This document is Standard Form 30 (Amendment of Solicitation/Modification of Contract) for Indian Health Services' Bill Parkin (MAK) Water and Sewer project. The amendment, A00001, was issued on October 9, 2026, by the Division of Engineering Services in Dallas and is effective immediately. The solicitation number is 75H701-26-Q-00035, with project number PO-23-D19. The purpose of this amendment is to provide government responses to contractor questions received via email regarding the solicitation. The proposal deadline remains unchanged at October 16, 2026, at 2:00 PM CDT. All other terms and conditions of the original solicitation remain in full force and effect.

The amendment includes six contractor questions and government responses addressing critical project specifications. Question 1 clarifies that Clallam County septic installer certification can be satisfied through a subcontractor; the prime contractor does not need the certification if the subcontractor holds it, with a copy of the subcontractor's certification to be provided with the submittal. Question 2 resolves a specification conflict by directing contractors to follow the drawings requiring gravelless chamber systems rather than gravel bed infiltration for CLIN 0007. Question 3 confirms that drawings sheets C-2 and C-3 (identified as project PO-17-C13) are current and applicable, and directs contractors to follow the drawings for dispersal area specifications. Question 4 clarifies that the contractor is responsible for obtaining and paying for site approvals, Clallam County on-site sewage permits, and Department of Ecology Notice of Intent, with these costs incorporated into bid items. Question 5 confirms that Makah Tribal Employment Rights Ordinance (TERO) fees do not apply to this contract. Question 6 confirms that quotes are due at 2:00 PM CDT on October 16, 2026. Offerors must acknowledge receipt of this amendment by referencing it by number and date on their cover letter or by submitting a signed SF 30 form.

View the file

Other files

File Type Posted
3-Drawings.pdf PDF
5-Aerial II.pdf PDF
7-US DOL WD WA20260081 Dated 5-18-2026.pdf PDF
B01 75H70126Q00035.pdf PDF
6-Measurement and Payment.docx DOCX document
1-SOW.docx DOCX document
2-Technical Provisions.pdf PDF
A11 Pre-Solicitation SAM Notice.pdf PDF
4-Aerial.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED 16C. DATE SIGNED

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

2. AMENDMENT/MODIFICATION NO.

A00001

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project No. PO-23-D19, Bill Parkin (MAK) - Water and Sewer, Amendment A00001.

1. The purpose of this amendment is to provide the following: Government responses to the contractor's questions received-in, via email to the solicitation, pages 2-4.

2. The solicitation's proposal date remains unchanged at October 16, 2026 @ 2:00pm CDT.

3. All other terms and conditions remain unchanged and in full effect.

Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433

Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433

10A. MODIFICATION OF CONTRACT/ORDER NO.

5. PROJECT NO. (If applicable)

PO-23-D19

PAGE OF PAGES

10B. DATED (SEE ITEM 13)

3. EFFECTIVE DATE

10-9-2026

75H701-26-Q-00035

9/17/2026 is not extended.

One (1)

X

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

X X

ROBERT S. MILLER

romiller Cross-Out

Bill Parkin (MAK) Water and Sewer Solicitation No.: 75H70126Q00035 A00001

Contractor Questions and Government Responses (bolded below), Dated 25 August 2026, M Hendrickx

Connection to City of Spokane Water:

Question 1 - Clallam County septic installer certification

Citation: Section L, paragraph L.4, item 3 (page 26); Section M, paragraph M.1, item 3 (page 27); Section H, paragraphs H.1(d) and H.2(e).

Both L.4 and M.1 state: "Contractors need to be Clallam County certified septic installers." Section M.1 further states: "The quoter shall possess all necessary certifications to perform the work specified in Section C to be eligible for award.

Please confirm whether this requirement is satisfied where the offeror performs the on-site sewage system installation through a subcontractor holding a current Clallam County septic system installer certificate. We note three provisions bearing on the question:

Section H.1(d) provides that "[t]he contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications," defining a specialty subcontractor as "a subcontractor regularly engaged in the manufacture or installation of the contract items."

Section H.2(e) provides that the list of subcontractors on Form SF-1413 is due "[w]ithin ten days after contract award," so subcontractor identity is a post-award submittal rather than a quote-evaluation item.

Clallam County Code 41.20.110(4) provides that "[a]ll persons employed to construct, install, or alter a sewage disposal system shall be employees of a licensed installer" - placing the credential on the firm whose personnel physically perform the installation.

If the certificate must instead be held by the offeror itself, please confirm that so offerors can respond accordingly. If a subcontractor's certificate is acceptable, please confirm what evidence should accompany the quotation - a copy of the certificate, the named Principal Installer, or a letter of intent - given that SF-1413 is not due until after award.

Answer 1: As long as the person installing is certified with the County, even if they are a sub. The prime does not need the installer certification. If only the sub has the certification, a copy of their certification should be provided as a submittal.

Question 2 - Drainfield construction: gravel bed or gravelless chambers (CLIN 0007)

Citation: Technical Provision 15.04.01.2; Attachment 3 (Drawings), sheet C-3; Attachment 6 (Measurement and Payment).

Technical Provision 15.04.01.2, "Gravel Bed," states: "A 10 ft. x 40 ft. gravel bed with a minimum overall depth of 9-inches shall be provided. A minimum of 6-inches of gravel shall be placed below the distribution laterals and a minimum of 2-inches of gravel shall be placed over the laterals."

The drawings instead specify: "INSTALL CHAMBER STYLE INFILTRATION BED 3 ROWS MIN 18"

BELOW TOP OF MOUND" with "24" OF SAND BELOW CHAMBERS." The Measurement and Payment attachment titles the corresponding pay item "LOW PRESSURE DOSED GRAVELLESS MOUND

DRAINFIELD SYSTEM" and provides for payment of "imported ASTM C-33 Sand fill, chambers, filter fabric."

Please confirm which construction governs CLIN 0007 - a gravel infiltration bed, or a gravelless chamber system. The two carry materially different material quantities and installed cost.

Answer 2: Follow the drawings (gravelless chambers).

Question 3 - Mound dispersal area, and drawing sheet identification

Citation: Attachment 1 (Statement of Work), Project Description; Attachment 3 (Drawings), sheets C-1, C-2 and C-3.

(a) The Statement of Work describes "a standard mound system with 1496 square feet of dispersal area." The drawings call for a 23' x 58' mound, or 1,334 square feet. Please confirm the dispersal/basal area and the corresponding sand fill quantity on which the Government's estimate is based.

(b) Sheet C-1 is identified as "IHS PROJECT NO. PO-23D19," matching Section C. Sheets C-2 and C-3 -which carry the septic tank, pump tank and mound details - are identified as "IHS PROJECT NO. PO-17-C13" and "PO-17-C13F." Please confirm that sheets C-2 and C-3 are the current details applicable to this project.

Answer 3: 3. A. Follow the drawings

B. C-2 and C-3 are current details and applicable to this project.

Question 4 - Permits and approvals

Citation: Technical Provisions 11.02 and 15.02; Pre-Solicitation Notice.

Technical Provisions 11.02 and 15.02 both state: "The Government shall secure the applicable site approvals and sewage disposal permits for the work specified herein."

The pre-solicitation notice states: "Any permits, including the Department of Ecology Notice of Intent, are the responsibility of the Contractor."

Please confirm which party is responsible for obtaining and paying for site approvals, the Clallam County on-site sewage permit, and the Department of Ecology Notice of Intent.

Answer 4: The contractor is responsible for obtaining and paying for the site approvals, the Clallam

County on-site sewage permit, and DOE NOI. However, these costs should be incorporated into the contractor’s bid items for payment.

Question 5 - TERO fees

Citation: Attachment 1 (Statement of Work), "TERO & Other Fees"; Pre-Solicitation Notice.

The Statement of Work states: "TERO fees apply." The pre-solicitation notice states: "TERO: TERO fees do

NOT apply."

Please confirm whether Makah Tribal Employment Rights Ordinance fees apply to this contract. If they do, please provide the applicable fee rate and the registration procedure, as no TERO line item appears on the

Section B price schedule and Section B.2 provides that all other work and materials are incidental to the items shown.

Answer 5: Confirmed that TERO fees do not apply.

Question 6 - Quote due date and time

Citation: SF-1442 Block 13a; Section L.5; SAM.gov notice 0e3bc7dc6b384de08bbbdb01b5b1f9aa.

SF-1442 Block 13a and Section L.5 both state that quotes are due at 2:00pm CDT on October 16, 2026. The

SAM.gov posting records the response deadline as 2:00pm Eastern on the same date. Please confirm the governing time.

Answer 6: Quotes due at 2:00pm CDT.

*As stated within the solicitation, inquiries (questions) must be received no later than 2:00pm CST on 9

October 2026 to allow time for response(s). After which, no further questions are guaranteed to be answered*

NOTICE TO OFFERORS: Offerors must acknowledge receipt of all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

Standard Detailed Drawings WPS Enclosure.pdf
WELL-Model.pdf
Sheets and Views
Model
ADP2A03.tmp
M96 Bid Abstract
ADP675E.tmp
Bid Schedule
B05 PLANSET - Miller Heights Sewer Main Replacement (Revised 3-1-2021) (signed).pdf
Sheets and Views
Miller Heights sewer main030121-COVER & LOCATION
Miller Heights sewer main030121-11x17 Notes and Legend
Miller Heights sewer main030121-11X17 Abbreviations
Miller Heights sewer main030121-PROPOSED
Miller Heights sewer main030121-DETAILS
Miller Heights sewer main030121-DETAILS (2)
B05 TECHNICAL SPECIFICATIONS - Miller Heights Sewer Replacement (revised 3-1-2021) (signed).pdf
00 01 01 Project Title Page
CONFEDERATED TRIBES OF WARM SPRINGS
INDIAN RESERVATION
JEFFERSON COUNTY, OREGON
CONTRACT DOCUMENTS
INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL HEALTH
AND ENGINEERING
PORTLAND AREA OFFICE
WESTERN OREGON FIELD OFFICE
FEBRUARY 2020
00 01 10 Table of Contents - 20-M96
VOLUME I
Division 00 – Procurement and Contracting Requirements
Division 01 – General Requirements
Division 31 – Earthwork
Division 33 – Utilities
01 11 00 Summary of Work - 20-M96
PART 1 - GENERAL
1.01 SUMMARY
A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon
C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per...
1.02 WORK REQUIRED
A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a...
B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo...
3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes.
C. Sewer Main Replacement is shown on the drawings.
1.03 SITE CONDITIONS
A. Utilities
1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor...
a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
2. Protect existing utilities during construction.
3. Immediately notify project engineer and the utility owner of any damaged utilities.
4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.)
B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s...
2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency
3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms.
D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe.
E. Site Ownership 1. The construction site is entirely located inside the Warm Springs Indian Reservation and on the land controlled by the Warm Springs Tribe.
1.04 SEQUENCE OF WORK
A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh...
01 27 00 Price & Payment - 20-M96
PRICE AND PAYMENT
PART 1 - GENERAL
PART 2 – BID SCHEDULE ITEMS
A. SCHEDULE
1. Mobilization:
2. ODOT Permitting and Traffic Control:
3. Removal and Disposal of Contaminated Soils:
4. Temporary Erosion and Sediment Control:
5. Temporary Sewage Bypass Pumping:
6. Connections to Existing Manholes:
7. PVC Sanitary Sewer Pipe, 8 In. Diam.:
8. Fencing Repairs and Site Restoration:
01 31 00 Project Management and Coordination - 20-M96
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
END OF SECTION
01 33 00 Submittal Procedures - 20-M96
SUBMITTAL PROCEDURES
PART 1 - GENERAL
END OF SECTION
01 42 00 References - 20-M96
REFERENCES
PART 1 - GENERAL
B. Federal Agencies
C. State Agencies
END OF SECTION
American Association of State Highway and
American Water Works Association (AWWA)
01 43 00 Quality Assurance-Quality Control - 20-M96
QUALITY ASSURANCE/QUALITY CONTROL
PART 1 - GENERAL
END OF SECTION
01 50 00 Temporary Facilities and Controls - 20-M96
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
END OF SECTION
01 77 00 Closeout Procedures - 20-M96
CLOSEOUT PROCEDURES
PART 1 - GENERAL
END OF SECTION
01 78 00 Closeout Submittals - 20-M96
CLOSEOUT SUBMITTALS
PART 1 - GENERAL
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
END OF SECTION
31 23 10 Excavation,Trenching, & Backfill - 20-M96
SECTION 31 23 10
EXCAVATION, TRENCHING AND BACKFILL
PART 1 - GENERAL
A. This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to concrete sewer manholes, piping, and other structures.
1.05 QUALITY ASSURANCE
PART 2 – PRODUCTS
PART 3 - EXECUTION
END OF SECTION
31 25 00 Erosion and Sediment Control - 20-M96
PART 1 - GENERAL
PART 2 - PRODUCTS
Sieve Size Percent Passing
PART 3 – EXECUTION
END OF SECTION
33 01 31 Temporary Sewer Bypass - 20-M96
TEMPORARY SEWER BYPASS
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION
33 30 00 Sanitary Sewerage - 20-M96
SANITARY SEWERAGE
PART 1 - GENERAL
PART 2 - PRODUCTS
A. Manholes:
1. Concrete compressive strength will meet or exceed 4000 pounds per square inch at 28 days.
B. Sewer Pipe Connection:
1. Connect pipes using a rigid watertight pipe adapter gasket conforming to ASTM C1173 and ASTM D5926.
2. Gasket
a. Manufactured to meet the material requirements of:
1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems
2) ASTM D5926 – Poly (Vinyl Chloride) (PVC) Gaskets for Drain, Waste, and Vent (DWV), Sewer, Sanitary, and Storm Plumbing Systems
3) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
3. Clamps
a. Manufactured to meet the material requirements of:
1) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
4. Shear Ring
a. Length manufactured according to coupling diameter.
b. Clamps spot welded in place.
5. Couplings
a. Manufactured to conform to the performance requirements of:
1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems
2) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
b. Maximum Test Pressure: 4.3 PSI
c. Maximum Operating Temperature: 140 F non-consistent
PART 3 - EXECUTION
END OF SECTION
00 01 01 Project Title Page.pdf
CONFEDERATED TRIBES OF WARM SPRINGS
INDIAN RESERVATION
JEFFERSON COUNTY, OREGON
CONTRACT DOCUMENTS
INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL HEALTH
AND ENGINEERING
PORTLAND AREA OFFICE
WESTERN OREGON FIELD OFFICE
FEBRUARY 2020
01 11 00 Summary of Work - 20-M96.pdf
PART 1 - GENERAL
1.01 SUMMARY
A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon
C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per...
1.02 WORK REQUIRED
A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a...
B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo...
3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes.
C. Sewer Main Replacement is shown on the drawings.
1.03 SITE CONDITIONS
A. Utilities
1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor...
a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
2. Protect existing utilities during construction.
3. Immediately notify project engineer and the utility owner of any damaged utilities.
4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.)
B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s...
2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency
3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms.
D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe. Use of Oregon DOT right-of-way to access site shall be coordinated with ODOT.
E. Site Ownership 1. The construction site is located inside the Warm Springs Indian Reservation along a utilities easement owned by the Warm Springs Tribe. The site access along OR HWY 26 requires permitting and coordination with ODOT.
1.04 SEQUENCE OF WORK
A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh...
01 27 00 Price & Payment - 20-M96.pdf
PRICE AND PAYMENT
PART 1 - GENERAL
PART 2 – BID SCHEDULE ITEMS
A. SCHEDULE
1. Mobilization:
2. ODOT Permitting and Traffic Control:
3. Removal and Disposal of Contaminated Soils:
4. Temporary Erosion and Sediment Control:
5. Temporary Sewage Bypass Pumping:
6. Connections to Existing Manholes:
7. PVC Sanitary Sewer Pipe, 8 In. Diam.:
8. Fencing Repairs and Site Restoration: