A00006-75H70126R00010 J07 Price Schedule Cost Breakout.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Gallup Indian Medical Center (GIMC) Fire Alarm Upgrade – Construction (Gallup, NM)
Solicitation number
75H70126R00010
Issued by

About this file

This is a Price Schedule Cost Breakout template for the Gallup Indian Medical Center (GIMC) Fire Alarm Upgrade Construction project (Solicitation 75H70126R00010). The spreadsheet is structured to capture detailed pricing across nine Contract Line Items (CLINs) covering fire alarm system work at nine separate buildings: Building 2000 Main Hospital (CLIN 0001), Building 2018 (CLIN 0002), Building 3001 (CLIN 0003), Building 3002 (CLIN 0004), Building 3003 (CLIN 0005), Building 4010 (CLIN 0006), Building 5002 (CLIN 0007), Building 5000 (CLIN 0008), and Building F (CLIN 0009). Each CLIN contains two primary line items: demolition of existing fire alarm systems and installation of new fire alarm systems, with unit pricing and total cost columns.

Tab 2 of the template provides an alternative breakdown structure for each building, itemizing costs for demolition of existing fire alarm systems, new fire alarm material costs, and labor for fire alarm installation. The overall pricing structure includes provisions for calculating overhead, profit, bonds/insurance, and Gallup, New Mexico taxes as additions to the construction costs. The template currently displays zero values across all cost fields, indicating it is a blank template awaiting contractor pricing input. This Firm Fixed Price (FFP) solicitation is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under NAICS code 236220, with an anticipated project magnitude between $1,000,000 and $7,000,000 and a 180-calendar-day period of performance.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1

CLIN 0001Description Building 2000 Main HospitalQuantityUnitUnit Cost ($)Total Cost ($)NotesSF %% of OH, Profit and Taxes% of ConstructionCost of CLIN
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
OPTIONS
CLIN 0002Description Buidling 2018QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0003Description Building 3001QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0004Description Building 3002QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installEA$ - 0
CLIN 0005Description Building 3003QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0006Description Building 4010QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0007Description Building 5002QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0008Description Building 5000QuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
CLIN 0009Description Building FQuantityUnitUnit Cost ($)Total Cost ($)Notes
1Demolition of existing fire alarm systemSF$ - 0
2New fire alarm installSF$ - 0
- 0$ - 0
Subtotal$ - 0
Subtotal$ - 0ERROR:#REF!
Overhead$ - 0
Subtotal$ - 0
Profit$ - 0
Subtotal$ - 0
Bonds/Insurance$ - 0
Subtotal$ - 0
Gallup NM Tax$ - 0
TOTAL$ - 0

Tab 2

Item No.2000 Main HospitalTotal Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Buidling 2018Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 3001Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 3002Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 3003Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 4010Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 5002Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building 5000Total Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
Item No.Building FTotal Cost ($)
1Demolition of existing fire alarm system
2New fire alarm Material only.
3Labor for Fire Alarm install
$ - 0

$ - 0

Overhead

Profit

Bonds/Insurance

Gallup NM Tax
$ - 0

File details come from the government source that posted it. Updated .