B05 Amendment A00006 to 75H701-25-R-00029 2025.09.08.pdf

PDF 26 MB Posted

Attached to
PIMC Pharmacy, ATS & Standpipe
Solicitation number
75H701-25-R-00029
Issued by

About this file

This document is an Amendment (A00006) to Solicitation 75H701-25-R-00029 for the Phoenix Indian Medical Center (PIMC) Pharmacy, ATS, and Standpipe project. The amendment provides responses to pre-proposal inquiries #6 to #25, modifies the Work Hours clause, adds Attachment J01g, and replaces the Wage Determination. Key changes include clarifying work hours (normal business hours are 7:30 a.m. to 5:00 p.m., with exceptions for ATS replacement), updating electrical and demolition specifications, and addressing technical questions about medical gas demolition, electrical conduit, and project-specific details.

The project involves relocating the Inpatient Pharmacy, installing a new Automatic Transfer Switch (ATS), and converting the standpipe system in Building 233 at PIMC. The work includes electrical upgrades, demolition of existing systems, and installation of new infrastructure. The amendment provides detailed guidance on project-specific requirements, such as conduit mounting, fire sprinkler installation, and coordination with existing building systems. The solicitation is set aside for Indian Small Business Economic Enterprise (ISBEE) under NAICS code 236220, with an anticipated contract value between $1,000,000 and $5,000,000, and a 270-calendar-day performance period.

View the file

Other files

File Type Posted
B01 RFP 75H701-25-R-00029 (Conformed thru A00006).pdf PDF
J01g Addendum 01.pdf PDF
J02 WD AZ20250039 Mod 8 2025.08.29.pdf PDF
J01a Specifications - PIMC Pharmacy ATS Standpipe w-Addendum 1 2025.09.04.pdf PDF
J01b Drawings - PIMC Pharmacy ATS Standpipe w-Addendum 1 2025.09.04.pdf PDF
B01 RFP 75H701-25-R-00029 (Conformed thru A00005).pdf PDF
B05 Amendment A00005 to 75H701-25-R-00029 2025.08.28.pdf PDF
B05 Amendment A00004 to 75H701-25-R-00029 2025.08.20.pdf PDF
B05 Amendment A00003 to 75H701-25-R-00029 2025.08.19.pdf PDF
B05 Amendment A00002 to 75H701-25-R-00029 2025.08.11.pdf PDF
B05 Amendment A00001 to 75H701-25-R-00029 2025.07.31.pdf PDF
J02 WD AZ20250039 Mod 6 2025.07.25.pdf PDF
J06 PPQ.pdf PDF
J01f Above Ceiling Work Permit.pdf PDF
B01 RFP 75H701-25-R-00029 PIMC Pharmacy ATS Standpipe.pdf PDF
J01d Preliminary Commissioning Plan - PIMC Inpatient Pharmacy.pdf PDF
J02 WD AZ20250039 Mod 5 2025.07.04.pdf PDF
J04a FORMS_TPT_5000HC_11228.pdf PDF
J01a Specifications - PIMC Pharmacy ATS Standpipe 2025-04-25.pdf PDF
J03 Self Performed Calculation Sheet.pdf PDF
J07 IHS IEE Representation Form.pdf PDF
J01e Infection Control Risk Assessment Permit.pdf PDF
J04 2025 Exemption Letter for a Qualifying Hospital.pdf PDF
J08 OF 306 Declaration for Federal Employment.pdf PDF
J01c Location Map.pdf PDF
J01b Drawings - PIMC Pharmacy ATS Standpipe 2025-04-25.pdf PDF
J05 Company Specialized Experience Form Construction.pdf PDF
J09 Addendum to OF-306 (Childcare Form).pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00006

N/A

KELLY J. BRITTON

Project PH23PH06H6, PIMC Pharmacy, ATS & Standpipe

Amendment A00006 - to provide responses to Pre-proposal Inquiries #6 to #25, change H.1 Work Hours clause, add Attachment J01g, Addendum #1, replace Attachment J02 Wage Determination.

SEE CONTINUATION PAGES

Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

See Block 6

75H701-25-R-00029

PH23PH06H6

1 36

09/08/2025

07/22/2025

Amendment of Solicitation Amendment A00006 under Solicitation 75H701-25-R-00029 Project PH23PH06H6, PIMC Pharmacy, ATS & Standpipe

SUMMARY OF CHANGES

The purpose of Amendment A00006 is to provide responses to Pre-proposal Inquiries #6 to #25, change H.1 Work Hours clause, add Attachment J01g, Addendum #1, replace Attachment J02 Wage Determination, as follows:

a. Section H, change H.1. Work Hours to read as follows:

“H.1. WORK HOURS

(a). General PIMC’s normal business hours are 7:30 a.m. to 5:00 p.m., Monday through Friday, excluding Federal holidays. All work shall be performed during normal business hours.

(b). Exception – ATS Replacement The replacement of the Automatic Transfer Switch (ATS) requires work outside normal business hours. Such work shall be scheduled in advance with the COR and PIMC.

(c). Alternate Work Schedules Four (4) day work weeks will be considered upon written request by the Contractor. Any such request must be clearly identified in the project or construction schedule.

(d). Requests for Work Outside Normal Hours

(1) Work performed outside normal business hours requires advance approval by the COR.

(2) Requests to perform work outside normal business hours shall be submitted in writing to the COR not less than two (2) business days prior to the proposed modified schedule.

(e). Security Requirement A Government representative must be onsite whenever the Contractor is on IHS property.

This requirement is necessary to ensure the security of patients, Government personnel, and property.”

b. Section J, add Attachment J01g, Addendum #1, dated September 4, 2025, including changes to Attachments J01 a and J01b.

c. Section J, replace Attachment J02 Wage Determination: General Decision Number AZ20250039, Mod 7 dated August 1, 2025 with the attached revised Attachment J02 Wage Determination:

General Decision Number AZ20250039, Mod 8 dated August 29, 2025.

d. Section J - List of Attachments is revised to read as follows:

SECTION J – LIST OF ATTACHMENTS

Attachment # and Document Title Date # of Pages

J01a - Specifications - PIMC Pharmacy ATS Standpipe w-Addendum 1 9/4/2025 512 J01b - Drawings - PIMC Pharmacy ATS Standpipe w-Addendum 1 9/4/2025 52 J01c - Location Map N/A 2 J01d - Preliminary Commissioning Plan - PIMC Inpatient Pharmacy 8/9/2024 22 J01e - Infection Control Risk Assessment Permit N/A 2 J01f - Above Ceiling Work Permit N/A 2 J01g - Addendum 1 9/4/2025 19 J02 - Wage Determination: General Decision Number AZ20250039, Mod 8 8/29/2025 6 J03 - Self Performed Calculation Sheet N/A 4

Project PH23PH06H6, PIMC Pharmacy, ATS & Standpipe

J04 - 2025 Exemption Letter for a Qualifying Hospital 12/30/2024 3 J04a - Arizona Form 5000HC – Transaction Privilege Tax Healthcare

Exemption Certificate 11/2020 2

J05- Company Specialized Experience Form N/A 2 J06 - Past Performance Questionnaire N/A 5 J07 - Indian Health Service Buy Indian Act Indian Economic Enterprise

Representation Form N/A 1

J08 - OF 306 Declaration for Federal Employment Aug 2023 3 J09 - Addendum to OF-306 (Childcare Form) N/A 2

e. The following conformed documents (through Amendment A00006) are added to the solicitation page on SAM.gov:

• B01 RFP 75H701-25-R-00029 (Conformed thru A00006)

• Attachment J01a - Specifications - PIMC Pharmacy ATS Standpipe w-Addendum 1

• Attachment J01b - Drawings - PIMC Pharmacy ATS Standpipe w-Addendum 1

END OF SUMMARY OF CHANGES

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00006 dated 09/08/2025

6. The location of the ATS shown on drawing E 3.20 is not the transfer switch that needs to be refed. The elevator ATS is currently located in the elevator machine room.

Derrick/

BWS

See attached Addendum 1, dated September 4, 2025.

7. The existing elevator transfer switch (ATS-ELEV) is not a bypass isolation as shown on plans. Will a new Bypass Isolation ATS need to be provided and installed in this scope of work? If so, where will the new ATS need to be located. It doesn't appear that the new ATS will be able to be installed in the existing location due to its size and all of the elevator equipment being in the way.

Derrick

BWS

See attached Addendum 1, dated September 4, 2025.

8. Drawing P3.10

See attached 3rd floor proposed ceiling demo plan. We anticipate removal of roughly 40 sq/ft of hard lid ceilings on the 3rd floor, this is not show in the plans and we wanted to make sure the owners accepts this approach.

Derrick/

BWS

No exception to proposed extend of demolition of the 3rd floor ceiling. The means and methods for accessing the under-floor plumbing shall be coordinated with the COR. Refer to specifications for additional information for demolition and selective demolition.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

9. Spec Section 083400

The spec book calls out for 083400 clean room doors and Terra Universal as the manufacturer. This door system does not show up on the door schedule, can you provide additional information, location?

Derrick/

BWS

The doors in questions are indicated as Doors 041, 042, 046 and located at the Ante and Compounding Rooms.

10. Spec Section 122413

Provide location for 122413 rolling shades per spec book Derrick/

BWS

See attached Addendum 1, dated September 4, 2025.

Specification Section 122413 – Rolling Shades is hereby removed in its entirety.

11. Spec Section 102800

Provide location for 102800 toilet accessories per spec book Derrick/

BWS

See attached Addendum 1, dated September 4, 2025.

Specification Section 102800 – Toilet Accessories is hereby removed in its entirety.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

12. Where the standpipe bores through the metal stairwell, what type of repair would the owners like to see? See picture below

Derrick/

BWS

Where risers are being demolished through landings, provide steel plate (welded all sides) to underside of landing and fill hole with 2500psi concrete. Ensure concrete is smooth and level for seamless transition.

Paint steel to match adjacent finish. Where risers/standpipe lines are demolished through walls or floors, patch wall or floors to like new condition and paint to match adjacent surface. Ensure smooth seamless transitions at exposed sides.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

13. Med Gas There are medical gas demo items in the Demolition Images Page A2.61 that are not shown on the Demolition Drawings Page A2.50. Please see attached image with green arrows.

We need clarification on the following items shown in the images:

OR 1 4-063 (Image one)

• Demolish metal shroud and associated accessories. There appears to be a medical gas Alarm panel that probably has alarm panel piping run to it?

• Demolish overhead metal chase completely (Far right side of image) This appears to be an operating room boom that typically contains medical gas?

OR 1 4-063 (Image two)

• There appears to be a medical vacuum inlet in the tile wall.

Does this get removed?

OR Corridor C 4-02 (Image three)

• Operating Room Corridor shows demolition of two zone valve boxes. Are there service valves that feed these zone valve boxes for the required shut down and demolition?

Sterile Storage 4-062 (Image five)

• Demolish medical gas completely? These components, do not appear to be associated with medical gas? Please clarify.

Derrick/

BWS

Medical gas demolition is covered on sheet P2.20.

OR 1 4063:

All existing medical gases and all associated outlets and stainless-steel chases within the area of remodel shall be removed. Any associated medical gas alarm or notification devices shall be removed in coordination with the manufacturer and IHS COR.

OR Corridor C4-02:

Demolition of the two (2) zone valve boxes will require a shutdown of the floor distribution system with the service valves at the floor main branch piping. Any shutdown will require coordination with IHS COR.

Sterile Storage 4-062:

Components recessed on these two (2) walls are line isolation monitors that shall be demolished in coordination with Keynote #1 on sheet E2.10.

References to the photo of Sterile Storage 4-062 shall be updated from “Medical Gas” to “Electrical”.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

OR 2 4–061 (Image seven)

• There is a stainless-steel cover over a medical vacuum inlet and shown to Relocate equipment, typical? This is not a demo item?

• The stainless-steel cover on the left of the photo appears to have a medical gas alarm panel in it?

OR 2 4–061 (Image eight)

• Demolish overhead metal chase completely (Far right side of image) This appears to be an Operating Room boom that typically contains medical gas?

• There appears to be a medical vacuum outlet on the back wall below the clock?

OR 2 4061:

All existing medical gases and all associated outlets and stainless-steel chases within the area of remodel shall be removed. Any associated medical gas alarm or notification devices shall be removed in coordination with the manufacturer and IHS COR.

The note to “relocate equipment” in OR 2 4061 is in reference the equipment in the middle of the room within the photo. The demolition notes for the medical vacuum inlet and associated stainless steel shroud is noted above.

14. May the QCM assume the responsibilities of the SSHO on this project?

May the QCM assume the responsibilities of the Superintendent on this project?

May the SSHO assume the responsibilities of the Superintendent on this project?

Kelly/ Derrick

Reference the note at the bottom of H.6. Key Personnel.

* The Superintendent may be dual-hatted as the Safety Officer if they have a relevant certification or training (e.g., OSHA, Board of Certified Site Safety and Health Officers (BCSSHO), or completed OSHA 30-hour Construction Training Course). If a dual hatted role is being used, annotate such in the Safety Plan.

A Quality Control Manager position is not a requirement under the terms and conditions of the solicitation and resulting award.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

15. Can conduit be surfaced mounted? Derrick/

BWS

Surface mounted conduit can only be used in electrical, mechanical and elevator spaces. All other conduit, boxes, devices, etc. shall be recessed.

16. Will conduit need to be red, or will conduit need to be painted to match existing and red banded?

Derrick/

BWS

Match existing conduit colors for fire alarm and emergency feeders.

17. Can existing conduits be reused? Derrick/

BWS

Yes, existing conduits can be used if they are in good condition and match the sizing per the design documents.

18. Will the building be occupied during fire sprinkler installation? Derrick/

BWS

The current system needs to remain active while new pipe installation occurs to limit downtime of switch over. Coordination with PIMC will need to be in place for impairment which formally documents shutdown of fire protection system, notification of relevant parties such as fire department and building occupants, and procedures to implement temporary measures such as fire watch or evacuation and using tags to visually indicate the system is out service.

19. Will off-hour work be required? Derrick Yes, after hours work will be required or the ATS work.

Reference Amendment A00006 for revised H.1. Work Hours language.

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

20. For the RFP what is the order of precedence, code or scope of work?

Kelly Reference Section C which reads “If discrepancies are found between the attached plans/specifications and codes or standards as referenced, the codes or standards shall govern, unless noted otherwise.”

21. In the event of conflict between scope of work and code what will be preferred?

Kelly Refer to Question #20 above

22. Please confirm if this project is based on calendar days or business days?

Kelly Reference F.2.

Unless otherwise specified, all references to “days” in this solicitation and any resulting contract shall mean “calendar days.” This definition applies to all instructions, deadlines, evaluation factors, and any resulting contract requirements.

23. Upon reviewing the pharmacy plans provided, we noted only one window identified on page 8 with dimensions of 4' x 3'8". Could you please confirm whether this is the only window of this size included in the scope of work, or if there are multiple windows of the same size located throughout the office that should be considered for pricing?

Derrick/

BWS

Refer to Detail 1 of sheet A6.10 for location of window.

24. The only fabrication detail identified appears to be a hand railing intended for installation on the roof; however, we are unable to locate this element on any of the floor plan pages. Could you please provide clarification on the location of this hand railing and the total linear footage required?

Derrick/

BWS

Refer to Keynote 404 on sheet A4.70. Keynote should read as follows: “STEEL GUARDRAILS AT 42” ABOVE

ROOF, PAINT YELLOW – REFER TO 11/A10.2”

Project PH23PH06H6, PIMC Pharmacy, ATS, & Standpipe

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-25-R-00029

PROJECT:

PIMC Pharmacy, ATS, & Standpipe

LOCATION: Phoenix, AZ

PROJECT NO: PH23PH06H6

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081

602-245-2206 (cell) DOCUMENTS:

DATE: 9/8/2025 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

25. Follow-up to Question #4 above, I count (22) locations of the hose cabinets, the answer states that (9) have been repaired. Do those 9 count against the (22) noted on the plans for a total of 13 repair locations?

Derrick/

BWS

There will be nine (9) less hose cabinets to complete.

ADDENDUM NO. 1-1

Prepared by:

BWS Architects 4636 N. 32nd Street Phoenix, Arizona 85018

Project:

Indian Health Service PIMC Pharmacy, ATS, & Standpipe 4212 N. 16th Street Phoenix, Arizona 85016

ADDENDUM NO. 01

September 4, 2025

All requirements contained in the Contract Documents dated April 4, 2025 shall apply to this Addendum, and the general character of the Work called for in this Addendum shall be the same as originally set forth in the applicable portions of the Contract Documents for similar Work, unless otherwise specified under this Addendum, and all incidental Work necessitated by this Addendum as required to complete the Work shall be included in the bids, even though not particularly mentioned in this Addendum.

This Addendum is hereby made a part of the Contract Documents. Acknowledge receipt of this Addendum in the space provided on the proposal form. Failure to do so may subject bidder to disqualification.

DRAWINGS ISSUED WITH THIS ADDENDUM:

The following sheets have been re-issued as part of this addendum:

- A2.61 (delta 1) : Added (3) additional images of existing Elevator Machine Room

- A4.70 (delta 1): Added missing keynote 404 to keynotes scheduled.

- E3.20 (delta 1): Revised drawings to show new ATS in Elevator Machine

Room and demolition of existing feeder.

- E6.00 (delta 1): Revised one-line diagram to show the demolition of existing ATS and installation of new ATS. Revised electrical keynotes to describe work.

SPECIFICATIONS ISSUED WITH THIS ADDENDUM:

The following sections have been re-issued as part of this addendum:

- Drawing Index: The drawing index has been revised to strike out specification sections 102800 – Toilet Accessories and 122413 – Rolling Shades. Section 263600 – Transfer Switches has been added. Contractor shall replace the entire Drawing Index section in the Project manual.

ADDENDUM NO. 1-2

The following sections have been added as part of this addendum:

- Section 263600 - Transfer Switches: Contractor shall incorporate the entire section into the Project Manual. The scope of work defined within this new section shall be included in the bid price.

The following sections have been removed as part of this addendum:

- Section 102800 – Toilet Accessories: Contractor shall remove the entire section from the Project Manual.

- Section 122413 – Rolling Shades: Contractor shall remove the entire section from the Project Manual.

END OF ADDENDUM NO. 1

INDIAN HEALTH SERVICE IHS Project No. PH23PH06H6 PIMC Pharmacy, ATS, & Standpipe BWS 1818.015.2

CONSTRUCTION DOCUMENTS

SPECIFICATIONS – ADDENDUM 01

CONSTRUCTION DOCUMENTS - CONTENTS PG. 1

PROJECT MANUAL

INDIAN HEALTH SERVICE

PIMC Pharmacy, ATS, & Standpipe

CONSTRUCTION DOCUMENTS

April 25, 2025

TECHNICAL SPECIFICATIONS

Division 1 – General Requirements 011100 Summary 013100 Project Meetings 013200 Construction Progress Documentation 013300 Submittals 013526 Safety Requirements 014000 Quality Requirements 014200 References 015000 Temporary Facilities 015010 Infection Control Procedures 016000 Product Requirements 017300 Execution Requirements 017400 Warranties 017700 Project Closeout 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training

Division 2 – Existing Conditions 024113 Selective Demolition 024200 Asbestos Removal

Division 3 - Concrete (Not Used)

Division 4 - Masonry (Not Used)

Division 5 - Metals 055000 Metal Fabrications

Division 6 – Wood, Plastics, and Composites 061000 Rough Carpentry (includes wood roof and wall sheathing) 064023 Interior Architectural Woodwork

CONSTRUCTION DOCUMENTS - CONTENTS PG. 2

Division 7 - Thermal and Moisture Protection 072100 Insulation 076200 Sheet Metal Flashing and Trim 078400 Firestopping 079200 Joint Sealants

Division 8 - Doors and Windows 081113 Steel (Hollow Metal) Frames 081416 Flush Wood Doors 083113 Access Doors and Frames 083300 Rolling Counter Doors 083400 Cleanroom Doors 087100 Finish (Door) Hardware and Hardware Schedule 088000 Glazing

Division 9 – Finishes 092900 Gypsum Drywall Systems 095133 Acoustical Panel Ceilings 096500 Luxury Vinyl Tile (LVT) and Accessories 096516 Resilient Sheet Flooring 099000 Painting

Division 10 – Specialties 101000 Tackboards 101001 Markerboards 101423 Room Signage 102600 Corner Guards 102800 Toilet Accessories – ADDENDUM 01 104413 Fire Extinguishers and Cabinets 105113 Knocked-Down Metal Lockers

Division 11 – Equipment 114001 Interior Miscellaneous Equipment

Division 12 – Furnishings 122413 Rolling Shades – ADDENDUM 01

Division 13 - Special Construction 132000 Clean Room Pass-Through Chambers

Division 14 – Conveyances (Not Used)

Division 21- Fire Protection 211100 Fire Protection

CONSTRUCTION DOCUMENTS - CONTENTS PG. 3

Division 22 – Plumbing 224000 Plumbing

Division 23 – HVAC 230500 Basic Mechanical Materials and Methods 230593 Testing, Adjusting, and Balancing (TAB) 230700 Mechanical Insulation 230800 Commissioning of HVAC Systems (IECC) PIMC Inpatient Pharmacy Cx Plan 230900 Energy Monitoring Control System (EMCS) 232000 Building Services Piping 233000 Air Distribution

237000 HVAC

Division 26 – Electrical 260500 Common Work Results for Electrical 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Identification for Electrical Systems 262416 Panelboards 262726 Wiring Devices 263600 Transfer Switches – ADDENDUM 01

Division 28 – Electronic Safety and Security 281500 Access Control 281800 Burglar Alarm System 282000 Video Surveillance

Division 31 – Earthwork (Not Used)

Division 32 – Exterior Improvements (Not Used)

END OF CONTENTS

SPECIFICATIONS – ADDEDNDUM 01

TRANSFER SWITCHES – ADDENDUM 01 263600 - 1

SECTION 263600 - TRANSFER SWITCHES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Contactor-type automatic transfer switches.

2. Transfer switch accessories.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for transfer switches.

2. Include rated capacities, operating characteristics, electrical characteristics, and accessories.

B. Shop Drawings:

1. Include plans, elevations, sections, details showing minimum clearances, conductor entry provisions, gutter space, and installed features and devices.

2. Include material lists for each switch specified.

3. Single-Line Diagram: Show connections between transfer switch, bypass/isolation switch, power sources, and load; and show interlocking provisions for each combined transfer switch and bypass/isolation switch.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For manufacturer-authorized service representative.

B. Field quality-control reports.

1.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For each type of product to include in emergency, operation, and maintenance manuals.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 2

1. In addition to items specified in Section 017823 "Operation and Maintenance Data," include the following:

a. Features and operating sequences, both automatic and manual.

b. List of all factory settings of relays; provide relay-setting and calibration instructions, including software, where applicable.

1.6 QUALITY ASSURANCE

1.7 FIELD CONDITIONS

A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service:

1. Notify Owner no fewer than two weeks in advance of proposed interruption of electrical service.

2. Do not proceed with interruption of electrical service without Owner's written permission.

1.8 WARRANTY

A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of transfer switch or transfer switch components that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Comply with NEMA ICS 1.

C. Comply with NFPA 99.

D. Comply with NFPA 110.

E. Comply with UL 1008 unless requirements of these Specifications are stricter.

F. Indicated Current Ratings: Apply as defined in UL 1008 for continuous loading and total system transfer, including tungsten filament lamp loads not exceeding 30 percent of switch ampere rating, unless otherwise indicated.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 3

G. Tested Fault-Current Closing and Short-Circuit Ratings: Adequate for duty imposed by protective devices at installation locations in Project under the fault conditions indicated, based on testing according to UL 1008.

1. Short-time withstand capability for three cycles.

H. Repetitive Accuracy of Solid-State Controls: All settings shall be plus or minus 2 percent or better over an operating temperature range of minus 20 to plus 70 deg C.

I. Resistance to Damage by Voltage Transients: Components shall meet or exceed voltage-surge withstand capability requirements when tested according to IEEE C62.62. Components shall meet or exceed voltage-impulse withstand test of NEMA ICS 1.

J. Electrical Operation: Accomplish by a nonfused, momentarily energized solenoid or electric-motor-operated mechanism. Switches for emergency or standby purposes shall be mechanically and electrically interlocked in both directions to prevent simultaneous connection to both power sources unless closed transition.

K. Annunciation, Control, and Programming Interface Components: Devices at transfer switches for communicating with remote programming devices, annunciators, or annunciator and control panels shall have communication capability matched with remote device.

L. Factory Wiring: Train and bundle factory wiring and label, consistent with Shop Drawings, by color-code or by numbered or lettered wire and cable with printed markers at terminations.

Color-coding and wire and cable markers are specified in Section 260553 "Identification for Electrical Systems."

1. Designated Terminals: Pressure type, suitable for types and sizes of field wiring indicated.

2. Power-Terminal Arrangement and Field-Wiring Space: Suitable for top, side, or bottom entrance of feeder conductors as indicated.

3. Control Wiring: Equipped with lugs suitable for connection to terminal strips.

4. Accessible via front access.

M. Enclosures: General-purpose NEMA 250, Type 1, complying with NEMA ICS 6 and UL 508, unless otherwise indicated.

2.2 ISOLATION BYPASS CONTACTOR-TYPE AUTOMATIC TRANSFER SWITCHES

A. Manufacturers: Subject to compliance with requirements, provide products by the following:

1. ASCO Power Technologies.

B. Comply with Level 1 equipment according to NFPA 110.

C. Switch Characteristics: Designed for continuous-duty repetitive transfer of full-rated current between active power sources.

1. Switch Action: Double throw; mechanically held in both directions.

2. Contacts: Silver composition or silver alloy for load-current switching. Contactor-style automatic transfer-switch units, rated 600 A and higher, shall have separate arcing contacts.

3. Conductor Connectors: Suitable for use with conductor material and sizes.

4. Material: Hard-drawn copper, 98 percent conductivity http://www.specagent.com/Lookup?ulid=2210

TRANSFER SWITCHES – ADDENDUM 01 263600 - 4

5. Main and Neutral Lugs: Mechanical type.

6. Ground bar.

7. Connectors shall be marked for conductor size and type according to UL 1008.

D. Automatic Open-Transition Transfer Switches: Interlocked to prevent the load from being closed on both sources at the same time.

1. Sources shall be mechanically and electrically interlocked to prevent closing both sources on the load at the same time.

2. Failure of power source serving load initiates automatic break-before-make transfer.

E. Manual Switch Operation, Load-Breaking: Under load, with door closed and with either or both sources energized. Transfer time is same as for electrical operation. Control circuit automatically disconnects from electrical operator during manual operation.

F. Signal-Before-Transfer Contacts: A set of normally open/normally closed dry contacts operates in advance of retransfer to normal source. Interval shall be adjustable from 1 to 30 seconds.

G. Digital Communication Interface: Matched to capability of remote annunciator or annunciator and control panel.

H. Automatic Transfer-Switch Controller Features:

1. Controller operates through a period of loss of control power.

2. Undervoltage Sensing for Each Phase of Normal [and Alternate ]Source: Sense low phase-to-ground voltage on each phase. Pickup voltage shall be adjustable from 85 to 100 percent of nominal, and dropout voltage shall be adjustable from 75 to 98 percent of pickup value. Factory set for pickup at 90 percent and dropout at 85 percent.

3. Voltage/Frequency Lockout Relay: Prevent premature transfer to generator. Pickup voltage shall be adjustable from 85 to 100 percent of nominal. Factory set for pickup at 90 percent. Pickup frequency shall be adjustable from 90 to 100 percent of nominal.

Factory set for pickup at 95 percent.

4. Time Delay for Retransfer to Normal Source: Adjustable from zero to 30 minutes, and factory set for 10 minutes. Override shall automatically defeat delay on loss of voltage or sustained undervoltage of emergency source, provided normal supply has been restored.

5. Test Switch: Simulate normal-source failure.

6. Switch-Position Pilot Lights: Indicate source to which load is connected.

7. Source-Available Indicating Lights: Supervise sources via transfer-switch normal- and emergency-source sensing circuits.

a. Normal Power Supervision: Green light with nameplate engraved "Normal Source Available."

b. Emergency Power Supervision: Red light with nameplate engraved "Emergency Source Available."

8. Unassigned Auxiliary Contacts: Two normally open, single-pole, double-throw contacts for each switch position, rated 10 A at 240-V ac.

9. Transfer Override Switch: Overrides automatic retransfer control so transfer switch will remain connected to emergency power source regardless of condition of normal source.

Pilot light indicates override status.

10. Engine Starting Contacts: One isolated and normally closed, and one isolated and normally open; rated 10 A at 32-V dc minimum.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 5

11. Engine Shutdown Contacts:

a. Time delay adjustable from zero to five minutes, and factory set for five minutes.

Contacts shall initiate shutdown at remote engine-generator controls after retransfer of load to normal source.

2.3 TRANSFER SWITCH ACCESSORIES

A. Bypass/Isolation Switches:

1. Source Limitations: Same manufacturer as transfer switch in which installed.

2. Comply with requirements for Level 1 equipment according to NFPA 110.

3. Description: Manual type, arranged to select and connect either source of power directly to load, isolating transfer switch from load and from both power sources. Include the following features for each combined automatic transfer switch and bypass/isolation switch:

a. Means to lock bypass/isolation switch in the position that isolates transfer switch with an arrangement that permits complete electrical testing of transfer switch while isolated. Interlocks shall prevent transfer-switch operation, except for testing or maintenance, while automatic transfer switch is isolated.

b. Provide means to make power available to transfer-switch control circuit for testing and maintenance purposes.

c. Drawout Arrangement for Transfer Switch: Provide physical separation from live parts and accessibility for testing and maintenance operations. Transfer switch and bypass/isolation switch shall be in isolated compartments.

d. Transition:

1) Provide closed-transition operation when transferring from main transfer switch to bypass/isolation switch on the same power source.

e. Bypass/Isolation Switch Current, Voltage, Closing, and Short-Circuit Withstand Ratings: Equal to or greater than those of associated automatic transfer switch, and with same phase arrangement and number of poles.

f. Contact temperatures of bypass/isolation switches shall not exceed those of automatic transfer-switch contacts when they are carrying rated load.

g. Manual Control: Constructed so load bypass and transfer-switch isolation can be performed by one person in no more than two operations in 15 seconds or less.

Operating handles shall be externally operated.

h. Automatic and Nonautomatic Control: Automatic transfer-switch controller shall also control the bypass/isolation switch.

i. Legend: Manufacturer's standard legend for control labels and instruction signs shall describe operating instructions.

j. Maintainability: Fabricate to allow convenient removal of major components from front without removing other parts or main power conductors.

4. Interconnection of Bypass/Isolation Switches with Automatic Transfer Switches: Factory-installed copper bus bars; plated at connection points and braced for the indicated available short-circuit current.

B. Remote Annunciator System:

1. Source Limitations: Same manufacturer as transfer switch in which installed.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 6

2. Functional Description: Remote annunciator panel shall annunciate conditions for indicated transfer switches.

3. Annunciation panel display shall include the following indicators:

a. Sources available, as defined by actual pickup and dropout settings of transfer-switch controls.

b. Switch position.

c. Switch in test mode.

d. Failure of communication link.

4. Annunciator Panel: LED-lamp type with audible signal and silencing switch.

a. Indicating Lights: Grouped for each transfer switch monitored.

b. Label each group, indicating transfer switch it monitors, location of switch, and identity of load it serves.

c. Mounting: Flush, modular, steel cabinet unless otherwise indicated.

d. Lamp Test: Push-to-test or lamp-test switch on front panel.

2.4 SOURCE QUALITY CONTROL

A. Factory Tests: Test and inspect components, assembled switches, and associated equipment according to UL 1008. Ensure proper operation. Check transfer time and voltage, frequency, and time-delay settings for compliance with specified requirements. Perform dielectric strength test complying with NEMA ICS 1.

B. Prepare test and inspection reports.

1. For each of the tests required by UL 1008, performed on representative devices, for legally required systems. Include results of test for the following conditions:

a. Overvoltage.

b. Undervoltage.

c. Loss of supply voltage.

d. Reduction of supply voltage.

e. Alternative supply voltage or frequency is at minimum acceptable values.

f. Temperature rise.

g. Dielectric voltage-withstand; before and after short-circuit test.

h. Overload.

i. Contact opening.

j. Endurance.

k. Short circuit.

l. Short-time current capability.

m. Receptacle withstand capability.

n. Insulating base and supports damage.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 7

PART 3 - EXECUTION

3.1 INSTALLATION

A. Floor-Mounting Switch: Anchor to floor by bolting.

1. Coordinate size and location of concrete bases. Cast anchor-bolt inserts into bases.

2. Provide workspace and clearances required by NFPA 70.

B. Annunciator and Control Panel Mounting: Flush in wall unless otherwise indicated.

C. Identify components according to Section 260553 "Identification for Electrical Systems."

D. Set field-adjustable intervals and delays, relays, and engine exerciser clock.

E. Comply with NECA 1.

3.2 CONNECTIONS

A. Wiring to Remote Components: Match type and number of cables and conductors to generator sets, motor controls, control, and communication requirements of transfer switches as recommended by manufacturer. Increase raceway sizes at no additional cost to Owner if necessary to accommodate required wiring.

B. Wiring Method: Install cables in raceways except within electrical enclosures. Conceal raceway and cables except in unfinished spaces.

1. Comply with requirements for raceways and boxes specified in Section 260533 "Raceways and Boxes for Electrical Systems."

C. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding manufacturer's limitations on bending radii.

D. Ground equipment according to Section 260526 "Grounding and Bonding for Electrical Systems."

E. Connect wiring according to Section 260519 "Low-Voltage Electrical Power Conductors and Cables."

F. Route and brace conductors according to manufacturer's written instructions and Section 260529 "Hangers and Supports for Electrical Systems." Do not obscure manufacturer's markings and labels.

G. Brace and support equipment according to Section 260548.16 "Seismic Controls for Electrical Systems."

3.3 FIELD QUALITY CONTROL

A. Administrant for Tests and Inspections:

1. Engage qualified testing agency to administer and perform tests and inspections.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 8

2. Engage factory-authorized service representative to administer and perform tests and inspections on components, assemblies, and equipment installations, including connections.

3. Administer and perform tests and inspections

B. Tests and Inspections:

1. After installing equipment, test for compliance with requirements according to NETA ATS.

2. Visual and Mechanical Inspection:

a. Compare equipment nameplate data with Drawings and Specifications.

b. Inspect physical and mechanical condition.

c. Inspect anchorage, alignment, grounding, and required clearances.

d. Verify that the unit is clean.

e. Verify appropriate lubrication on moving current-carrying parts and on moving and sliding surfaces.

f. Verify that manual transfer warnings are attached and visible.

g. Verify tightness of all control connections.

h. Inspect bolted electrical connections for high resistance using one of the following methods, or both:

1) Use of low-resistance ohmmeter.

2) Verify tightness of accessible bolted electrical connections by calibrated torque-wrench method according to manufacturer's published data.

i. Perform manual transfer operation.

j. Verify positive mechanical interlocking between normal and alternate sources.

k. Perform visual and mechanical inspection of surge arresters.

l. Inspect control power transformers.

1) Inspect for physical damage, cracked insulation, broken leads, tightness of connections, defective wiring, and overall general condition.

2) Verify that primary and secondary fuse or circuit-breaker ratings match Drawings.

3) Verify correct functioning of drawout disconnecting contacts, grounding contacts, and interlocks.

3. Electrical Tests:

a. Perform insulation-resistance tests on all control wiring with respect to ground.

b. Verify settings and operation of control devices.

c. Calibrate and set all relays and timers.

d. Verify phase rotation, phasing, and synchronized operation.

e. Perform automatic transfer tests.

f. Verify correct operation and timing of the following functions:

1) Normal source voltage-sensing and frequency-sensing relays.

2) Engine start sequence.

3) Time delay on transfer.

4) Alternative source voltage-sensing and frequency-sensing relays.

5) Automatic transfer operation.

6) Interlocks and limit switch function.

7) Time delay and retransfer on normal power restoration.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 9

4. Measure insulation resistance phase-to-phase and phase-to-ground with insulation-resistance tester. Include external annunciation and control circuits. Use test voltages and procedure recommended by manufacturer. Comply with manufacturer's specified minimum resistance.

a. Check for electrical continuity of circuits and for short circuits.

b. Inspect for physical damage, proper installation and connection, and integrity of barriers, covers, and safety features.

c. Verify that manual transfer warnings are properly placed.

d. Perform manual transfer operation.

5. After energizing circuits, perform each electrical test for transfer switches stated in NETA ATS and demonstrate interlocking sequence and operational function for each switch at least three times.

a. Simulate power failures of normal source to automatic transfer switches and retransfer from emergency source with normal source available.

b. Verify time-delay settings.

c. Verify pickup and dropout voltages by data readout or inspection of control settings.

d. Test bypass/isolation unit functional modes and related automatic transfer-switch operations.

e. Perform contact-resistance test across main contacts and correct values exceeding 500 microhms and values for one pole deviating by more than 50 percent from other poles.

f. Verify proper sequence and correct timing of automatic engine starting, transfer time delay, retransfer time delay on restoration of normal power, and engine cool-down and shutdown.

6. Ground-Fault Tests: Coordinate with testing of ground-fault protective devices for power delivery from both sources.

a. Verify grounding connections and locations and ratings of sensors.

C. Coordinate tests with tests of generator and run them concurrently.

D. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation and contact resistances and time delays. Attach a label or tag to each tested component indicating satisfactory completion of tests.

E. Transfer switches will be considered defective if they do not pass tests and inspections.

F. Remove and replace malfunctioning units and retest as specified above.

G. Prepare test and inspection reports.

3.4 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain transfer switches and related equipment.

TRANSFER SWITCHES – ADDENDUM 01 263600 - 10

B. Training shall include testing ground-fault protective devices and instructions to determine when the ground-fault system shall be retested. Include instructions on where ground-fault sensors are located and how to avoid negating the ground-fault protection scheme during testing and circuit modifications.

END OF SECTION 263600

DEMOLISH SINKS

AND ASSOCIATED

ACCESSORIES

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

DEMOLISH MECHANICAL

DIFFUSERS

COMPLETELY, TYP.

DEMOLISH FIXTURE

COMPLETELY, TYP.

DEMOLISH CORNER

GUARD, TYP.

DEMOLISH

MEDICAL GAS

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH

WALL FINISH

COMPLETELY,

TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH SINKS

AND ASSOCIATED

ACCESSORIES

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

DEMOLISH CORNER

GUARD, TYP.

DEMOLISH

MEDICAL GAS

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH SINKS

AND ASSOCIATED

ACCESSORIES

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

SALVAGE MONITOR

AND ASSOCIATED

ACCESSORIES AND

TURN OVER TO

OWNER, TYP.

DEMOLISH

MECHANICAL

DIFFUSERS

COMPLETELY, TYP.

SALVAGE BOARD

AND TURN OVER TO

OWNER, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH

MECHANICAL

DIFFUSERS

COMPLETELY, TYP.

DEMOLISH WALL

FINISH AND

SUBSTRATE

COMPLETELY, TYP.

ANY WALL MOUNTED

EQUIPEMENT NOT

SPECIFICALLY CALL ED

OUT TO BE TURNED

OVER TO OWNER

DEMOLISH

CABINET AND

METAL SURROUND

COMPLETELY

DEMOLISH METAL

SHROUD AND

ASSOCIATED

ACCESSORIES

COMPLETELY, TYP.

RELOCATE

EQUIPMENT, TYP.

DEMOLISH WALL

FINISH AND

SUBSTRATE

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

DEMOLISH OVERHEAD METAL

CHASE COMPLETELY, TYP.

SALVAGE OVERHEAD

LIGHT FIXTURE AND TURN

OVER TO OWNER, TYP.

ANY WALL MOUNTED

EQUIPEMENT NOT

SPECIFICALLY CALL ED

OUT TO BE TURNED

OVER TO OWNER

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

SALVAGE MONITOR

AND ASSOCIATED

ACCESSORIES AND

TURN OVER TO

OWNER, TYP.

DEMOLISH

MECHANICAL

DIFFUSERS

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

SALVAGE BOARD

AND TURN OVER TO

OWNER, TYP SALVAGE

OVERHEAD LIGHT

FIXTURE AND TURN

OVER TO OWNER,

TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH

OVERHEAD METAL

CHASE

COMPLETELY, TYP.

RELOCATE

EQUIPMENT, TYP.

ANY WALL

MOUNTED

EQUIPEMENT NOT

SPECIFICALLY

CALL ED OUT TO

BE TURNED OVER

TO OWNER

DEMOLISH

CABINET AND

METAL SURROUND

COMPLETELY

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

DEMOLISH METAL

SHROUD AND

ASSOCIATED

ACCESSORIES

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

RELOCATE

EQUIPMENT, TYP.

DEMOLISH

WALL FINISH

COMPLETELY,

TYP.

DEMOLISH WALL FINISH

COMPLETELY, TYP.

ANY WALL MOUNTED

EQUIPEMENT NOT

SPECIFICALLY CALL ED

OUT TO BE TURNED

OVER TO OWNER

DEMOLISH CEILING

COMPLETELY, TYP.

SALVAGE METAL

CABINET AND TURN

OVER TO OWNER

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH

CABINET AND

METAL SURROUND

COMPLETELY

DEMOLISH

WALL FINISH

COMPLETELY,

TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOLISH

MEDICAL GAS

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

SALVAGE METAL

CABINET AND TURN

OVER TO OWNER

DEMOLISH

WALL FINISH

COMPLETELY,

TYP.

DEMOLISH LIGHT

FIXTURES, TYP.

DEMOLISH MECHANICAL

DIFFUSERS

COMPLETELY, TYP.

DEMOLISH

PLATFORM

COMPLETELY, TYP.

DEMOLISH TOILET

COMPLETELY

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP. DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH SINK

ACCESSORIES

COMPLETELY, TYP.

DEMOLISH DOOR

AND FRAME

COMPLETELY

DEMOLISH WALL FINISH

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH AND WALL

BASE COMPLETELY

& PREP FOR NEW

FINISHES, TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH

CABINET/SINK

AND

ASSOCIATED

ACCESSORIES

COMPLETELY,

TYP.

DEMOLISH FLOOR

FINISH

COMPLETELY &

PREP FOR NEW

FINISHES, TYP.

DEMOLISH DOOR

AND FRAME

COMPLETELY

DEMOLISH

FLOOR FINISH

AND WALL

BASE

COMPLETELY &

PREP FOR NEW

FINISHES, TYP.

DEMOLISH WALL

TILE AND

SUBSTRATE

COMPLETELY, TYP.

DEMOLISH MOPSINK

COMPLETELY

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

SALVAGE MOP

HOOK AND TURN

OVER TO OWNER

DEMOLISH

WALL TILE AND

SUBSTRATE

COMPLETELY,

TYP.

SALVAGE HOOKS

AND TURN OVER TO

OWNER, TYP.

SALVAGE SHELVES

AND TURN OVER TO

OWENR, TYP.

SALVAGE AND

TURNOVER TO

OWNER, TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

SALVAGE SHELVES AND

TURN OVER TO OWENR, TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH FLOOR

FINISH COMPLETELY

AND PREP FLOOR

FOR NEW FINISHES,

TYP.

DEMOLISH WALL

FINISH

COMPLETELY, TYP.

DEMOLISH CEILING

COMPLETELY, TYP.

DEMOL…