages.

5.0 CONTRACTOR MANDATORY MINIMUM TECHNICAL SPECIFICATIONS

Contractor acknowledges their firm and staff have the ability to meet or exceed the technical specifications outlined in this section. Contractor certifies their abilities to satisfactorily complete projects on time.

5.1All work performed safely. Staff on the job site must be in full compliance of all State and Federal safety requirements along with meeting UDOT’s Safety and Health Manual
5.2Mandatory minimum technical specifications/scope of work includes Attachments.
5.3Contractor shall provide all properly qualified, certified, and/or licensed personnel, materials, equipment, safety devices, and apparel necessary to complete the work.
5.4All work performed shall be completed in accordance with State laws, standards, regulations of all governing authorities in accordance with UDOT Standard Specifications, Standard Drawings, and project documents.
5.5Coordination of Work

A. All work shall be coordinated through and directed by the State Representative. Each project may have a different State Representative.

B. Sub-consultants: The Contractor shall not sub-contract more than 25 percent of work based on cost without written approval from the State Representative. All sub-contractors shall meet the Mandatory Qualifications and Requirements included in this contract.

C. Project Cap: Maximum value per project is $2.5 million dollars.

6.0CONTRACTOR TASKS AND TECHNICAL REQUIREMENTS
6.1Conduct all work in a safe and efficient manner.
6.2Perform utility work in accordance with UDOT Standard Specifications. Contact Blue Stakes prior to commencing work.
6.3Unless directed otherwise by the State Representative or drawings and specifications, match all new storm drainage patterns and flow-lines to existing storm drainage patterns and flow-lines. In the event curb and gutter is constructed in a place where no curb and gutter existed prior, drainage for the new curb and gutter shall drain into existing drainage paths and facilities.
6.4Unless otherwise directed by the State Representative, perform all work to meet or exceed the requirements noted in the drawings and specifications. If the work does not meet the requirements shown in the corresponding drawings and specifications, the Contractor, at his own expense, will correct the deficient work.
6.5Additional certifications may be required in select cities. Any additional certifications will be identified in the Type II solicitation.

6.6 All staff directly working on pedestrian ramps are required to attend a 4-hour pedestrian ramp training session conducted by UDOT Traffic and Safety or from the Local Technical Assistance Program (LTAP). UDOT may require proof of training.

6.7 All staff directly working on mixing, placing, and finishing structural pothole patching material are required to be trained and certified per specification 03934 Structural Pothole Patching. UDOT may require proof of training / certification.

6.8 Must have at least one American Concrete Institute (ACI) Certified Flatwork Finisher on staff at each project. If deficient, a 90-day grace period to complete the training starts from the Step 2 award notice date. If Contractor does not complete the training within 90-days, award of contract reversed.

7.0GENERAL PROJECT PROVISIONS
7.1Non-Compete Clause

Contractor represents its officers and employees are free to contract with UDOT and are not subject to restrictions by the terms of their present or past employment, including, but not limited to an agreement not to compete for a period of time unless disclosure has been made. Contractor must disclose to UDOT any possible conflicts in writing before the contract is signed, and the UDOT will evaluate whether to continue with contract execution. UDOT may elect to terminate a contract immediately with a Contractor who is subsequently determined to be subject to such restrictions without liability to UDOT.

7.2 Quantity Estimates

UDOT does not guarantee to complete any amount of any particular item(s) under this contract. Estimated quantities are for bidding purposes only and are not to be construed as a guarantee to complete any amount. Work orders resulting from this contract may not include all bid items associated with this contract.

7.3 Working Hours

UDOT Region Traffic Engineer will specify working hours to prevent the work performed from interfering with normal peak hour traffic. Night and weekend work may be required as part of this contract.

7.4 Responsibility for Wages

Contractor is responsible for all applicable company wages in accordance with the Federal, State, and local laws and ordinances

7.5 Mobilization

Mobilization will be paid once for each project based on the county work will be completed in. If work will cross county lines contractor will receive the higher cost between said counties. Project locations within 5 miles of each other can be grouped as one project with one mobilization cost.

7.6 Requirement to Blue-Stake Utilities

The Contractor is responsible to have the project area blue-staked prior to any excavation. Any damages caused to marked utilities are the sole responsibility of the Contractor.

7.7 Timeliness for Project Completion

The Contractor will complete all required work in a safe, efficient, and timely manner (in adherence to the accepted work order schedule) and will avoid causing any delays due to untrained/uncertified staff, inadequate/insubstantial equipment, or lack of required materials.

7.8 Inspections

Work must conform and adhere to UDOT’s 2025 Standards and Specifications, including Supplemental Specifications and any other modified specifications or special provisions included in this contract. These standards and specifications can be found online at the following link:

https://www.udot.utah.gov/connect/business/standards/

All work under this contract will be subject to UDOT inspection and may have testing in accordance with UDOT Specifications and Minimum Sampling and Testing Requirements.

If UDOT finds work items furnished to be incomplete or not in compliance with bid/proposal specifications, UDOT may reject the work and require the Contractor to either correct any related issues without charge or deliver the work in question at a reduced price which is equitable under the circumstances. If Contractor is unable to or refuses to correct such work within a time deemed reasonable by UDOT, UDOT may cancel the work in whole or in part. Nothing in this paragraph will adversely affect UDOT’s rights, including the rights and remedies associated with revocation of acceptance under the Uniform Commercial Code.

If the work performed by the Contractor is rejected or does not adhere to the governing documents listed in the first paragraph of this section, then an event of “non-compliance” will be documented for that Contractor. Three (3) documented events of “non-compliance” may result in the removal of the Contractor from this Contract at UDOT’s discretion.

7.9 Required Updates

The Contractor shall provide project progress updates to the State Representative upon request. The approved schedule may be reviewed and discussed on a weekly basis with the State Representative personnel to ensure proper and timely workflow. If there are early indications that the project's delivery will be late, it is the Contractor's responsibility to promptly inform the State Representative in writing, detailing the issues for delay. The Contractor will also provide a specific corrective solution as to how the Contractor will return to schedule, i.e. adding people, equipment resources, changing workflow, etc.

7.10 Protection of Work

The Contractor is responsible for protecting project work. This includes all work site safety, protection from vandalism and environmental weather curing protection as needed to complete the project.

7.11 Contractor Not Meeting Requirements

Contractor not meeting schedule, failing to comply with standards, specifications, or licensed personnel requirements, the State Representative may do any of the following:

A. Issue a written Notification of Poor Performance.

B. After two (2) notifications, UDOT may:

1. Withdraw work and award to another Contractor. If pay items have been started but not completed, partial payment for items will be pro-rated based on percent of completion.

2. If bonded, issue a written notice to the Contractor and the Surety Company that the Contractor is failing. The Surety Company and the Contractor shall provide a written plan to State Representative to restore the projects delivery.

C. After three (3) or more notifications, UDOT may suspend the Contractor's Contract.

7.12 Project Completion and Walk Through

The Contractor will notify the State Representative of notice of completion. The State Representative will inspect the project and provide the Contractor with a punch list within four (4) calendar days of notice of completion. The Contractor will have ten (10) calendar days to complete punch list items (if needed).

7.13 Invoicing

Contractor shall submit invoices to the State Representative in a timely manner. The Contract number shall appear on all invoices and correspondence. Invoices must include:

A. locations of work B. Itemized work items and quantity C. Date of work

7.14 Payment Approval

The State Representative will verify completion of the punch list before payment. There will be no partial payments for this contract unless approved by the State Representative in writing. It is expected most work from this contract will be small projects, to be completed quickly. The intention is to encourage work in a timely manner, encourage proactive response to issues, and to discourage projects left open.

8.0CONTRACTOR TRAFFIC CONTROL
8.1The Contractor will comply with UDOT's policies, procedures, and safety standards for traffic control plans and the application of traffic control systems as set forth in the Manual on Uniform Traffic Control Devices or as amended by the Region Traffic Engineer. All traffic control phases must be pre-approved by the Region Traffic Engineer.
8.2The Contractor must provide proof of certification of trained traffic-control maintainer.
8.3Traffic control will be paid as outlined in the measurement and payment. UDOT reserves the opportunity to provide Traffic Control services with Department staff or a separate Contractor and will indicate such with each project request or solicitation.
9.0CONTRACTOR TRAINING
9.1Contractor shall have or obtain LTAP ADA training.
9.2For training schedule information please contact Kaitlin Marousis at 507 202-9311, for information concerning upcoming training sessions:
10.0PROJECT AWARDING
10.1Type I - Work Order Awarding

A. Type I – work orders will be awarded to the Contractor with the lowest overall cost for the work order based on submitted contract work item pricing and preliminary estimated quantities by UDOT (see Itemized Price List). UDOT will then notify the contractor of Notice of Award.

10.2 Type II - Work Order Awarding

A. UDOT will prepare a solicitation (see Type II Template) for the proposed work and distribute it to all approved Contractors as a separate and individual project. This will include:

1. Written scope of work

2. Date of Mandatory site meeting (If contractor does not come bid will not be accepted)

a. In the case of only one contractor attending the Mandatory Site Visit then UDOT may bid the project off contract.

b. Mandatory Site Visit RSVP at least 24 hours in advance is requested by UDOT.

3. Required project schedule either start or completion date

4. Limits of Operation

5. If Traffic Control is part of the bid or completed by UDOT or a separate party B. Contractors choosing to propose will have a minimum of five (5) calendar days after site visit to submit cost proposals. Unless otherwise stated in Type II Template.

1. Contractors’ cost proposal for any specific item cannot exceed the unit cost provided in Itemized Price List, but may provide a lower unit cost if preferred.

C. UDOT will select the winning bid, based on lowest overall cost, within four (4) calendar days after the provided bidding time has expired and notify the Contractor of Notice of Award.

10.3 Emergency Work Awarding

Emergency work generally must be addressed within a short time period. Due to the nature of these projects, they may be awarded to any approved Contractor with the available personnel to respond within the given time constraints, as defined by UDOT Procurement Code.

10.4 Contractor Response

Contractor’s awarded Type I or Type II work may choose to accept or decline the project. Response time for each work order is dependent on the type of work order provided by UDOT. See Work Order options Section above for work order type.

A. Type I - Under the terms of the Contract, the Contractor will be required to accept or decline the work order within four (4) calendar days of receiving Notice of Award (unless deemed Emergency Work).

1. Upon accepting the work order, the Contractor will be required to 1) submit a schedule of proposed work (the schedule will require the start of work within fourteen (14) calendar days of acceptance unless specified otherwise by the State Representative), 2) submit a traffic control plan, within five (5) calendar days (if required), and 3) provide a Payment and Performance Bond, within five (5) calendar days (if required).

2. If the work order is declined, or the Contractor is non-responsive, it will be offered to the next applicable Contractor approved by this Contract with the lowest bid.

3. The Contractor will be considered “non-responsive” if no response is provided within the four (4) calendar day period.

Note: Three (3) documented events of “non-responsiveness” may result in the removal of the Contractor from this Contract at UDOT’s discretion.

B. Type II - the Contractor will be required to accept or decline the work order within four (4) calendar days of receiving Notice of Award (unless deemed Emergency Work or defined otherwise in Attachment C).

1. Upon accepting the work order, the Contractor will be required to 1) submit a schedule of proposed work (in compliance with the schedule shown in Type II Template), 2) submit a traffic control plan, within five (5) calendar days (if required), and 3) provide a Payment and Performance Bond, within five (5) calendar days (if required).

2. If the work order is declined, or the Contractor is non-responsive, it will be offered to the next lowest bidder.

3. The Contractor will be considered “non-responsive” if no response is provided within the four (4) calendar day period.