Amendment A00006 (75H701-24-R-00026).pdf

PDF 368 KB Posted

Attached to
Whiteriver HVAC Upgrades & USP 797-800 Compliance
Solicitation number
75H701-24-R-00026
Issued by

About this file

This document is an Amendment (A00006) to Solicitation 75H701-24-R-00026 for the Whiteriver HVAC Upgrades & USP 797-800 Compliance project. The key details are:

The amendment extends the proposal due date to September 10, 2024, replaces the Wage Determination, revises instructions for proposal submission, and makes changes to the evaluation factors in Sections L and M. It also provides a conformed solicitation document incorporating Amendments A00001 through A00006.

The project scope includes renovating the HVAC systems serving the operating rooms, Central Sterilization, dental clinic, and server room, as well as upgrades to the pharmacy to comply with USP 797 & 800 standards, at the Whiteriver Indian Hospital in Whiteriver, Arizona. The contract is a single Firm Fixed Price award, with a Period of Performance of 365 calendar days. The project is unrestricted, full and open competition under NAICS code 238220, with an estimated magnitude between $1-5 million.

View the file

Other files

File Type Posted
Amendment A00008 (75H701-24-R-00026).pdf PDF
J02 - WD AZ20240027 Mod 5 2024.09.06.pdf PDF
Amendment A00007 (75H701-24-R-00026).pdf PDF
B01 RFP 75H701-24-R-00026 CONFORMED thru A00007.pdf PDF
B01 RFP 75H701-24-R-00026 CONFORMED.pdf PDF
J02 - WD AZ20240027 Mod 3 2024.07.19.pdf PDF
Amendment A00005 (75H701-24-R-00026).pdf PDF
Amendment A00004 (75H701-24-R-00026).pdf PDF
Amendment A00003 (75H701-24-R-00026).pdf PDF
J01a - Construction Drawings - General and Architectural R1.pdf PDF
Amendment A00002 (75H701-24-R-00026).pdf PDF
Amendment A00001 (75H701-24-R-00026).pdf PDF
J01b - Construction Drawings - Structural and Mechanical.pdf PDF
J04a - FORMS_TPT_5000HC_11228.pdf PDF
B01 RFP 75H701-24-R-00026.pdf PDF
J04 - 2024 Exemption Letter for a Qualifying Hospital.pdf PDF
J01a - Construction Drawings - General and Architectural.pdf PDF
J01d - Construction Specifications Rev 1 2023.12.22.pdf PDF
J02 - WD AZ20240027 Mod 1 2024.01.19.pdf PDF
J06 - PPQ.docx DOCX document
J01c - Construction Drawings - Plumbing and Electrical.pdf PDF
J05 - Company Specialized Experience Form Construction.docx DOCX document
J01e - Whiteriver Site Maps.pdf PDF
J03 - Subcontracting Plan.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00006

N/A

KELLY J. BRITTON

PH22WR02H8, Whiteriver HVAC Upgrades & USP 797-800 Compliance

Amendment A00006 is issued to provide a copy of Amendment A00005, reopen the solicitation period, extend the proposal due date to September 10, 2024, replace Attachment J02 Wage Determination, revise clauses in Sections L and M and replace RFP 75H701-24-R-00026 document with a CONFORMED documents incorporating Amendments A00001 through A00006.

SEE CONTINUATION PAGES

Indian Health Service Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

75H701-24-R-00026

PH22WR02H8

1 13

08/26/2024

03/19/2024

Amendment of Solicitation Amendment A00006 under Solicitation 75H701-24-R-00026 Project PH22WR02H8, Whiteriver HVAC Upgrades & USP 797-800 Compliance

SUMMARY OF CHANGES

1. Amendment A00005 was issued on June 12, 2024 as a post-proposal amendment, sent to the offerors who submitted a proposal by the proposal due date of May 17, 2024. Amendment A00005 added Deductive Bid Alternate No. 1, incorporated Section H, I and K clause changes, and requested a revised Volume II - Price Proposal (Factor 4), due June 26, 2024.

2. Amendment A00006 to Solicitation 75H701-24-R-00026 hereby addresses the following:

a. Reopens the solicitation period extending the proposal due date until September 10, 2024 by

2:00 PM MST.

b. SECTION J – LIST OF ATTACHMENTS, Attachment J02 Wage Determination: General Decision Number AZ20240027, Mod 1 dated January 19, 2024 is replaced with the attached Attachment J02 Wage Determination: General Decision Number AZ20240027, Mod 3 dated July 19, 2024.

c. SECTION L – INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS clauses L.12 PROPOSAL PREPARATION INSTRUCTIONS and L.13. GENERAL INSTRUCTIONS changes as follows:

(i) Clause L.12 PROPOSAL PREPARATION INSTRUCTIONS (a) is revised to read as follows:

(a) The offeror’s proposal package shall be submitted electronically in PDF format only. No facsimile or other alternate method of submission will be accepted. Each electronic file submitted as an attachment to an email transmission shall not exceed 10 megabytes in size. If the aforementioned electronic file exceeds 10 megabytes, divide data into separate files so as not to exceed 10 megabytes per file. Due to file size limitations, each electronic file should be attached to a separate email. Electronic files shall be named as 75H701-24-R-00026, Whiteriver HVAC Upgrades & USP 797-800 Compliance (Volume I or Volume II). The named file shall be included in the subject line of the email with the addition of “email X of X” (e.g. email 1 of 2) in the subject line.

“*The offeror’s proposal must be submitted in two (2) volumes (see below). Each of the volumes shall be separate and complete so that evaluation of each may be accomplished independently.

I. Volume I - Technical Proposal (Factor 1: Specialized Experience; Factor 2: Past Performance; Factor 3: Example Construction Schedule; and Factor 4:

Infection Control Risk Assessment (ICRA) Plan

II. Volume II - Price Proposal (Factor 5)”

(ii) Clause L.13. GENERAL INSTRUCTIONS, (1) VOLUME I TECHNICAL PROPOSAL is revised as follows:

(1). L.13.(1)(i) paragraph c) is changed to read as follows:

c). The technical proposal must be legible and not exceed 15 pages, single-sided, exclusive of Factor 2 submission, which includes past performance questionnaires and/or CPARS. Any pages in excess of 15 will be disregarded, and will not be included in the proposal evaluation. Failure of the offeror to comply with the page limitations, resulting in the excess pages not being evaluated, shall not constitute grounds for a protest.

If a teaming arrangement or joint venture is being proposed, a copy of the teaming or joint venture agreement(s) shall be included in the technical proposal. These agreements shall not count towards this factor’s page limitation.

(2). L.13.(1)(ii) Format and Content to read as follows:

(ii) Format and Content. Volume I, Technical Proposal, shall include the following contents:

a) Table of Contents

b) List of Tables and Figures

c) Summary of Technical Proposal

d) Technical Proposal (Evaluation Factors 1 – 4)

(3). L.13.(1)(iii), Factor 1: Specialized Experience is revised to read as follows:

FACTOR 1: Specialized Experience:

Submittal Requirements: The offerors shall exhibit a comprehensive and complete technical proposal that demonstrates their ability to perform the work described in this solicitation and demonstrate a minimum of five (5) years’ of experience doing work of similar scope and complexity by submitting at least three (3) but no more than five (5) relevant projects that are of similar size, scope and complexity as described in this solicitation that must be at least 75% construction progress complete or completed within six (6) years preceding the date proposals are due.

(1). At least one (1) of the projects shall demonstrate relevant experience at an active operating hospital.

(2). At least one (1) of the projects shall demonstrate relevant experience with phasing or high levels of complexity as it relates to the coordination of construction.

a. Experience will be evaluated based on the Offeror’s demonstration of similarly relevant and recent projects within the broad scope of this solicitation for services as described in this solicitation. For the purposes of this factor, “Relevant” is defined as renovations/remodels of mechanical, electrical and plumbing systems. Projects that are similar in size, scope and complexity to the requirements described in this solicitation will be highly scrutinized.

“Recent” is defined as being at least 75% construction progress complete or completed within the past six (6) years preceding the date proposals are due.

b. Attachment J05, Company Specialized Experience Construction Form is provided as a reference for information that shall be included with each project. This form is not required, but each project shall include at least all information on this form (e.g., name, project name, location of project, type of project, owner, scope, firm’s role, cost, subcontracts, dates, reference contact information, etc.).

c. If any experience will be used for evaluation of other than the prime firm, (e.g. affiliates, subsidiaries, parent companies, sister companies, etc.), a teaming arrangement shall be provided. If this is the case, clearly describe any teaming arrangements, describe which firms, firms’ resources, the relative firms’ roles and responsibilities and any contractual arrangements that have been established to constitute the offeror’s team. A teaming agreement is not required for subcontractors. If the Offeror is a Joint Venture (JV), relevant experience should be submitted by that JV entity. If the JV does not have shared experience, projects shall be submitted for each JV partner relevant to their overall JV partnership.

Offerors who fail to submit experience for all JV partners may be evaluated as

“UNACCEPTABLE.”

d. If any of the information required is not included in the proposal, then the contractor may be considered non-responsive and evaluated as “UNACCEPTABLE.”

(4). L.13.(1)(iii) Factor 3: Example Construction Schedule as revised to read as follows:

FACTOR 3: Example Construction Schedule

Submittal Requirements: Submission of this Factor requires the Offeror to submit both a narrative and an example construction schedule from a project submitted under Factor 1. If both of these submissions are not provided under this factor, the Offeror will be evaluated as “Unacceptable.”

(1). The Offeror shall provide a narrative. The narrative shall explain the greatest risk(s) to completing the project on schedule, discuss any construction challenges the offeror foresaw and how they were overcome to ensure all contract work was successfully completed within contract requirements.

(2). The Offeror shall provide an example construction schedule. The example construction schedule shall demonstrate that the offeror has a clear understanding of the numerous requirements of a healthcare construction project; include total contract duration in calendar days, sequencing of work for construction activities, mandatory tasks, specified time for construction submittals, long lead procurement items, any construction phasing of work, and contract closeout submittal items.

This draft schedule will not be included as part of the award. It is merely to evaluate the offeror’s understanding of the technical requirements.

(5). L.13.(1)(iii) Factor 4: Infection Control Risk Assessment (ICRA) Plan is hereby added to read as follows:

FACTOR 4: Infection Control Risk Assessment (ICRA) Plan

Submittal Requirements: The Offeror shall provide a completed plan for one (1) of the projects submitted under Factor 1.

(iii) Clause L.13. GENERAL INSTRUCTIONS, (2) VOLUME II – PRICE PROPOSAL is revised as follows:

(1). Due to the addition to Factor 4 Infection Control Risk Assessment (ICRA) Plan, change “Factor 4: Price” to “Factor 5: Price”

(2). Paragraph 2, Factor 5: Price Proposal, subparagraph (d), revised to read as follows:

(d). Fully complete and submit Attachment J04, Subcontracting Plan in accordance with FAR 19.7, as part of its proposal and comply with the FAR 52.219-9, Small Business Subcontracting Plan requirement (This requirement applies ONLY to Large Businesses under NAICS 238220 and the price proposal exceeds $1.5M).

d. SECTION M – EVALUATION FACTORS FOR AWARD clauses M.1. EVALUATION FACTORS FOR AWARD, M.1.1. VOLUME I: TECHNICAL PROPOSAL, and M.1.2. VOLUME II: PRICE are changed as follows:

(i) Clause M.1 EVALUATION FACTORS FOR AWARD paragraphs (e) and (f) are revised to read as follows:

(e). For purpose of award, the Government will evaluate offers based on the evaluation factors described below. The award decision will be based on the following factors.

Factor 5 (Price) will be evaluated in accordance with paragraph (d) of this Section for proposal(s) determined to be acceptable under Factors 1 through 4. The price evaluation will be based on the “Total Price” listed in Section B.1 of this solicitation.

(f). Factor 5 (Price) will be evaluated for reasonableness in accordance with FAR 15.404-

1. The price evaluation will be based on the “Total Price” listed in Block 17 of the

SF1442.

FACTOR 1 Specialized Experience (Acceptable/Unacceptable) FACTOR 2 Past Performance (Acceptable/Unacceptable) FACTOR 3 Example Construction Schedule (Acceptable/Unacceptable) FACTOR 4: Infection Control Risk Assessment (ICRA) Plan (Acceptable/Unacceptable) FACTOR 5 Price (Reasonableness)

(ii) Clause M.1.1. VOLUME I: TECHNICAL PROPOSAL FACTOR 1: Specialized Experience is revised to read as follows:

M.1.1. VOLUME I: TECHNICAL PROPOSAL

FACTOR 1: Specialized Experience

Basis of Evaluation: Evaluation of this factor will be an assessment of the offeror’s project experience on an Acceptable/Unacceptable basis. To achieve an Acceptable rating, at least three (3) relevant projects submitted must be at least 75% complete within the preceding six

(6) years from the date of proposals and must be determined to be relevant in similar size, scope, and complexity to the requirement described in this solicitation AND:

(1). At least one (1) of the projects shall demonstrate relevant experience at an active operating hospital.

(2). At least one (1) of the projects shall demonstrate relevant experience with phasing or high levels of complexity as it relates to the coordination of construction.

The Government will only review a maximum of five (5) submitted projects under this Factor.

Any projects submitted in excess of five (5) will not be considered.

*If a teaming arrangement or joint venture is being proposed, a copy of the teaming or joint venture agreement(s) shall be included in the technical proposal. These agreements shall not count towards this factor’s page limitation.

* If any affiliates are included as part of the proposal, each affiliate’s experience and past performance will be evaluated in the same manner as the prime offeror. In addition, each affiliate will be subjectively evaluated with regards to what resources will be utilized, how they will be utilized and the overall involvement of the affiliate in performance of the contract.

(iii) Clause M.1.1. VOLUME I: TECHNICAL PROPOSAL FACTOR 3: Example Construction Schedule is revised to read as follows:

FACTOR 3: Example Construction Schedule

Basis of Evaluation: Evaluation of this factor will be an assessment of the offeror’s development of a construction schedule and submission of a narrative from one (1) project submitted under Factor 1 on an Acceptable/Unacceptable basis. Both a construction schedule and submission of a narrative must be submitted to achieve an acceptable rating:

• Narrative: An Acceptable rating for the narrative discusses how any construction challenges the Offeror foresaw were overcome to ensure all contract work was successfully completed within contract requirements.

• Example construction schedule: An acceptable rating for the example schedule must demonstrate a clear understanding of tasks required and sequencing of tasks for a project of this size, scope and complexity.

(iv) Clause M.1.1. VOLUME I: TECHNICAL PROPOSAL FACTOR 4: Infection Control Risk Assessment (ICRA) Plan is hereby added as follows:

FACTOR 4: Infection Control Risk Assessment (ICRA) Plan Basis of Evaluation: Evaluation of this factor will be an assessment of the offeror’s development of an ICRA from one (1) project submitted under Factor 1 on an Acceptable/Unacceptable basis. To achieve an Acceptable rating, the plan must, at a minimum, demonstrate healthcare ICRA experience.

(v) Clause M.1.2. VOLUME II: PRICE, “FACTOR 4: Price” is change to “FACTOR 5: Price.”

3. The changes in Amendments A00001 through A00006 have been incorporated into Solicitation 75H701-24-R-00026 document, provided with this Amendment. Offers must acknowledge receipt of this amendment with their proposal in accordance with Block 11 of the SF 30.

END OF SUMMARY OF CHANGES

"General Decision Number: AZ20240027 07/19/2024

Superseded General Decision Number: AZ20230027

State: Arizona

Construction Type: Building BUILDING CONSTRUCTION, Includes Building Construction on Treatment Plants and on Industrial Sites (Chemical/Processing/Manufacturing Plants, Power Plants, Refineries, Nuclear Plants, Etc.)

County: Navajo County in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 07/12/2024 3 07/19/2024

BRAZ0003-009 07/01/2023

Rates Fringes

BRICKLAYER.......................$ 32.74 9.52

ZONE PAY:

(Radius miles from the intersection of Central Ave. and Washington St., Phoenix, AZ)

Zone A: 0-60 miles- Base Rate Zone B: 61-75 miles- Base Rate plus $2.00 per hour Zone C: 75-100 miles- Base Rate plus $3.00 per hour Zone D: 101-200 miles- Base Rate plus $3.50 per hour Zone E: Over 200 miles- Base Rate plus $6.50 per hour

CARP0408-001 07/01/2023

Rates Fringes

CARPENTER........................$ 33.55 14.17

CARP1327-001 07/01/2019

Rates Fringes

CARPENTER (Drywall Hanging Only)............................$ 26.24 8.86

ELEC0518-011 08/01/2023

(South and East of boundary beginning at a point where clear Creek crosses the Coconino-Navajo County Line, extending North-easterly along Clear Creek and North-easterly to Cottonwood Wash, along Cottonwood Wash North-easterly to intersection with Navajo Reservation, East along Navajo Reservation Boundary line to intersection with Navajo/Apache County lines)

Rates Fringes

ELECTRICIAN (Includes Alarm Installation and Low Voltage Wiring)..........................$ 32.50 9.50+13.25%

* ELEC0640-010 07/01/2024

(Remaining Part)

Rates Fringes

ELECTRICIAN (Includes Alarm Installation and Low Voltage Wiring)..........................$ 36.56 15.16

ENGI0428-003 06/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

(CRANE)

(2) under 15 tons...........$ 33.41 12.57

(3) 15 tons to 100 tons, Tower Crane.................$ 34.49 12.57

(4) 100 tons and over.......$ 35.52 12.57

IRON0075-002 10/01/2023

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL.......................$ 32.00 18.91

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO1184-010 06/01/2023

Rates Fringes

LABORER (MASON TENDER-BRICK).....$ 24.18 7.59

PAIN0086-006 06/30/2021

Rates Fringes

DRYWALL FINISHER/TAPER

ZONE A......................$ 23.55 7.49

ZONE B......................$ 27.05 7.49

ZONE PAY:

ZONE A: Free Zone: A distance of 0 to 100 miles from the old Phoenix courthouse.

ZONE B: A distance of 101 miles and over from the old Phoenix courthouse: $3.50 per hour over ZONE A

ROOF0135-002 07/01/2024

Rates Fringes

ROOFER (Includes Installation of Metal Roofs)..................$ 26.17 7.34

* SUAZ2012-016 05/30/2012

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 17.71 2.60

FLOOR LAYER: Hardwood and Resilient Flooring...............$ 17.98 6.50

GLAZIER..........................$ 15.98 ** 0.79

LABORER: Common or General......$ 11.98 ** 3.13

LABORER: Landscape & Irrigation.......................$ 9.31 ** 0.00

LABORER: Mason Tender - Cement/Concrete..................$ 16.05 ** 1.49

OPERATOR: Backhoe...............$ 14.00 ** 1.80

PAINTER: Brush, Roller and Spray............................$ 16.13 ** 0.00

PIPEFITTER.......................$ 22.21 6.12

PLUMBER..........................$ 19.63 2.83

SHEET METAL WORKER...............$ 18.68 4.91

SPRINKLER FITTER (Fire Sprinklers)......................$ 16.48 ** 2.94

TILE SETTER......................$ 15.93 ** 0.45

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .