77-11 COV Standard Spec 8-5-23.pdf
PDF 2 MB Posted
- Solicitation number
- RFB-25-26-06
- Issued by
- Tulare County, California
About this file
The document is the City of Visalia Engineering Standard Specifications, a comprehensive municipal technical manual governing public works construction and infrastructure projects within the City of Visalia, California. The 248-page document establishes standardized technical requirements, materials specifications, construction methods, measurement and payment protocols, and quality control standards for various municipal infrastructure improvements, including roadways, utilities, drainage systems, concrete structures, landscaping, and other civil engineering projects. The specifications are designed to provide consistent guidelines for contractors, engineers, and city staff in executing public works construction, covering everything from earthwork and excavation to concrete pouring, pipeline installation, and surface restoration.
The specifications include detailed technical requirements for material quality, testing procedures, construction techniques, safety standards, and payment mechanisms. They incorporate references to state and federal standards, including California Department of Transportation (Caltrans) specifications, and provide comprehensive instructions on topics such as soil compaction, concrete mixing, pipeline installation, traffic control, utility protection, and environmental compliance. The document is structured to ensure high-quality infrastructure construction, worker safety, and consistent project delivery, with provisions for quality assurance, material testing, contractor qualifications, and dispute resolution. The specifications are intended to be used in conjunction with project-specific plans, special provisions, and other contract documents, providing a standardized technical foundation for municipal infrastructure projects in the City of Visalia.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF VISALIA
ENGINEERING STANDARD SPECIFICATIONS
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING DIVISION
AUGUST 5, 2013
PREPARED BY:
CITY OF VISALIA
ENGINEERING DIVISION
315 E. ACEQUIA AVE.
VISALIA, CA 93291
Engineering Standard Specifications August 5, 2013 i
TABLE OF CONTENTS Page No.
STANDARD SPECIFICATIONS
SECTION 1 GENERAL, DEFINITIONS, ABBREVIATIONS AND TERMS
1-1 General
1-2 Abbreviations
1-3 Definitions and Terms
1-4 References
SECTION 2 PROPOSAL REQUIREMENTS AND CONDITIONS
2-1 General
2-2 Examination of Site of Work, Plans, Specifications and Contract Documents
2-3 Form of Proposal
2-4 Conflict of Interest
2-5 Quantities
2-6 Unit or Lump Sum Prices
2-7 Proposal Guaranty
2-8 Designation of Subcontractors
2-9 Rejection of Non-Responsible Subcontractors
2-10 Opening of Proposals
2-11 Relief of Bidders
2-12 Rejection of Proposals
2-13 Ineligibility to Contract
2-14 Contractor Qualification Requirements
SECTION 3 AWARD AND EXECUTION OF CONTRACT
3-1 Award of Contract
3-2 Execution of Contract
3-3 Required Contract Securities, Insurance Certificate, Business Tax Certificate, Injury And Illness Prevention Plan
3-4 Return of Proposal Guarantees
3-5 Material Statement, Samples, and Guarantees
SECTION 4 SCOPE OF WORK
4-1 Intent of Plans and Specifications
4-2 Coordination, Interpretation, and Precedence of Plans and Specifications
4-3 Interpretations
4-4 Working Drawings
4-5 Conformity with Plans and Allowable Deviations
4-6 Existing Facilities and Structures Shown on Plans
4-7 Omissions in Plans and Specifications
4-8 Incorporation of Referenced Specifications
4-9 Work To Be Done
4-10 Changes
4-11 Extra Work
4-12 Notices, Change Orders, and Claims
4-13 Interim Cleanup and Liability for Failure to Provide
4-14 Detours
4-15 As-Built Plans
Engineering Standard Specifications August 5, 2013 ii
SECTION 5 CONTROL OF WORK
5-1 Authority of the Engineer
5-2 Standards
5-3 Contractor’s Responsibility for the Work
5-4 Contractor’s Equipment
5-5 Suitable Methods
5-6 Order of Work
5-7 Superintendence and Personnel
5-8 Emergency Availability
5-9 Preservation of Property
5-10 Protection of the Work
5-11 Rights of Way
5-12 Disposal of Material Outside the Right of Way
5-13 Electric And Water Service
5-14 Construction Surveying/Staking
5-15 Cooperation
5-16 Maintaining Drainage
5-17 Inspection During Construction; Meetings
5-18 Differing Site Conditions
5-19 Removal of Defective or Unauthorized Work
5-20 Surface Restoration
5-21 Final Cleanup
5-22 Final Inspection
5-23 Guarantee of Workmanship
5-24 Cost Reduction Incentive
5-25 Character of Workers
SECTION 6 CONTROL OF MATERIALS
6-1 Source of Supply and Quality of Materials
6-2 Storage and Protection of Materials
6-3 Defective Material
6-4 Trade Names or Equal
6-5 Certificates of Compliance
6-6 Foreign Materials
6-7 Local Materials
6-8 Samples and Tests
6-9 Compaction Tests
6-10 Guarantee of Materials
6-11 Salvage of Materials
6-12 Materials Hauling
6-13 Material Submittal Package
SECTION 7 LEGAL RELATIONS AND RESPONSIBILITY
7-1 Laws to be Observed
7-2 Labor Code Requirements
7-3 Contractor’s Licensing Laws
7-4 Contractor’s Insurance Requirements and Hold Harmless
7-5 Vehicle Code
7-6 Air Pollution Control
7-7 Water Pollution Prevention
7-8 Use of Pesticides
Engineering Standard Specifications August 5, 2013 iii
7-9 Payment of Taxes
7-10 Permits and Licenses
7-11 Sanitary Regulations
7-12 Safety Provisions; First Aid; Injury/ Illness Prevention Program
7-13 Worker Protection from Toxic or Explosive Gases; Confined Spaces Entry
7-14 Trenches and Excavations; Hazardous Waste
7-15 Worker Protection from Caving Ground in Excavations
7-16 Injury or Damage to Persons or Property
7-17 Public Convenience
7-18 Public Safety
7-19 Patents
7-20 Property Rights of Materials
7-21 Amendments to Contracts
7-22 Verbal Statements not Binding
7-23 Guarantee
7-24 Firearms Prohibited
7-25 Sound Control Requirements
SECTION 8 PROGRESS AND PROSECUTION
8-1 Sequence and Progress of the Work
8-2 Assignment of Contract
8-3 Subcontracting
8-4 Preconstruction Conference
8-5 Construction Schedule
8-6 Beginning of Work
8-7 Notice to Residents
8-8 Time of Completion
8-9 Liquidated Damages
8-10 Right of Way Delays
8-11 Temporary Suspension of Work
8-12 Use of Completed Portions; City’s Right to Complete
8-13 Termination of Contract
8-14 Acceptance of Contract
8-15 Utility and Non-Street Facilities; Potholing
SECTION 9 MEASUREMENT AND PAYMENT
9-1 Measurement of Quantities
9-2 Cost Breakdown
9-3 Final Pay Items
9-4 Scope of Payment
9-5 Payment for Extra Work
9-6 Partial (“Progress”) Payments And Retentions
9-7 Required Releases
9-8 Prompt Progress Payments Due to Subcontractors
9-9 Stop Notices; City’s Right to Withhold Payments
9-10 Payment of Withheld Funds (Substitutions for retention)
9-11 Notice of Potential Claim
9-12 Final Progress Payment
9-13 Final Payment to Release Owner
9-14 Payment of Retention
SECTION 10 DUST CONTROL
Engineering Standard Specifications August 5, 2013 iv
10-1 Dust Control
10-2 Payment
SECTION 11 MOBILIZATION & DEMOBILIZATION
11-1 Description
11-2 Payment
SECTION 12 TRAFFIC CONTROL; CONSTRUCTION AREA TRAFFIC CONTROL
DEVICES
12-1 General
12-2 Traffic Control
12-3 Construction Area Traffic Control Devices
12-4 Measurement and Payment
SECTION 13 (RESERVED)
SECTION 14 (RESERVED)
SECTION 15 REMOVING EXISTING FACILITIES
15-1 General
15-2 Miscellaneous Facilities
15-3 Removing Concrete
15-4 Bridge, Concrete Culvert Removal
SECTION 16 CLEARING AND GRUBBING
16-1 Description
16-2 Preservation of Property
16-3 Construction
16-4 Removal and Disposal of Materials
16-5 Measurement
16-6 Payment
SECTION 17 WATER USE
17-1 Description
17-2 Application
17-3 Chemical Additives (Not Used)
17-4 Payment
SECTION 18 DUST PALLIATIVE
18-1 General
18-2 Payment
SECTION 19 EARTHWORK
19-1 General
19-2 Roadway Excavation
19-3 Trench and Structure Excavation, Backfill, and Surface Restoration
19-4 Embankment Construction
SECTION 20 LANDSCAPE CONSTRUCTION SYSTEMS
20-1 General
20-2 Measurement
20-3 Payment
SECTION 21 (RESERVED)
Engineering Standard Specifications August 5, 2013 v
SECTION 22 FINISHING ROADWAY
22-1 General
22-2 Materials
22-3 Construction
22-4 Payment
SECTION 23 (RESERVED)
SECTION 24 (RESERVED)
SECTION 25 AGGREGATE SUBBASES
25-1 General
25-2 Materials
25-3 Construction
25-4 Measurement & Payment
SECTION 26 AGGREGATE BASES
26-1 General
26-2 Materials
26-3 Construction
26-4 Measurement & Payment
SECTION 27 BITUMINOUS SEALS
27-1 General
27-2 Payment
SECTION 28 HOT MIX ASPHALT
28-1 General
28-2 Materials
28-3 Hot Mix Asphalt Design Requirements
28-4 Contractor Quality Control & City Quality Assurance
28-5 Production
28-6 Subgrade, Tack Coat, and Geosynthetic Pavement Layer
28-7 Spreading and Compacting Equipment
28-8 Transporting, Spreading, and Compacting
28-9 Smoothness
28-10 Additional Testing and Requirements
28-11 Measurement and Payment
SECTION 29 STORM DRAINAGE AND SANITARY SEWER FACILITIES
29-1 General
29-2 Submittals
29-3 Materials
29-4 Trenching and Excavation
29-5 Sewer and Storm Drain Pipeline Installation
29-6 Sewer Service Lateral Installation
29-7 Manhole Construction
29-8 Drainage Inlets
29-9 Backfill, Compaction, and Surface Restoration
29-10 Existing Utilities
29-11 Pipeline and Structure Acceptance Tests (Sanitary and Storm)
29-12 Alignment Changes (Separation Criteria)
29-13 Measurement
Engineering Standard Specifications August 5, 2013 vi
29-14 Payment
SECTION 30 (RESERVED)
SECTION 31 (RESERVED)
SECTION 32 (RESERVED)
SECTION 33 SANITARY SEWER FORCE MAINS (RESERVED)
SECTION 34 BORING AND JACKING PIPE
34-1 General
34-2 Materials
34-3 Tunnel Safety Orders
34-4 Excavating Jacking and Receiving Pits
34-5 Boring and Jacking
34-6 Grade Tolerance
34-7 Frac-Out Contingency Plan
34-8 Backfill, Compaction, Restoration of Surfaces
34-9 Measurement
34-10 Payment
SECTION 35 (RESERVED)
SECTION 36 (RESERVED)
SECTION 37 MISCELLANEOUS IMPROVEMENTS
37-1 General
37-2 Survey Monuments
37-3 Adjusting Existing Facilities to Finish Grade
37-4 Relocation of Walls, Fences, and Mailboxes
37-5 Measurement and Payment
SECTION 38 CONCRETE CURBS, SIDEWALKS, SURFACE IMPROVEMENTS
38-1 General
38-2 Portland Cement Concrete
38-3 Reinforcement
38-4 Subgrade Preparation
38-5 Construction
38-6 Finish
38-7 Tolerances
38-8 Curing
38-9 Backfilling
38-10 Measurement
38-11 Payment
SECTION 39 PERVIOUS CONCRETE PAVEMENT
39-1 General
39-2 Quality Assurance:
39-3 Materials
39-4 Execution
39-5 Quality Control:
39-6 Measurement and Payment
SECTION 40 (RESERVED)
Engineering Standard Specifications August 5, 2013 vii
SECTION 41 CHAIN LINK FENCE, GATES & TIMBER BARRICADES
41-1 General
41-2 Materials
41-3 Clearing and Grubbing
41-4 Excavation and Preparation Of Subgrade
41-5 Construction
41-6 Measurement
41-7 Payment
SECTION 42 CONCRETE MASONRY WALL/FENCE (RESERVED)
SECTION 43 FIBER OPTIC FACILITIES (RESERVED)
SECTION 44 (RESERVED)
SECTION 45 SIGNALS, LIGHTING, AND ELECTRICAL SYSTEMS
45-1 Description
45-2 Equipment List and Drawings
45-3 Certificate of Compliance
45-4 Foundations
45-5 Miscellaneous Concrete Construction and Removal
45-6 Standards, Steel Pedestals, and Posts
45-7 Conduit
45-8 Pull Boxes
45-9 Conductors And Wiring
45-10 Signal Cable
45-11 Service
45-12 Functional Testing
45-13 Painting
45-14 Model 170E Controller Assemblies
45-15 Modulated Light Signal Detection System
45-16 Vehicle Signal Faces and Signal Heads
45-17 Light Emitting Diode Green and Yellow Module
45-18 Pedestrian Signals
45-19 Detectors
45-20 Pedestrian Push Buttons
45-21 Safety and Street Lighting
45-22 Removing, Reinstalling, or Salvaging Electrical Equipment
45-23 Traffic Signal Street Name Signs
45-24 Traffic Signal Battery Back-Up System
45-25 Traffic Signal Interconnect Conduit
45-26 Median Lighting
45-27 Measurement and Payment
SECTION 46 TRAFFIC STRIPES, SIGNS, AND PAVEMENT MARKINGS
46-1 General
46-2 Materials
46-3 Removal of Existing Markings
46-4 Application Equipment
46-5 Application of Paint and Glass Beads
46-6 Traffic Sign Installation
46-7 Measurement
46-8 Payment
Engineering Standard Specifications August 5, 2013 viii
SECTION 47 RAISED PAVEMENT MARKERS
47-1 General
SECTION 48 ENGINEERING FABRICS
SECTION 49 (RESERVED)
SECTION 50 PORTLAND CEMENT CONCRETE
SECTION 51 PAINT
SECTION 52 ASPHALTS
SECTION 53 LIQUID ASPHALTS
SECTION 54 ASPHALTIC EMULSIONS
SECTION 55 EPOXY
Engineering Standard Specifications August 5, 2013 1
STANDARD SPECIFICATIONS
Copies of the “City of Visalia Engineering Standard Specifications” may be obtained from the City of Visalia website at: http://www.ci.visalia.ca.us/depts/engineering/engineering_documents/default.asp or from City Hall East, 315 E. Acequia Ave., Visalia, California, 93291, for a nominal fee.
SECTION 1 GENERAL, DEFINITIONS, ABBREVIATIONS AND TERMS
1-1 General
Unless the context otherwise requires, wherever in these Standard Specifications and other Contract Documents the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as provided in this Section 1.
Reference to a particular section in these Standard Specifications is made by section number without denoting “of these Standard Specifications.” Reference to standard specifications or standards of other agencies or organizations is so noted. See Section 4-8, “Incorporation of Referenced Specifications.”
Where a location is not specified with the words "shown," "specified," or "described," interpret:
A. "Shown" as "shown on the plans."
B. "Specified" as "specified in the specifications."
C. "Described" as "described in the Contract." "Described" means "shown, specified, or both."
The specifications are expressed in U.S. customary units except where a referenced document uses the International System of Units as the standard.
These Standard Specifications and Contract Documents are meant to work in direct line with Sections 10- 60, Section 73, and Sections 82-95 of the 2010 version of the State Standard Specifications, except as modified by these Standard Specifications and Contract Documents. For terms, specifications, and requirements appearing in these Standard Specifications and Contract Documents and the State Standard Specifications, these Standard Specifications and Contract Documents shall take precedence. Other sections of the State Standard Specifications are included by reference in these Standard Specifications and Contract Documents. In the event where items are not covered or specified in these Standard Specifications or Contract Documents, the State Standard Specification Sections listed above and State Standard Plans shall govern.
Engineering Standard Specifications August 5, 2013 2
1-2 Abbreviations
Where used in these Standard Specifications and Contract Documents, the following abbreviations shall have the titles affixed thereto in the table below.
Abbreviations
Abbreviation Meaning
AASHTO American Association of State Highway and Transportation Officials
AB aggregate base
AC asphalt concrete
ACI American Concrete Institute
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ANSI American National Standards Institute
AS aggregate subbase
ASTM American Society for Testing and Materials
AWG American Wire Gauge
AWS American Welding Society a
AWWA American Water Works Association
BBS battery backup system
Cal/OSHA California Division of Occupational Safety and Health Administration
CBC California Building Code
CIP cast in place
CMP corrugated metal pipe
CMU concrete masonry unit
DBE Disadvantaged Business Enterprise
F Fahrenheit
FHWA Federal Highway Administration
HMA hot mix asphalt
MSDS material safety data sheet MUTCD California Manual on Uniform Traffic Control Devices
NPDES National Pollutant Discharge Elimination System
PCC portland cement concrete
PLAC permit, license, agreement, certification, or any combination of these
PG performance grade
PVC Polyvinyl Chloride
RAP reclaimed asphalt pavement
RCP reinforced concrete pipe
RFI request for information
RWQCB Regional Water Quality Control Board
SCM Supplementary Cementitious Material
SWPPP storm water pollution prevention plan
TV target value
UL Underwriters Laboratories, Inc
WPCP water pollution control program a Interpret a reference to AWS as a reference to AWS, ANSI/AWS, or AASHTO/AWS
Engineering Standard Specifications August 5, 2013 3
Bid Item List Abbreviations
Abbreviation Meaning
ACRE acre
CF cubic foot
CY cubic yard
EA each
(F) final pay item
GAL gallon
H hour
LB pound
LF linear foot
LS lump sum
STA station (100 feet)
SF square foot
SQYD square yard
TON 2,000 pounds
WDAY working day
1-3 Definitions and Terms
The definitions and terms as used in these Standard Specifications and Contract Documents shall be interpreted and understood as established in this Section 1:
1-3.1 Acceptance
The formal acceptance by the City Council of an entire contract, which has been completed in all parts and requirements in accordance with the Contract Documents and any modifications thereof, previously approved. The “Notice of Completion” shall mean the document recorded with the Tulare County Recorder indicating the formal acceptance of a specified Contract.
1-3.2 Addenda
Written interpretations or revisions to any of the Contract Documents issued by the City before the bid opening.
1-3.3 Base
A layer of specified material of planned thickness placed immediately below the pavement or surfacing.
1-3.4 Basement Material
The material in excavation or embankments underlying the lowest layer of subbase, base, pavement, surfacing or other specified layer which is to be placed. See Section “Subgrade.”
1-3.5 Bid
The proposal submitted by the Contractor in response to the invitation to bid made by the City.
1-3.6 Bid Book or Bid Document
These terms shall have the same meaning as Construction Specifications.
1-3.7 Bidder
Any individual, firm, partnership, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.
Engineering Standard Specifications August 5, 2013 4
1-3.8 California Manual On Uniform Traffic Control Devices (California MUTCD)
The most current adopted version of The California Manual on Uniform Traffic Control Devices for streets and highways, and amendments thereto, hereinafter referred to as California MUTCD or CA MUTCD. Supersedes the MUTCD and MUTCD California Supplement.
1-3.9 Certificate of Compliance
Certificate stating the material complies with the Contract Documents.
1-3.10 Certified Testing Laboratory
An established laboratory properly certified and approved by the Community Development Director to test materials, specimens, or work involved in the Standard Specifications and Contract Documents, and as specified herein.
The materials laboratory shall be under the responsible management of a California Registered Engineer with experience in sampling, inspection and testing of construction materials. The Engineer shall certify the results of all tests performed by laboratory personnel under the Engineer’s supervision. The materials laboratory shall contain certified test equipment capable of performing the tests required.
The materials laboratory used shall provide documentation that the laboratory complies with the following procedures:
A. Correlation Testing Program
The materials laboratory shall be a participant in one or more of the following testing programs:
1. AASHTO Materials Reference Laboratory (AMRL)
2. Cement and Concrete Reference Laboratory (CCRL)
3. Caltrans’ Reference Samples Program (RSP)
B. Certification of Personnel
The materials laboratory shall employ personnel who are certified by one or more of the following:
1. Caltrans District Materials Engineer
2. Nationally recognized non-Caltrans organizations such as the American Concrete Institute, Asphalt Institue, National Institute of Certification of Engineering Technologies, etc.
3. Other recognized organizations approved by the State of California and/or Recognized by local governments or private associations.
C. Laboratory and Testing Equipment
The materials laboratory shall only use laboratory and testing equipment that is in good working order. All such equipment shall be calibrated at least once each year. All testing equipment must be calibrated by impartial means using devices of accuracy traceable to the National Institute of Standards and Technology. A decal shall be firmly affixed to each piece of equipment showing the date of the last calibration.
Engineering Standard Specifications August 5, 2013 5
1-3.11 Change Order
An order approved by the City of Visalia Change Order Committee and issued to the Contractor amending the Contract Documents.
1-3.12 City (Owner)
The City of Visalia, California, acting as a municipal corporation and/or a trustee for improvement districts within the City. The term “Owner” and “City” shall have the same meaning.
1-3.13 City Clerk
The legally authorized City Clerk of the City of Visalia, California.
1-3.14 City Council
The City Council of the City of Visalia, California.
1-3.15 City Specifications
The City of Visalia Engineering Standard Specifications and other specifications included in them by virtue of reference, as amended from time to time.
1-3.16 City Standard Drawings or City Standard Plans
The City of Visalia Engineering Design & Improvement Standards, as amended from time to time.
1-3.17 Completion
A. For purposes of a Notice of Completion and Civil Code sections 9200-9208, “completion” means the date of acceptance of the Work as complete by the City Council. The Notice of Completion shall comply with the requirements of Civil Code sections 8100-8118.
B. For purposes of retention release under Public Contract Code section 7107, “completion” means any of the following:
1. The occupation, beneficial use, and enjoyment of a work of improvement, excluding any operation only for testing, startup, or commissioning, by the public agency, or its agent, accompanied by cessation of labor on the work of improvement.
2. The acceptance by the public agency, or its agent, of the work of improvement.
3. After the commencement of a work of improvement, a cessation of labor on the work of improvement for a continuous period of 100 days or more, due to factors beyond the control of the contractor.
4. After the commencement of a work of improvement, a cessation of labor on the work of improvement for a continuous period of 30 days or more, if the public agency files for record a notice of cessation or a notice of completion.
C. For all other purposes (including but not limited to assessment of liquidated damages), “completion” means the point where Contractor has fully and correctly performed all Work in all parts and requirements in accordance with the Plans, Specifications and the Contract Documents, a Final Inspection has been made, all corrective and punch list Work has been performed, all improvements and equipment are in a fully functioning condition, and the Engineer has certified that the Work is ready for acceptance by the City Council. “Completion” does not mean substantial completion or any other form of partial or insufficient performance of the Work.
Engineering Standard Specifications August 5, 2013 6
1-3.18 Contract or Contract Documents
The written agreement covering the performance of the work and the furnishing of labor, materials, tools and equipment in the construction of the work. The Contract or Contract Documents shall include the Contract Agreement, Notice to Contractors, Bid Proposal, Subcontractors List, Plans, the Standard Specifications by virtue of reference, the Construction Specifications, Special Provisions, Description of Bid Items, State & Federal Funding Requirements, Appendices, Contract Bonds, Addenda, documents incorporated by reference, Permits, attached exhibits and documents, and any and all supplemental agreements amending or extending the work contemplated and which may be required to complete the work in a substantial and acceptable manner. Supplemental agreements are written agreements covering alterations, amendments or extensions to the contract and include contract Change Orders.
1-3.19 Construction Specifications or Contract Specifications
The booklet containing the Notice to Contractors, Bid Proposal, Subcontractors List, Bidder’s Bond, Standard Specifications by virtue of reference, Special Provisions, Description of Bid Items, State & Federal Funding Requirements, Appendices, documents incorporated by reference, and any other exhibits and documents which may be added to the booklet.
1-3.20 Contractor
The person or persons, firm, partnership, corporation or combination thereof, private or municipal, who have entered into a contract with the City, as party or parties of the second part or his or their legal representative.
1-3.21 Days
Unless otherwise specified in these Standard Specifications or the Contract Documents, “days” mean calendar days.
1-3.22 Divided Roadway
A roadway with separated traveled ways for traffic, generally in opposite directions.
1-3.23 Encroachment
Any structure or object of any kind or character placed, without the authority of law, either in, under, or over any City right of way. An encroachment can include, but not be limited to, any tower, pole, pole line, pipe, pipeline, driveway, fence, stand, private roadway, billboard or sign.
Encroachments can also include special events conducted in or on City rights of way, such as street festivals, sidewalk sales, community-sponsored events or activities, or community-approved activities.
See “Permit.”
Encroachments also include any construction activities in or on City rights of way or other City property.
1-3.24 Engineer
The Engineer of the City of Visalia, California, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties delegated to them.
1-3.25 Engineer's Estimate
The list of estimated quantities of work to be performed as contained in the Bid Proposal Form.
Engineering Standard Specifications August 5, 2013 7
1-3.26 Engineer of Record or Design Engineer
The Engineer in responsible charge of designing and engineering the Plans and Construction Specifications.
1-3.27 Extra Work
Any obligations, construction, or service outside the scope of the contract.
1-3.28 Final Pay Item
See Section 9-3 “Final Pay Items” for a full description.
1-3.29 Finish Grade
The elevation or slope shown on the plans assigned to the design finished surface of an improvement, including earthwork which will receive no paving or other surfacing, after all work on the improvement has been completed.
1-3.30 Grading Plane
The surface of the basement material (subgrade) upon which the lowest layer of subbase, base, pavement, surfacing or other specified layer is placed.
1-3.31 Inspector
A duly authorized agent of the Engineer.
1-3.32 Laboratory or Testing Laboratory
See “Certified Testing Laboratory”.
1-3.33 Legal Holidays
Those days designated as City holidays by the Visalia City Council in observance of which City offices are closed.
1-3.34 Line and Grade
The term used to describe the horizontal and vertical lines, elevations and slopes shown on the plans to which all improvements and earthwork are to be constructed.
1-3.35 Liquidated Damages
The amount prescribed in the Special Provisions to be paid to the City or to be deducted from any payments due or to become due the Contractor for each day's delay in completing the whole or any specified portion of the work beyond the time allowed in the Contract Documents.
1-3.36 Median
That portion of a divided roadway separating the traveled ways for traffic in opposite directions including inside shoulders, if any. Medians may be raised or un-raised, paved or unpaved.
1-3.37 Non-Public Work or Non-Public Project
Any improvement being completed by developers, utility companies, other agencies, or any other individual, group, business, or entity within the City of Visalia street right of way or on other City of Visalia property that is not being funded and managed by the City as a public project.
Engineering Standard Specifications August 5, 2013 8
1-3.38 Notice of Award
The document issued to the Contractor along with the official Contract Documents package after the Contract award is issued by the Visalia City Council.
1-3.39 Notice to Proceed
The document issued to the Contractor, after all Contract Documents have been signed and pre-construction contract requirements have been met, authorizing the Contractor to start construction.
1-3.40 Pavement
The uppermost layer of material placed on the traveled way or shoulders. This term is used interchangeably with surfacing.
1-3.41 Permit
As used in these Standard Specifications, the document issued by a jurisdictional agency specifying the terms and conditions under which the permittee is authorized to perform certain work typically associated with a Contract awarded by the City. Permits may be issued by one or more agencies which have jurisdiction by law or by ownership over various aspects of the work. Permits may take the form of providing authorization to perform general roadwork, to install, construct, or repair certain encroachments, or govern such things as air pollution and storm water pollution prevention. The term “Encroachment Permit” describes the permit issued by the City Engineering Division and does not apply to Building Permits issued by the City Building Division. See “Encroachment.”
1-3.42 Permittee
The person or persons, partnership or corporation, private or public, who has obtained a permit from the City or other jurisdictional agency and who has agreed to do work encompassed by said permit in conformance with the requirements thereof.
1-3.43 Plans
The official Construction Plans which show the location, character, dimensions and details of the work to be performed. Standard Drawings (sometimes referred to as Standard Plans), profiles, typical cross sections, working drawings and supplemental drawings, or reproductions thereof, approved by the Engineer, are to be considered as a part of the Plans. As used in this definition, the term Standard Drawings refers to the City of Visalia Engineering Design & Improvement Standards.
1-3.44 Private Developer
An individual or group proposing to subdivide or improve land within the City and constructing or causing to be constructed improvements to be accepted by the City.
1-3.45 Proposal
The written offer of the bidder for the work when made out and submitted on the prescribed proposal form, properly signed and guaranteed.
1-3.46 Proposal Form (Also referred to as Bid Proposal)
The approved document upon which the City requires formal bids be prepared and submitted for the work.
Engineering Standard Specifications August 5, 2013 9
1-3.47 Proposal Guaranty
The cash, cashier's check, certified check or bidder's bond accompanying the proposal submitted by the bidder, as a guarantee that the bidder will enter into a contract with the City for the performance of the work if the contract is awarded to the bidder.
1-3.48 Public Work or Public Project
Any improvement being funded and managed by the City of Visalia.
1-3.49 Right of Way
The whole right of way or area which is reserved for and secured for use in constructing the roadway and its appurtenances.
1-3.50 Roadbed
The roadbed is that area upon which a traveled surface will be installed, generally between curbs delineating the edges of the traveled way. The roadbed rises in elevation as each increment or layer of subbase, base, surfacing or pavement is placed.
1-3.51 Roadway
That portion of the right of way included between the outside lines of sidewalks, or curbs, slopes, ditches, or channels, including all the appertaining structures, and other features necessary for proper drainage and protection.
1-3.52 Shoulders
The portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of base and surface courses. Shoulders may be paved or unpaved.
1-3.53 Special Provisions
The Special Provisions and other specifications included in them by virtue of reference.
1-3.54 Specifications
Where used, the term “Specifications” without modifier shall mean collectively these Construction Specifications and the Standard Specifications, embodying all the applicable specification documents therein.
1-3.55 Standard Drawings or Standard Plans
The City of Visalia Engineering Design & Improvement Standards, as amended from time to time.
1-3.56 Standard Specifications
The City of Visalia Engineering Standard Specifications and other specifications included in them by virtue of reference, as amended from time to time.
1-3.57 State of California Standard Specifications
The 2010 version of the Standard Specifications issued by the Department of Transportation (Caltrans) of the Business, Transportation and Housing Agency of the State of California.
1-3.58 State
The State of California Department of Transportation. This term is used interchangeably with Caltrans and has the same meaning.
Engineering Standard Specifications August 5, 2013 10
1-3.59 State Standard Plans
The 2010 version of the State of California, Department of Transportation Standard Plans.
1-3.60 State Standard Specifications
The 2010 version of the Standard Specifications issued by the Department of Transportation (Caltrans) of the Business, Transportation and Housing Agency of the State of California.
1-3.61 Subbase
A layer of specified material of planned thickness between a base and the basement material.
1-3.62 Subgrade
That portion of the roadbed on which pavement, surfacing, base, subbase, or a layer of any other material is placed. See “Basement Material.”
1-3.63 Substantial Completion
Substantial completion shall refer to a stage of construction where the Contractor has fully and correctly performed all Work in all parts and requirements in accordance with the Plans, Standard Specifications and the Contract Documents, all improvements and equipment are in a fully functioning condition, the Contractor has performed the final cleanup, and the project is ready for final inspection.
1-3.64 Surety
"Surety" or "Corporate Surety" refers to a corporate surety company included on the State of California, Department of Insurance, Admitted Sureties List, most current edition, and acceptable to the City.
1-3.65 Surfacing
The uppermost layer of material placed on the traveled way, or shoulders. This term is used interchangeably with pavement.
1-3.66 Traffic Lane
The portion of a traveled way for the movement of a single line of vehicles.
1-3.67 Traveled Way
The portion of the roadway for the movement of vehicles, generally between faces of curbs.
1-3.68 Unauthorized Work
Work performed beyond the lines and grades described in the Contract or established by the Engineer or extra work performed without authority.
1-3.69 Work
All the obligations and construction specified, indicated, shown, required or contemplated in the Contract Documents, including all alterations, amendments or extensions thereto made by Contract Change Order or other written orders of the Engineer, and including all punch list, corrective work, as-built or as-constructed drawings, and manuals at the end of the construction. The Work shall not include work being performed by the Owner (by itself or through other contractors) that is merely related to the Work.
Engineering Standard Specifications August 5, 2013 11
1-3.70 Working Days
Unless otherwise designated, working day as used in these Standard Specifications and Contract Documents shall mean any day on which the Contractor is not prevented by inclement weather, or conditions resulting therefrom, from proceeding with substantial prosecution of the work, excluding Saturdays, Sundays, legal holidays, and any other day the Contractor is specifically required by the Special Provisions to suspend construction operations.
1-4 References
Where the version of a referenced document is not specified, use the current version in effect on the date of the Notice to Contractors.
State Specifications Whenever the State Specifications are referenced and terms are used, they shall be understood to mean the following:
“State,” or “Department,” shall mean “City”.
Where “State Highway Engineer” and “Engineer” are used, it is understood that they refer to and mean, the City Engineer of the City of Visalia or his authorized delegate.
Laboratory – For Public projects, the designated laboratory authorized/hired/selected by the City of Visalia to test materials and work involved in the contract. For Non-Public projects the designated laboratory hired by the entity responsible for the project and approved by the City of Visalia.
For terms, specifications, and requirements appearing in the State Specifications and the Contract Documents, the terms, specifications, and requirements in the Contract Documents shall take precedence.
Engineering Standard Specifications August 5, 2013 12
SECTION 2 PROPOSAL REQUIREMENTS AND CONDITIONS
2-1 General
The City Purchasing Division will receive at the Front Counter at City Hall West, 707 W. Acequia, Visalia, California, 93291 prior to the hour and day specified in the "Notice to Contractors”, sealed proposals for furnishing materials, supplies, equipment and labor for performing the work as specified in the Plans, the Specifications, and the Contract Documents. Proposals submitted at or after the hour specified for receipt of bids will be returned unopened.
2-2 Examination of Site of Work, Plans, Specifications and Contract Documents
The bidder is required to carefully examine the site of the proposed work and the Contract Documents, Plans and Specifications for the work contemplated. The work embraced herein shall be done in accordance with the Contract Documents.
Bid submission shows the bidder has investigated the site and is satisfied as to the conditions to be encountered and the scope of work, and understands the requirements of the Plans, Specifications, and other Contract Documents. Bid submission is your acknowledgment that you have examined the job site, plans, construction specifications, and bid documents and are satisfied with:
A. General and local conditions to be encountered
B. Character, quality, and scope of work to be performed
C. Quantities of materials to be furnished
D. Character, quality, and quantity of surface and subsurface materials or obstacles
E. Requirements of the Contract
Prospective bidders must satisfy themselves, by such means as they prefer, as to local conditions and all other matters which influence their bid for the work. The City or Engineer shall not be liable on account of any obstructions of any nature, unforeseen difficulties in construction, or unreliable information from any source.
It is the Contractor’s responsibility to inform the Engineer and seek correction or clarification upon discovering any error or omission in the Plans, Specifications, or other Contract Documents prior to proceeding with the described work. The Contractor will be liable for any resultant damage where he “recognized such error, inconsistency or omission and knowingly failed to report it to the Engineer”. The Contractor will bear no liability for any errors which he discovers and reports to the Engineer.
Existing improvements visible at the job site, for which no specific disposition is made on the Plans, but which could reasonably be assumed to interfere with the satisfactory completion of the improvements contemplated by the Plans, shall be removed and disposed of by the Contractor at his expense.
The locations of existing facilities that are shown on the Plans are approximate. Exact locations of existing utilities shall be determined by the Contractor by whatever means necessary, including hand digging, with the possible assistance of the utility companies and located in the field by the Contractor prior to the construction of any improvements required by the Contract. Any additional cost incurred because of the Contractor’s failure to field verify locations of existing utilities prior to construction shall be paid for by the Contractor.
Engineering Standard Specifications August 5, 2013 13
2-3 Form of Proposal
All proposals must be submitted upon the blank forms included in this bid document which can be obtained from the City Purchasing Division at City Hall West, 707 W. Acequia, Visalia, California, 93291. This bid document must be submitted in its entirety with no pages removed. All addendums issued during the bidding process must be signed and submitted with the bid document. The bid document contains a contract that will be used with the bid proposal. A separate bid bond with appropriate attachments may be stapled to the inside front cover of the bid document in lieu of using the forms provided in the Section “Bidders Bond.” All proposals must give the unit price where indicated, or lump sum where unit prices are not called for, for each of the items. Proposals are to be filled out completely and must be signed by the bidder with his address, all as indicated on the proposal form. If the proposal is made by an individual, his name and post office address must be shown. If made by a firm or partnership, the name and post office address of each member of the firm or partnership must be shown. If made by a corporation, the proposal must show the name of the state under the laws of which the corporation was chartered and the names, titles and business address of the president, secretary, treasurer and manager thereof. The Bid Proposal Form includes the following documents, all of which are to be completed in all respects and submitted as a complete package: Bid Proposal, Bid Proposal Contract, Bid Schedule, Bidder’s Information, Subcontractors List, Contractor’s Reference Form, Non collusion Affidavit, Drug Free Workplace Certification and Bid Security. Depending on the nature of the project, other documents may be included by the City and shall be completed in all respects and submitted by the bidder with the Bid Proposal Form or as otherwise indicated by the City. All proposals must be submitted under sealed cover. See the Notice to Contractors for additional proposal requirements.
All other forms, exhibits, certifications, declarations, and other documents included in the bid book must be completed by the Contractor and submitted with the bid.
2-4 Conflict of Interest
No employee of the City shall be eligible to submit a proposal for, or to subcontract for any portion of, or to supply any materials for any contract administered by the City.
2-5 Quantities
The estimates of the quantities of work to be performed and materials to be furnished given in the Notice to Contractors, Bid Proposal and in the Construction Specifications are approximate only, being given as a basis for the comparison of bids. The City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work that may be deemed necessary or expedient by the Engineer. Reference is made to Section 4-10, “Changes,” regarding changes to quantities.
2-6 Unit or Lump Sum Prices
The unit or lump sum prices inserted in the bid form by the bidder will be considered to be the bid prices for the various bid items of work performed. In case of a discrepancy between the unit price bid and the calculated total for any bid item, the unit price shall govern. In case of a discrepancy between the unit or lump sum price in words and figures provided on the Bid Proposal, the lump sum or unit price quoted in words shall prevail.
2-7 Proposal Guaranty
All bids shall be presented under sealed cover and shall be accompanied by either a cash, cashier’s check, certified check, or Bidder’s Bond of a corporate surety authorized to do business in the State of California and acceptable to the City, made payable to the City of Visalia for an amount equal to at least ten percent (10%) of the amount of said bid. No bid shall be considered unless such cash, cashier’s check, certified
Engineering Standard Specifications August 5, 2013 14 check, or Bidder’s bond is enclosed herewith. Checks or bonds must be made payable to the City of Visalia, such securities to be retained by the City as a guarantee that the Bidder, if his bid is accepted, will enter into a satisfactory contract within ten (10) days, not including Saturday, Sundays and legal holidays, from the date that the bidder has received notice that the contract has been awarded “Notice of Award” is mailed or e-mailed to the Bidder, and will furnish a good and sufficient bond for faithful performance thereof and for payment of labor and material costs in accordance with the requirements of the Contract Documents.
2-8 Designation of Subcontractors
The Contractor shall comply with the California Subletting and Subcontracting Fair Practices Act, commencing with Section 4100 of the State Public Contract Code. The Contractor shall file with the bid the name and address of each subcontractor who will perform more than one-half of one percent (½ %) of the contract amount, or in the case of a project designated by the City as a Street Project, one half of one percent of the contract amount or ten thousand dollars ($10,000), whichever is greater. To determine the value of work subcontracted, where an entire item is subcontracted, the value of work subcontracted will be based on the contract item bid price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the contract item bid price, determined from information submitted by the Contractor, subject to approval by the Engineer.
Only one subcontractor shall be listed for each portion of the work. The portion shall be defined as to its nature and extent. The failure of the Contractor to specify a subcontractor constitutes a statement that the Contractor is qualified and intends to perform said work.
Designation of subcontractors must be made upon forms included with the bid package or to be obtained from the office of the City Engineer at City Hall. The bidder must give the names of all the subcontractors and the form must be signed by the bidder.
The Contractor must have the consent of the City and approval of the Engineer, in writing, to substitute a subcontractor other than that designated in the original bid, to permit any subcontract to be assigned or transferred, to allow a subcontract to be performed by other than the original subcontractor, or to subcontract work for which no subcontractor was designated in the original bid and which is more than one-half of one percent (½ %) of the contract amount, or in the case of a City-designated Street Project, one half of one percent or ten thousand dollars ($10,000), whichever is greater.
Violation of any of the above provisions is a violation of the Contract and cause for ordering any unapproved subcontractor from the work site. The Contractor shall comply with Section 8-3, “Subcontracting,” which contains additional regulations regarding subcontractors.
2-8.1 City Right to Reject Subcontractors
Pursuant to state law City may reject subcontractors that the City has determined to not be a responsible contractor and require Contractor to substitute that specific subcontractor.
2-9 Rejection of Non-Responsible Subcontractors
Any bid may be withdrawn at any time prior to the time fixed in the “Notice to Contractors” for the opening of bids only upon written request for the withdrawal of the bid filed with the City. The request shall be executed by the Bidder or his duly authorized representative. The withdrawal of the bid does not prejudice the right of the Bidder to file a new bid. A bid will not be received after the time, nor any bid withdrawn after the time fixed in the public notice for the opening of bids until either all bids are rejected, or until the expiration of sixty (60) days set from the date set for the opening of bids, or until the contract
Engineering Standard Specifications August 5, 2013 15 has been executed and the required Contractor’s bonds furnished by the successful Bidder or Bidders, whichever occurs first.
2-10 Opening of Proposals
Proposals will be opened and read publicly at the time and place indicated in the “Notice to Contractors”.
Bids will be opened identifying Bidder and amount. Bidders, or their authorized agent, are invited to be present. City will review bid package for completeness and accuracy subsequent to opening.
2-11 Relief of Bidders
The provisions of Public Contract Code Sections 5100 to 5110, inclusive, applies to all Contracts. If the bidder claims a mistake was made in the bid presented, the bidder shall give the Engineer written notice within 5 days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred.
2-12 Rejection of Proposals
The City reserves the right to reject any or all proposals. Proposals may be rejected if they show any alteration of form, additions not called for, conditional or alternative bids, incomplete bids, erasures, or irregularities of any kind. Proposals in which the prices are obviously unbalanced may be rejected. The City may reject all bids for budgetary reasons.
More than one proposal from an individual, a firm or partnership, a corporation or an association under the same or different names, will not be considered. Reasonable grounds for believing that any bidder that submitted a bid as a General or Prime Contractor is interested in more than one proposal for a Project will cause the rejection of all proposals in which such bidder is interested. A Contractor who is not submitting a bid as the General or Prime Contractor may submit any number of sub-bids to competing General or Prime Contractors.
This bid document must be submitted in its entirety with no pages removed. All addendums issued during the bidding process must be signed and submitted with the bid document.
A Bid Protest/Dispute/Challenge must be submitted in writing within 5 working days from award of the project to:
Purchasing 707 W. Acequia Avenue
Visalia, CA 93291
2-13 Ineligibility to Contract
The City requires all bidders to comply with the requirements of Public Contract Code Section 10285.1.
The City shall have the same rights as a State Agency under Section 10285.1, which provides as follows:
“Any state agency may suspend, for a period of up to three years from the date of conviction, any person from bidding upon, or being awarded, a public works or services contract with the agency under this part or from being a subcontractor at any tier upon the contract, if that person, or any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, has been convicted by a court of competent jurisdiction of any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Section 1101, with any public entity, as defined in Section 1100, including, for the purposes of this article, the Regents of the University of California or the Trustees of the California State University. A state agency may determine the eligibility of any person
Engineering Standard Specifications August 5, 2013 16 to enter into a contract under this article by requiring the person to submit a statement under penalty of perjury declaring that neither the person nor any subcontractor to be engaged by the person has been convicted of any of the offenses referred to in this section within the preceding three years”.
2-14 Contractor Qualification Requirements
All Contractors, General Contractors and Subcontractors, working on non-public and public projects within City of Visalia street right of way or other City of Visalia property shall have a minimum of three years of past experience with projects of a similar size and nature to the proposed project unless otherwise approved by the City Engineer. The burden of proof shall be the responsibility of the Contractor. All General Contractors shall be required to submit a complete CONTRACTOR’S REFERENCE FORM with their bid. A blank copy of this form is located in the front end portion of the bidding documents.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .