77-4 Innovative Controls SCADA and Industrial Automation.pdf
PDF 441 KB Posted
- Solicitation number
- RFB-25-26-06
- Issued by
- Tulare County, California
About this file
This document is a project scope and technical specification for the Cameron Creek SCADA (Supervisory Control and Data Acquisition) system, prepared by Innovative Controls for Provost and Pritchard, dated 3/14/25. The project involves implementing a comprehensive SCADA system across three sites: Lovers Lane, Flow Site, and Rubicon Site. The system will utilize Programmable Logic Controllers (PLCs), Modbus RTU RS485 communication, and a network infrastructure including cellular modems, firewalls, switches, and 900 MHz Ethernet radios to enable remote monitoring and control of gate operations and water flow.
The technical implementation includes solar-powered infrastructure with 12vdc 200-watt solar panels, solar charge controllers, and 12vdc 100ah AGM batteries at each site to ensure continuous operation. Each site has specific input and output configurations: Lovers Lane will monitor gate position, upstream level, and operational modes; the Flow Site will track upstream level and flow meter readings; and the Rubicon Site will manage North and South Rubicon gates. The system is designed to allow operators to set control and alarming setpoints through an Ignition HMI (Human-Machine Interface), with PLC programming that uses PID algorithms to maintain upstream levels and manage gate positions based on water availability and operational parameters.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Lic. 965664
To: Provost and Pritchard
Attn:
Project: Camerson Creek SCADA system
Date: 3/14/25
Project Scope:
Electrical control schematics will be provided by manufacturer of gates. ICSCADA will interface with these electrical controls through a PLC (Programmable Logic Controller) which will be programmed for the specific task of the site.
Lovers Lane site will act as a master radio to the flow and rubicon sites. A cellular modem gives the connection from TID (Tulare Irrigation District) over WAN. Communications will filter through a firewall and out to a switch allowing communications to all three PLCs.
Lovers Lane
1. Aquasystems 2000 controls are all done by Digital Inputs/Outputs and monitoring of
Analog Inputs.
a. Digital Inputs:
i. Hand Off Auto Switch
ii. Alarm
b. Digital Outputs:
i. Open Gate
ii. Close Gate
c. Analog Inputs
i. Upstream Level
ii. Gate Position
2 | P a g e
1. Analog values are scaled to instruments specs
a. 4ma Minimum
b. 20ma Maximum
2. PLC will be programmed to control the position of the gate to maintain upstream level through PID algorithm.
a. PID setpoints will be administered when water is available.
3. Control Setpoints and Alarming Setpoints will be provided by Operators over Ignition
HMI along with Alarming.
a. Control and Alarming setpoints are tested under the amount of water available at the time of startup, operator dictates these setpoints when Integrator hands over finished product.
Rubicon’s
1. Interfacing with the gates is provided by Modbus RTU RS485. Each gate will have its own Node Address typically in the range of 2-254.
2. PLC will act as the client to the servers (Rubicon’s). PLC will be programmed to control the position of the gate to maintain a relative flow or level through PID algorithm.
a. PID setpoints will be administered when water is available.
3. Communications between PLC and Rubicon’s will be monitored, if Rubicon’s do not report back within a specified amount of time, alarming will be sent to Operators.
4. Based on height of Rubicon’s and relative level/flow to setpoint will dictate which
Rubicon moves first.
5. Control Setpoints and Alarming Setpoints will be provided by Operators over Ignition
HMI along with Alarming.
a. Control and Alarming setpoints are tested under the amount of water available at the time of startup, operator dictates these setpoints when Integrator hands over finished product.
Flow Site
1. Flow and Upstream Level will be provided over Analog Input.
a. Analog values are scaled to instruments specs
i. 4ma Minimum
ii. 20ma Maximum
Mattk Text Box Measurement Structure
Mattk Text Box Rector Structure
Communications Diagram
Firewall
Cellular
Modem
Lovers Lane
PLC
900 Mhz
Ethernet Radio
Flow Site PLC Rubicon Site
PLC
Switch
900 Mhz
Ethernet Radio
900 Mhz
Ethernet Radio
Mattk Text Box Rector Structure
Mattk
Measurement Structure
Analog
Inputs
Digital
Digital
Outputs
Lovers Lane Gate Site
Analog Inputs
Digital Inputs
Digital Inputs
U/S
Level 1
Gate
Position 2
Field
Auto
Field
Hand
Fault
Open
Gate
Close
Gate
#12 THHN (Solar and Battery Connection)
20AMP 20AMP
12vdc 200 Watt
Solar Panel
Solar Charge
Controller
12vdc 100ah AGM
Batteries
Analog
Flow Site
Analog Inputs
U/S
Level 1
Flow
Meter 2
Solar Charge
Controller
Mattk
Rector Structure
RS485
North
Rubicon
South
Rubicon
Rubicon Site
12Vdc Power Connections
20Amp
20Amp
Solar Charge
Controller
North
Rubicon
South
Rubicon
Mattk
Measurement Structure