This document is an amendment to Solicitation 75H70124R00031 issued by the Indian Health Service (IHS) for the Belcourt Replace Steam Boiler Design Build project. The purpose of this amendment is to provide a site visit sign-in sheet and answers to questions submitted by potential offerors as of June 11, 2024. The solicitation closing date and time remain June 20, 2024 at 1:00 PM Pacific Time. The project requires the complete replacement of the facility's existing steam boiler, including the design of a new packaged steam boiler, demolition of the existing boiler, and installation of the new boiler integrated into the existing steam piping system. This is a 100% Small Business set-aside solicitation under NAICS 238220 with a $19 million size standard. The contract type is Firm Fixed Price, and the evaluation will be based on the Lowest Price Technically Acceptable (LPTA) approach.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A0002
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Andrew Hart, Contracting Officer
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to Provide 1) Site Visit Sign-In Sheet, and 2) Q&A as of June 11, 2024. See next page for the Q&As.
The Solicitation closing date and time remain June 20, 2024 at 1:00 PM (Pacific Time).
All other terms and conditions of this solicitation remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Indian Health Service - DES Seattle 701 Fifth Ave, Suite 1600 Seattle, WA 98104
See Item 6
9A. AMENDMENT OF SOLICITATION NUMBER
75H70124R00031
5. PROJECT NUMBER (If applicable)
GP22TM400H10
1 4
6/11/2024
9B. DATED (SEE ITEM 11)
5/21/2024
Amend No. Item # Date Submitted
Question Type
(Technical or Admin)
Question Response Date Response Responded
By
EXAMPLE 0 11/23/2020 Technical Please provide drawings or plans for ??? 11/23/2020 IHS Response IHS POC
A0001 1 6/7/2024 Technical
Please confirm current steam pressure needed for humidification is 0-15 psi Current boiler is high pressure? 06/10/2024
Correct steam pressure for humidification is 0-15 PSI. IHS COR
A0001 2 6/7/2024 Technical
If above question #1 is 0-15 psi is schedule 40 pipe acceptable or is schedule 80 prefered?
06/10/2024
This will need to be determined by the ME during the design phase of the project.
IHS COR
A0001 3 6/7/2024 Technical
Is piping methods to be welded/threaded or is grooved piping allowed? I would advise against grooved
06/10/2024
This will need to be determined by the ME during the design phase of the project.
IHS COR
A0001 4 6/7/2024 Technical
Please confirm ducting on back side of boiler to areas served. Can this AHU be shut down to have ducting removed to allow for boiler removal and install? 06/10/2024
The AHU can be temporarily shut down for the boiler removal and install.
IHS COR
A0001 5 6/7/2024 Technical
Please confirm that emergency stop buttons to be upgraded to current standards to both doorways. Confirm CO2 detector to be replaced and wired to fire panel to have remote alarming. 06/10/2024
Yes, emergency stop buttons should be upgraded to current standards & CO detector should be replaced and wired to fire panel.
IHS COR
A0001 6 6/7/2024 Technical
Please confirm a duplex condensate pump system is required. Duplex= 2 pumps Simplex= 1 pump
06/10/2024
This will need to be determined by the ME during the design phase of the project.
IHS COR
A0001 7 6/7/2024 Technical
Current boiler is 30 hp To feed system we would need 40 hp Is current oil delivery system capacity large enough for this?
06/10/2024
This will need to be determined by the ME during the design phase of the project.
IHS COR
A0001 8 6/7/2024 Technical
Plans state to reuse existing chimney venting Increasing the boiler HP may increase the vent size
06/10/2024
This will need to be determined by the ME during the design phase of the project.
IHS COR
A0002 9 6/10/2024 Admin If a successful bidder was not on site, do they forfeit any unforeseen conditions? 06/11/2024
Refer to RFP Section I. FAR 52.236-2 Differing Site Conditions. CS
A0002 10 6/10/2024 Technical Will Microsoft project be acceptable for project schedule?
06/11/2024 Yes
IHS COR
A0002 11 6/10/2024 Technical Will Procore be acceptable for file sharing, for example, submittals, RFI’s, transmittals, etc.? 06/11/2024
Yes
IHS COR
A0002 12 6/10/2024 Technical
Please clarify how many competent people are needed on site for supervision from the general contractor
a. Can the SSHO dual hat and be the site superintendent?
b. Can the Superintendent triple hat and cover the QC manager role?
c. Are there an y other requirements for supervision?
06/11/2024
a. Yes b. Yes c. No
IHS COR
A0002 13 6/10/2024 Technical
Will the owner please define where the laydown area will be located?
06/11/2024
The southermost parking lot will be available along with the west parking lot near the utility transformer. Other areas may be available temporarily.
IHS COR
A0002 14 6/10/2024 Admin
Are we able to work federal holidays?
06/11/2024
Refer to RFP Section H. Para H.3. Work Hours CS
A0002 15 6/10/2024 Admin
What are the acceptable working hours for the contractor?
a. Are we able to accelerate and work nights if needed 06/11/2024
Refer to RFP Section H. Para H.3. Work Hours CS
A0002 16 6/10/2024 Technical Is an OSHA 10 certification required for all employees on site?
06/11/2024 No
IHS COR
A0002 17 6/10/2024 Technical
If patching a wall, is the requirement to paint from corner to corner on the affected wall or will spot painting be acceptable? 06/11/2024
Spot painting is acceptable
IHS COR
A0002 18 6/10/2024 Technical
Conf irm that the Contractor nor the Government holds ownership of schedule float.
06/11/2024
The government does not specifically monitor schedule float. The contractor is required to meet the periord of performance requirements found in the contract.
IHS COR
A0002 19 6/10/2024 Technical
Please confirm that removal and replacement is limited to just the existing boiler. All piping is to remain.
06/11/2024
Removal is limited to existing packaged steam boiler and integral components (condensate receiver, feed water controller, etc.) shown on included project sheets. Replacement of steam piping after the boiler and integral components is not required in this project.
IHS COR
A0002 20 6/10/2024 Technical
Please confirm. No exis ting asbestos is known for the scope of this p roject.
06/11/2024
Facility can not confirm beyond a reasonable doubt the existence of asbestos. See questions #21.
IHS COR
A0002 21 6/10/2024 Technical Will it be required to perform an asbestos survey for this project?
06/11/2024 Yes.
IHS COR
A0002 22 6/10/2024 Technical
Please confirm the Exis ting boiler is a low pressure system.
06/11/2024
Yes. The existing humidifiers require low pressure steam 0-15 PSI. IHS COR
A0002 23 6/10/2024 Technical Please confirm. The boiler is to be replaced with a low pressure system .
06/11/2024 Yes. Correct.
IHS COR
A0002 24 6/10/2024 Technical
Current Boiler Sits on Legs . No mechanical pad exists as shown on detail 2 on sheet M.2. Will it be required to install pad for the new boiler or to fabricate new like the existing? 06/11/2024
Installation of a new pad is not required.
This is at the discretion of the contractor & designer. IHS COR
A0002 25 6/10/2024 Technical
Please Confirm. Bidders are required to provi de commissioning on this project. 06/11/2024
Commissioning is required as defined in the SOW. IHS COR
A0002 26 6/10/2024 Technical
There are many existing p enetration s in the boiler room walls . W ill the contractor be required to patch/repair all existing penetrations in boiler room walls . 06/11/2024
The contractor is not required to repair existing penetrations. Only penetrations made or modified by the contractor. IHS COR
A0002 27 6/10/2024 Technical
Can IHS provide de t ail on the Fire ratings of the boiler room walls?
06/11/2024
The room is protected by automatic fire sprinklers. See NFPA 101 section 8.7.1.1
IHS COR
A0002 28 6/10/2024 Technical
W hat is the level of ICRA that will be required for this project. B o th inside the Boiler Room and In the Hallway when removing and reinstalling the boiler? 06/11/2024
Class III
IHS COR
| B05 Addendum #1 2023 09 26.pdf |
| Subject: Pre-Bid Meeting Minutes & Plan Set Revision, Santa Clara Pueblo – East Housing Lift Station, IHS Project No. AL-18-A86 |
| 2022 10 24 B77 Addendum Drawings.pdf |
| 4 |
| scattered housing b77 Revision #1 1- Drywater (1) |
| scattered housing b77 Revision #1 2 - Hererra (1) |
| scattered housing b77 Revision #1 3 - Sanchez (1) |
| scattered housing b77 Revision #1 5-Pecos & Lewis (1) |
| scattered housing b77 Revision #1 22X34 PLAN (1-40) (1) |
| ADP90E0.tmp |
| SECTION B. PRICE SCHEDULE |
| ADPD131.tmp |
| SECTION B. PRICE SCHEDULE |