B05 75H70125R00066 Amendment 03.pdf
PDF 192 KB Posted
- Attached to
- Lame Deer Heliport Reconstruction
- Solicitation number
- 75H70125R00066
About this file
This document is an Amendment of Solicitation (Standard Form 30) for Solicitation 75H70125R00066, issued by the Division of Engineering Services in Seattle, with an effective date of 09/25/2025. The amendment includes a Questions and Answers section addressing three specific technical inquiries related to a construction or renovation project:
The Q&A section clarifies details about existing infrastructure, including: (1) a navigation light pole that will remain and be protected, (2) confirmation that no lights are to be installed on the loading dock or ambulance roof overhang, and (3) details about heliport lighting controls. Specifically, the existing heliport lights are currently controlled by a wall-mounted switch in the Ambulance Bay, and there is currently no radio receiver/decoder installed on site. The amendment's primary purpose is to provide vendors with additional information and answer technical questions about the project scope.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00003
The reason for this amendment on this solicitation is to answer questions from vendors.
Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104
See block 6
75H70125R00066
BI25NC201C06
1 2
09/25/2025
08/08/2025
Solicitation: 75H70125R00066 Amendment 00003
QUESTIONS AND ANSWERS
Q1. On the current pole light there are cameras. Will theses be relocated or completely removed?
A1. The only light pole that is within the project limits would be the navigation light which is to remain and be protected.
Q2. On the loading dock and ambulance roof expansion are lights to be installed under them?
A2. There are no lights as indicated in the question. The overhang is not part of the scope and should remain.
Q3. On page C402 the radio receiver/decoder for the helistop led insert lights need a receiver. Is there currently a receiver on site or will a new receiver/decoder be needed?
A3. There is currently not a radio receiver/decoder installed at the site. The existing heliport lights are controlled via a wall mounted light switch within the Ambulance Bay. After construction, the intent is for the heliport lights to continue to be controlled via wall mounted light switch.