This document is an amendment to Solicitation Number 75H70124R00031 for the Indian Health Service (IHS) to replace the existing steam boiler at the Belcourt facility through a design-build construction project. The amendment provides Questions and Answers received as of June 13, 2024, with responses from the IHS Contracting Officer and Contracting Representative. The solicitation remains open with a closing date and time of June 20, 2024 at 1:00 PM Pacific Time. This is a 100% Small Business set-aside under NAICS 238220, with a size standard of $19 million. The contract will be a Firm Fixed Price construction contract. The period of performance is 365 calendar days, and the anticipated construction magnitude is between $250,000 and $500,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

A0003

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Andrew Hart, Contracting Officer

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to Provide Q&A as of June 13, 2024. See next page for the Q&As.

The Solicitation closing date and time remain June 20, 2024 at 1:00 PM (Pacific Time).

All other terms and conditions of this solicitation remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Indian Health Service - DES Seattle 701 Fifth Ave, Suite 1600 Seattle, WA 98104

See Item 6

9A. AMENDMENT OF SOLICITATION NUMBER

75H70124R00031

5. PROJECT NUMBER (If applicable)

GP22TM400H10

1 3

6/13/2024

9B. DATED (SEE ITEM 11)

5/21/2024

Amend No. Item # Date Submitted

Question Type

(Technical or Admin)

Question Response Date Response Responded

By

EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC

A0001 1 6/7/2024 Technical

Please confirm current steam pressure needed for humidification is 0-15 psi Current boiler is high pressure? 06/10/2024

Correct steam pressure for humidification is 0-15 PSI. IHS COR

A0001 2 6/7/2024 Technical

If above question #1 is 0-15 psi is schedule 40 pipe acceptable or is schedule 80 prefered?

06/10/2024

This will need to be determined by the ME during the design phase of the project.

IHS COR

A0001 3 6/7/2024 Technical

Is piping methods to be welded/threaded or is grooved piping allowed? I would advise against grooved

06/10/2024

This will need to be determined by the ME during the design phase of the project.

IHS COR

A0001 4 6/7/2024 Technical

Please confirm ducting on back side of boiler to areas served. Can this AHU be shut down to have ducting removed to allow for boiler removal and install? 06/10/2024

The AHU can be temporarily shut down for the boiler removal and install.

IHS COR

A0001 5 6/7/2024 Technical

Please confirm that emergency stop buttons to be upgraded to current standards to both doorways. Confirm CO2 detector to be replaced and wired to fire panel to have remote alarming. 06/10/2024

Yes, emergency stop buttons should be upgraded to current standards & CO detector should be replaced and wired to fire panel.

IHS COR

A0001 6 6/7/2024 Technical

Please confirm a duplex condensate pump system is required. Duplex= 2 pumps Simplex= 1 pump

06/10/2024

This will need to be determined by the ME during the design phase of the project.

IHS COR

A0001 7 6/7/2024 Technical

Current boiler is 30 hp To feed system we would need 40 hp Is current oil delivery system capacity large enough for this?

06/10/2024

This will need to be determined by the ME during the design phase of the project.

IHS COR

A0001 8 6/7/2024 Technical

Plans state to reuse existing chimney venting Increasing the boiler HP may increase the vent size

06/10/2024

This will need to be determined by the ME during the design phase of the project.

IHS COR

A0002 9 6/10/2024 Admin If a successful bidder was not on site, do they forfeit any unforeseen conditions? 06/11/2024

Refer to RFP Section I. FAR 52.236-2 Differing Site Conditions. CS

A0002 10 6/10/2024 Technical Will Microsoft project be acceptable for project schedule?

06/11/2024 Yes

IHS COR

A0002 11 6/10/2024 Technical Will Procore be acceptable for file sharing, for example, submittals, RFI’s, transmittals, etc.? 06/11/2024

Yes

IHS COR

A0002 12 6/10/2024 Technical

Please clarify how many competent people are needed on site for supervision from the general contractor

a. Can the SSHO dual hat and be the site superintendent?

b. Can the Superintendent triple hat and cover the QC manager role?

c. Are there an y other requirements for supervision?

06/11/2024

a. Yes b. Yes c. No

IHS COR

A0002 13 6/10/2024 Technical

Will the owner please define where the laydown area will be located?

06/11/2024

The southermost parking lot will be available along with the west parking lot near the utility transformer. Other areas may be available temporarily.

IHS COR

A0002 14 6/10/2024 Admin

Are we able to work federal holidays?

06/11/2024

Refer to RFP Section H. Para H.3. Work Hours CS

A0002 15 6/10/2024 Admin

What are the acceptable working hours for the contractor?

a. Are we able to accelerate and work nights if needed 06/11/2024

Refer to RFP Section H. Para H.3. Work Hours CS

A0002 16 6/10/2024 Technical Is an OSHA 10 certification required for all employees on site?

06/11/2024 No

IHS COR

A0002 17 6/10/2024 Technical

If patching a wall, is the requirement to paint from corner to corner on the affected wall or will spot painting be acceptable? 06/11/2024

Spot painting is acceptable

IHS COR

A0002 18 6/10/2024 Technical

Conf irm that the Contractor nor the Government holds ownership of schedule float.

06/11/2024

The government does not specifically monitor schedule float. The contractor is required to meet the periord of performance requirements found in the contract.

IHS COR

A0002 19 6/10/2024 Technical

Please confirm that removal and replacement is limited to just the existing boiler. All piping is to remain.

06/11/2024

Removal is limited to existing packaged steam boiler and integral components (condensate receiver, feed water controller, etc.) shown on included project sheets. Replacement of steam piping after the boiler and integral components is not required in this project.

IHS COR

A0002 20 6/10/2024 Technical

Please confirm. No exis ting asbestos is known for the scope of this p roject. 06/11/2024

Facility can not confirm beyond a reasonable doubt the existence of asbestos. See questions #21.

IHS COR

A0002 21 6/10/2024 Technical Will it be required to perform an asbestos survey for this project?

06/11/2024 Yes.

IHS COR

A0002 22 6/10/2024 Technical

Please confirm the Exis ting boiler is a low pressure system.

06/11/2024

Yes. The existing humidifiers require low pressure steam 0-15 PSI. IHS COR

A0002 23 6/10/2024 Technical Please confirm. The boiler is to be replaced with a low pressure system .

06/11/2024 Yes. Correct.

IHS COR

A0002 24 6/10/2024 Technical

Current Boiler Sits on Legs . No mechanical pad exists as shown on detail 2 on sheet M.2. Will it be required to install pad for the new boiler or to fabricate new like the existing? 06/11/2024

Installation of a new pad is not required.

This is at the discretion of the contractor & designer. IHS COR

A0002 25 6/10/2024 Technical

Please Confirm. Bidders are required to provi de commissioning on this project. 06/11/2024

Commissioning is required as defined in the SOW. IHS COR

A0002 26 6/10/2024 Technical

There are many existing p enetration s in the boiler room walls . W ill the contractor be required to patch/repair all existing penetrations in boiler room walls . 06/11/2024

The contractor is not required to repair existing penetrations. Only penetrations made or modified by the contractor. IHS COR

A0002 27 6/10/2024 Technical

Can IHS provide de t ail on the Fire ratings of the boiler room walls?

06/11/2024

The room is protected by automatic fire sprinklers. See NFPA 101 section 8.7.1.1

IHS COR

A0002 28 6/10/2024 Technical

W hat is the level of ICRA that will be required for this project. B o th inside the Boiler Room and In the Hallway when removing and reinstalling the boiler? 06/11/2024

Class III

IHS COR

A0003 29 6/12/2024 Technical

Page 6 of the SOW lists existing AHU's and humidifiers and page 7 language indicates:

iv. Integration w/ Existing System: The steam boiler shall be designed to integrate and utilize existing piping to the maximum extent possible. The existing piping includes: the existing steam piping system between packaged steam boiler and steam humidifiers, existing combustion gas vent, existing fuel oil piping, and existing feedwater piping [excluding feedwater tank].

The contractors interpretation is that for commissioning purposes, we would be testing basic humidifier operation by ensuring steam is present when the humidifier is enabled. No capacity testing will be performed or humidifier performance other than ensuring delivery of steam. Is this the Governments intent?

06/13/2024

Correct, the contractor is not responsible for the performance of the humidifiers.

The contractor is reponsible to ensure the steam boiler is capable of meeting the lb/hr steam and pressure demands listed in the SOW and not responsible for the performance of the humidifiers themselves.

IHS COR

B05 Addendum #1 2023 09 26.pdf
Subject: Pre-Bid Meeting Minutes & Plan Set Revision, Santa Clara Pueblo – East Housing Lift Station, IHS Project No. AL-18-A86
2022 10 24 B77 Addendum Drawings.pdf
4
scattered housing b77 Revision #1 1- Drywater (1)
scattered housing b77 Revision #1 2 - Hererra (1)
scattered housing b77 Revision #1 3 - Sanchez (1)
scattered housing b77 Revision #1 5-Pecos & Lewis (1)
scattered housing b77 Revision #1 22X34 PLAN (1-40) (1)
ADP90E0.tmp
SECTION B. PRICE SCHEDULE
ADPD131.tmp
SECTION B. PRICE SCHEDULE
ADP129C.tmp
PPI Log
ADP619A.tmp
PPI Log
ADP5CAA.tmp
PPI Log
ADPD2A6.tmp
PPI Log
ADP4D2F.tmp
PPI Log

File details come from the government source that posted it. Updated .