B05 Amdnment A0001-75H70126R00028.pdf
PDF 362 KB Posted
- Attached to
- Crownpoint Medical Gas Upgrade Construction
- Solicitation number
- 75H70126R00028
About this file
This is Amendment A0001 to Request for Proposals (RFP) 75H70126R00028 issued by the Indian Health Service (IHS) - DES Seattle for a Crownpoint Medical Gas Upgrade project. The amendment, effective June 29, 2026, extends the RFP due date and time from July 2, 2026, 1:00 PM Pacific Time to July 16, 2026, 1:00 PM Pacific Time. The amendment provides additional documentation including a site visit sign-in sheet, a complete Questions and Answers (Q&As) sheet with 48 technical and administrative questions and responses, and six attachments: Crownpoint Med Gas Renovation Addendum #1, 9024T IHS Crownpoint Med Gas Project Specifications, and four As-Built drawings (P-1, P-3, P-5, and P-7). The contracting officer is Jong Kim. Offerors must acknowledge receipt of this amendment prior to the extended deadline through one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each copy of the offer submitted, or submitting a separate letter or electronic communication referencing the solicitation and amendment numbers.
The Q&As address substantive project requirements including site logistics (staging area north of building, M-F 8-5pm work hours), coordination procedures with facility management, ICRA permit requirements (approximately 13 separate permits required), asbestos confirmation (none onsite), fencing and concrete expansion requirements around bulk liquid oxygen tank, equipment specifications (MAC-1 and MVP-1 manufacturers suggested with RFI process for alternates), 6% Navajo Nation tax applicability, and third-party inspection and testing requirements. Administrative questions clarify that Native Owned business documentation options include charter of incorporation or articles of organization, that the QC manager can assume safety supervisor duties but not superintendent duties, and that the Government will not accept further questions or inquiries concerning the RFP following this amendment.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A0001
JONG KIM, Contracting Officer
See next page.
Indian Health Service - DES Seattle 701 5th Avenue, Suite 1600 Seattle, WA 98104
75H70126R00028
1 5
06/29/2026
06/02/2026
SF30 Continuation Page
A. The purpose of this amendment is for the followings;
1. Provide a Site Visit Sign-In Sheet.
2. Provide a complete Q&As sheet.
3. Provide the following Attachments.
• B01 Attachment J02-a Crownpoint Med Gas Renovation ADDENDUM #1
• B01 Attachment J02-b 9024T IHS Crownpoint Med Gas_Project Specifications
• B01 Attachment J02-c As-Built P-1
• B01 Attachment J02-d As-Built P-3
• B01 Attachment J02-e As-Built P-5
• B01 Attachment J02-f As-Built P-7
4. Extend RFP Due Date and Time from July 2, 2026, 1:00 PM Pacific Time to July 16, 2026, 1:00 PM Pacific
Time.
B. See attached B01 RFP 75H70126R00028 Crownpoint Medical Gas Upgrade Amended by A0001 for fully updated
RFP.
C. The Government will not accept any further questions or inquiries concerning this RFP.
D. All other terms and conditions of this solicitation remain unchanged.
Amend No.
Item
Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC
A0001 1 6/18/2026 Technical
Will power be provided for construction during standard daytime hours?
06/26/2026
Reggie - Yes, while power will be provided for construction activities, the hospital retains the right to prioritize electrical supply for patient care and critical operations at any time. IHS PM
A0001 2 6/18/2026 Technical
When sections of building are shut down for electrical work, what are the coordination requirements needed? What is the leadtime to request shutdown and what is the time that sections can be shut down for? 06/26/2026 yes, coordination wilth Facility Manager ( Reggie White) will have to take place. He will be familiar with the facility
IHS PM
A0001 3 6/18/2026 Technical
Can we get confirmation that areas being worked on will be clear of patients?
06/26/2026 yes, confirmation will be given. A schedule from the contractor will be submitted prior to start work. This will coordinate with the facility on scheduling. IHS PM
A0001 4 6/18/2026 Technical
Will only the prime contractor's superintendent be required to complete the IHS background investigation, or will other personnel be required to do so?
How long will the process take to complete? 06/26/2026
A listing of the contractors personnal will be given
IHS PM
A0001 5 6/18/2026 Technical
Will asbestos or other hazardous materials be encountered during work? If so, we will need clear information on locations and quantity in order to price this scope.
06/26/2026 no asbestos onsite
IHS PM
A0001 6 6/18/2026 Technical
Will additional chainlink fence need to be added to east side of the emergency low pressure gaseous oxygen inlet box (next to the building entry door and across from the new west access gate)? Will additional chainlink fence need to be added to connect the isolated bulk liquid oxygen tank to the main building to the east and the south in order to close the whole area off to the public?
06/26/2026
Reggie - Yes, additional chain-link fencing is required because of a lateral access route to the employee entrance passes directly between the bulk liquid O2 tank and the main building.
IHS PM
A0001 7 6/18/2026 Technical
Will any concrete sidewalk around the bulk liquid oxygen tank need to be replaced or expanded in addition to the new concrete walkway at the building entrance where the inlet box is located? 06/26/2026
Reggie - Yes, the existing concrete sidewalk must be replaced and widened. This expansion is required to accommodate the delivery of emergency cryogenic oxygen dewars. IHS PM
A0001 8 6/18/2026 Technical
At the mechanical room (MG-5), will the raised concrete pad need to be replaced or adjusted along with the medical air compressor and vacuum pump? 06/26/2026 existing housekeeping pad shall be used
IHS PM
A0001 9 6/18/2026 Technical
Please confirm allowable days and hours to work at the site. What is the lead time to request extended hours or weekend work if needed?
06/26/2026 allowable days of work are M-F 8-5pm. As noted in MG-1 Note F in
MEDICAL GAS GENERAL NOTES
IHS PM
A0001 10 6/18/2026 Technical
It was mentioned during the walk that the parking lot area to the north of the building (by the bulk oxygen tank) can be closed off and used as the staging area for the contractor for the duration of the project. Please confirm if this is correct. If not, what other locations would be suitable? 06/26/2026
Correct north of building or north of bulk oxygen tank will be staging area for contractor.
IHS PM
A0001 11 6/18/2026 Technical
Could you provide the official site visitation attendance log?
06/26/2026
Yes.
IHS PM
A0001 12 6/18/2026 Technical
Is there a specific sequence of work that the IHS would like followed?
06/26/2026
As is pertains to the different locations. Contractor will submit a schedule and IHS will agree.
IHS PM
A0001 13 6/18/2026 Technical
Will updated plans be provided? There is a reference to documents dated Aug. 10, 2024 on Page 2 of the Update Report. Are the provided 2018 drawings the latest and greatest? 06/26/2026 yes, it will be submitted.
IHS PM
A0001 14 6/18/2026 Technical
How many project areas will there be, and will each area require a separate ICRA permit?
06/26/2026
Reggie - Yes, due to varying levels of clinical risks within the patient care areas, approximately 13 separate ICRA permits will be required across the designated project zones. IHS PM
A0001 15 6/18/2026 Technical
Please confirm if the IHS will be the AHJ? Are there any local or State permits that the contractor will need to pull?
06/26/2026
IHS will be AHJ
IHS PM
A0001 16 6/18/2026 Technical
Are there any TERO taxes required?
06/26/2026
There is no TERO tax. There is a 6% Navajo Nation tax
IHS PM
A0001 17 6/18/2026 Technical
Is there a basis of design for exterior lighting? More information would help so our proposal meets the intent of this scope.
06/26/2026 there is no basis of design for exterior lighting. A RFI will be requested to Designers.
IHS PM
A0001 18 6/18/2026 Technical Can a qualified superintendent also serve the roles of site safety supervisor and QC manager (triple hat)? 06/26/2026
Yes.
IHS PM
A0001 19 6/18/2026 Technical
Will the IHS accept a substituted alternate manufacturer to Ohio Medical?
06/26/2026
Currently, MAC-1 and MVP-1 is suggested. An RFI to Designer will be submitted if alternate manufacturer can be installed.
IHS PM
A0001 20 6/19/2026 Admin
If the Native Owned business is not individually owned but rather entity owned by a federally recognized Indian Tribe, what can we use in lieu of "Controlling enterprises tribal enrollment cert of degree of Indian Blood documentation" as requested in Volume II, Submittal Part 1? Will our Charter of Incorporation or Articles of Organization suffice?
06/19/2026
Yes
IHS CO
A0001 21 6/19/2026 Admin
Can you please confirm a project manager, superintendent and safety are the only key personnel required for the project?
06/19/2026
The solicitation does not include a Key Personnel evaluation factor.
Offerors shall submit all information required by the solicitation. The Government will evaluate proposals based on the evaluation factors identified in the solicitation. Offerors are responsible for proposing a staffing approach sufficient to successfully perform all contract requirements.
IHS CO
A0001 22 6/19/2026 Technical
Do you have the specifications for paint for patch repair?
06/26/2026
There is no specific specification for patch repair. A RFI will be requested to Designers.
IHS PM
A0001 23 6/19/2026 Technical
Could you provide the liquid oxygen supplier info to verify tank refurbishing?
06/26/2026
Current vendor that is familiar with bulk oxygen tank is Cook's Cryogenic Services. Kenny Cook Phone:480-988-5122 or 5123
IHS PM
A0001 24 6/19/2026 Technical
Can we provide an equal brand for medical equipment?
06/26/2026
An RFI will be submitted to desiger.
IHS PM
A0001 25 6/19/2026 Technical
What are going to be your ICRA wall requirements?
06/26/2026
Reggie - ICRA wall requirements vary by clinical risk level, ranging from basic 6-mil plastic barriers to durable modular containment walls.
All barrier types must comply with fire codes governed by NFPA 101, NFPA 241, NFPA 701.
IHS PM
A0001 26 6/19/2026 Technical
Do you have a phasing plan you would like the GC to follow?
06/26/2026
GC will submit a schedule and IHS will review an approve
IHS PM
A0001 27 6/19/2026 Technical
Are we replacing the fence and gate around outside oxygen tank or just reusing the exsisting one?
06/26/2026
Yes, see item #6.
IHS PM
A0001 28 6/19/2026 Technical
Please confirm that there is an 8% TERO tax.
06/26/2026
There is no TERO tax. There is a 6% Navajo Nation tax
IHS PM
A0001 29 6/19/2026 Technical
Is there any work hour restrictions?
06/26/2026 allowable days of work are M-F 8-5pm. As noted in MG-1 Note F in
MEDICAL GAS GENERAL NOTES
IHS PM
A0001 30 6/19/2026 Technical
Is IHS going to provide the medgas third party inspector?
06/26/2026
No
IHS PM
A0001 31 6/19/2026 Technical
Does IHS want commissioning?
06/27/2026
No
IHS PM
A0001 32 6/19/2026 Technical
Are we replacing the exsisting low voltage wiring or reusing the exsisting low voltage wire?
06/26/2026 refer to Wilson & Company report. #7. Sheet E-1, c iii, d iii
IHS PM
A0001 33 6/22/2026 Technical
May the QCM assume the responsibilities of the SSHO on this project?
(Reference: Section H.6 Key Personnel, Page 15, Paragraph (b))
06/26/2026
Yes, QCM can assume responsibilities of SSHO
IHS PM
A0001 34 6/22/2026 Technical
May the QCM assume the responsibilities of the Superintendent on this project?
(Reference: Section H.6 Key Personnel, Page 15, Paragraph (b); Section H.8 Superintendent on Site, Page 16)
06/26/2026
QCM can't assume responsibilities of the Superintendent.
IHS PM
A0001 35 6/22/2026 Technical
May the SSHO assume the responsibilities of the Superintendent on this project?
(Reference: Section H.6 Key Personnel, Page 15, Paragraph (b); Section H.8 Superintendent on Site, Page 16)
06/26/2026
SSHO can't assume responsibilities of the Superintendent.
IHS PM
A0001 36 6/22/2026 Technical
Are there any known activities, shutdowns, tie-ins, testing, or inspections anticipated to occur outside normal working hours?
(Reference: Section C.5 Work Hours, Page 4, Paragraph 5.1; Section H.1 Work Hours, Page 13)
06/26/2026
If outside hours are anticipated. Facility will work with contractor
IHS PM
A0001 37 6/22/2026 Technical
In the event the Medical Code Update Report, construction drawings, specifications, and referenced codes conflict, please clarify the order of precedence for design and construction requirements.
(Reference: Section C.1 Project Background, Page 4; Attachment J02 Medical Code Update Report)
06/26/2026 revisions are reported on drawings and are highlighted in red.
Reference are in letter from Wilson & Company. Under subject Medical Gas Upgrade Construction Drawings: no other update or reissue to the Crownpoint Health Care Facility Medical Gas upgrade Construction Documents dated August 10th, 2018. This report will be attached.
IHS PM
A0001 38 6/22/2026 Technical
If existing conditions require additional work not specifically identified in the Medical Code Update Report but necessary to achieve a code-compliant medical gas system, should such work be included in the base bid or addressed through contract modification?
(Reference: Section B.2 Incidental Payment Items, Page 3; Attachment J02 Medical Code Update Report)
06/26/2026
It will be address in a modification. An RFI will be submitted to designer for clarification.
IHS PM
A0001 39 6/22/2026 Technical
Please provide any available as-built drawings for the existing medical gas systems.
(Reference: Section E.2 Inspection of Site, Page 7, Paragraph (c)) 06/26/2026
As-built can be submitted.
IHS PM
A0001 40 6/22/2026 Technical
Is the Medical Code Update Report intended to represent the complete scope of work, or are there additional deficiencies expected to be addressed under this contract?
(Reference: Section C.1 Project Background, Page 4; Attachment J02 Medical Code Update Report)
06/26/2026
Medical code update report represents the complete scope of work.
IHS PM
A0001 41 6/22/2026 Technical
Will temporary medical gas systems be required during construction activities or planned shutdowns?
(Reference: Section C.8 Coordination with Occupants, Page 5; Section C.9 Work Restrictions, Page 5)
06/26/2026 no
IHS PM
A0001 42 6/22/2026 Technical
Will third-party testing, certification, and verification of the medical gas systems be required under this contract? If so, please identify the required certifying agency.
(Reference: Section E.3 Inspection and Acceptance, Page 7)
06/26/2026
Yes, it will be under this contract. This report is part of the Rock Gap Engineering LLC, 2018, Medical gas Upgrade Project specifications.
Report will be attached IHS PM
A0001 43 6/22/2026 Technical
Are there any known hazardous materials that may be encountered during demolition activities?
(Reference: Section C.3 Work Covered by Contract Documents, Page 4) 06/26/2026 no known hazardous material will be encountered.
IHS PM
A0001 44 6/22/2026 Technical
Will the Government provide designated staging, laydown, and material storage areas for contractor use?
(Reference: Section D.1 Packaging and Marking, Page 6, Paragraph (c)) 06/26/2026
Correct north of building or north of bulk oxygen tank will be staging area for contractor.
IHS PM
A0001 45 6/22/2026 Technical
Please identify any anticipated utility or medical gas shutdown restrictions and required notification periods.
(Reference: Section C.9 Work Restrictions, Page 5, Paragraph 9.1) 06/26/2026
Oxygen is offline, Medical Gas is decomission for service and medical Vacuum is rarely used. At ER and OR, they are using portable units.
IHS PM
A0001 46 6/22/2026 Technical
Please clarify whether all medical gas alarms, master alarms, area alarms, and monitoring devices are included in the project scope.
(Reference: Attachment J02 Medical Code Update Report / Construction Drawings)
06/26/2026
All medical gas equipment schedule and medical air compressor and medical vacuum pump are noted on print. If noted in red, then updated scheduled in report by Wilson & Company. IHS PM
A0001 47 6/22/2026 Technical
Please confirm whether existing medical gas source equipment (vacuum pumps, air compressors, manifolds, and bulk oxygen systems) is included in the upgrade scope, or if work is limited to piping and distribution systems.
(Reference: Attachment J02 Medical Code Update Report / Construction Drawings)
06/26/2026 vacuum pump, air compressors will be replaced, manifold tie in exiting piping is also in scope. Bulk Oxygen will be refurbished.
IHS PM
A0001 48 6/22/2026 Technical
Please identify any anticipated phasing requirements for patient care areas that may impact sequencing and temporary services.
(Reference: Section H.7 Project Management, Page 15; Section C.8 Coordination with Occupants, Page 5)
06/26/2026
A schedule of construction will be submitted to IHS for approval. IHS will try to adhere to the scheduling. It's unpredictiable is patient room will be occupied during those scheduling. IHS PM
The Government will not accept any further questions or inquiries concerning this RFP.
| ADP40A4.tmp |
| SF30 Continuation Page |
| A. The purpose of this amendment is for the followings; |
| 1. Provide a Site Visit Sign-In Sheet. |
| 2. Provide a complete Q&As sheet. |
| 3. Provide the following Attachments. |
| B01 Attachment J02-a Crownpoint Med Gas Renovation ADDENDUM #1 |
| B01 Attachment J02-b 9024T IHS Crownpoint Med Gas_Project Specifications |
| B01 Attachment J02-c As-Built P-1 |
| B01 Attachment J02-d As-Built P-3 |
| B01 Attachment J02-e As-Built P-5 |
| B01 Attachment J02-f As-Built P-7 |
| 4. Extend RFP Due Date and Time from July 2, 2026, 1:00 PM Pacific Time to July 16, 2026, 1:00 PM Pacific Time. |
| B. See attached B01 RFP 75H70126R00028 Crownpoint Medical Gas Upgrade Amended by A0001 for fully updated RFP. |
| C. All other terms and conditions of this solicitation remain unchanged. |
| ADP6C7B.tmp |
| SF30 Continuation Page |
| A. The purpose of this amendment is for the followings; |
| 1. Provide a Site Visit Sign-In Sheet. |
| 2. Provide a complete Q&As sheet. |
| 3. Provide the following Attachments. |
| B01 Attachment J02-a Crownpoint Med Gas Renovation ADDENDUM #1 |
| B01 Attachment J02-b 9024T IHS Crownpoint Med Gas_Project Specifications |
| B01 Attachment J02-c As-Built P-1 |
| B01 Attachment J02-d As-Built P-3 |
| B01 Attachment J02-e As-Built P-5 |
| B01 Attachment J02-f As-Built P-7 |
| 4. Extend RFP Due Date and Time from July 2, 2026, 1:00 PM Pacific Time to July 16, 2026, 1:00 PM Pacific Time. |
| B. See attached B01 RFP 75H70126R00028 Crownpoint Medical Gas Upgrade Amended by A0001 for fully updated RFP. |
| C. The Government will not accept any further questions or inquiries concerning this RFP. |
| D. All other terms and conditions of this solicitation remain unchanged. |