This document summarizes amendments to a solicitation for construction services. The solicitation seeks offers for construction of a 6-inch PVC water main and associated appurtenances, as well as new pumphouse piping and plumbing, on the Mescalero Apache Reservation in New Mexico. The solicitation number is 75H701-20-R-00032 and is issued by the Department of Health and Human Services Indian Health Service. The deadline for questions was June 19, 2020 and the proposal due date remains June 26, 2020 at 2:00 PM Central Time. The amendments provide responses to offeror questions, clarify the scope of work such as allowing a 40-foot disturbed work area, and notify offerors that there is no requirement for tribal or Native American-owned business preferences on this project. Liquidated damages will not be assessed.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A0006

The purpose of this amendment is to:

1) Answer questions from prospective offerors

The proposal due date and time remain unchanged, June 26, 2020, 2:00PM CDT .

Indian Health Service (IHS) Division of Engineering Services (DES) 1301 Young Street, Suite 840 Dallas, TX 75202

75H701-20-R-00032

AL-17-A79 & AL-17-A82

1 5

06/22/2020

05/08/2020

SF30 CONTINUATION OF BLOCK NARRATIVE

SUMMARY OF CHANGES

The solicitation is hereby amended to address the following:

1. Respond to inquiries received in addressing the solicitation package. The questions and answers are being consolidated and are presented and answered as follows:

QUESTIONS FROM AMENDMENT A0001

QUESTION 0001: On sheet 01 of 13, for the South Tulie Canyon water main, the vicinity map indicates that there is an existing pump house at the north end of the line and another at the south end, both to be refurbished.

Sheet 11 of 13 shows only one existing pump house. How many existing pump houses are there to be refurbished?

RESPONSE PROVIDED: Sheet 01 incorrectly shows that the south pumphouse needs to be refurbished.

Please see revised Sheet 01 of Attachment 2 – South Tularosa Drawings. As per Sheet 11, only the north pumphouse is to be refurbished under this contract.

QUESTION 0002: On sheet 11 of 13, details show the pump house as existing with a small addition to be built by others. Supplemental Technical provisions, page 4/46 say the scope of this project include furnishing all labor, materials and incidentals to construct a new pump house. Which is correct?

RESPONSE PROVIDED: Per the scope of work, bid schedule, and drawings, constructing a new pumphouse is not part of the contract. All references to new pumphouse have been removed. See revised

Attachment 01 - Supplemental Technical Provisions.

QUESTION 0003: Will there be a mandatory/non-mandatory pre-bid meeting? If so when do you anticipate scheduling?

RESPONSE PROVIDED: Pre-bid meeting will be held on May 27, 2020 at 9AM Mountain Time. The meeting will be held via zoom. Please see FAR Clause 52.236-27 above for further information. While the pre-bid meeting is not mandatory, it is highly encouraged for all prospective offerors to attend.

Individual site visits won’t be held, but you are allowed to drive to the site at your convenience.

QUESTION 0004: Per H.22 of the RFB, what type of Permits/Licenses will be required of the contracting company to obtain?

RESPONSE PROVIDED: As stated in FAR 52.236-7, the Contractor without any additional expense to the Government, is required to obtain any necessary licenses and permits for the performance of the work.

This is the responsibility of the firm to investigate the permits/licenses required.

QUESTION 0005: Per H.9 and H.43 of the RFB, are badges and a security clearances mandatory for the contracting company's staff, or does this pertain to other contracts?

RESPONSE PROVIDED: Per Clause H.9, all personnel are required to wear security badges. Per

Clause H.43, only the superintendent is subject to pass the IHS background investigation and security clearance review, but the contractor is still responsible, at his discretion, for completing investigations and background checks for all employees, including sub-contractors and their employees that perform work under this contract on the job site.

QUESTION 0006: Is there a Tribal TERO tax for this project?

RESPONSE PROVIDED: No, there is no Tribal/TERO tax for this project.

QUESTIONS FROM AMENDMENT A0002

QUESTION 0007: Sheet 12 of 13, Site Electrical. What is the distance between the source of the 480 volt, 3 phase power and the pumphouse. There is no dimension or scale, just a one-line schematic.

RESPONSE PROVIDED: Contractor is responsible for verifying location of all existing utilities. Refer to sheet 2 of 13, general notes 2, “The contractor shall visit the site and determine the actual conditions with regard to the existence of fences, driveways, trees, sidewalks, culverts, utilities …”

QUESTION 0008: Is there any Tribal tax or fee to be paid for this project?

RESPONSE PROVIDED: No, there is no Tribal/TERO tax for this project. The contractor will need to contact Mr. Chris Little, Mescalero Utility Department, (575) 973-2304 for water consumption fees.

QUESTION 0009: Sheet 13 of 13, detail 1A, Typical Trench Section. As there is no geotechnical report, how are we to determine whether or not special embedment will be required?

RESPONSE PROVIDED: B01 Attachment 10 – Technical Provisions, Section 01, TP-107.A, Section 5 and TP107.B specifies that special pipe embedment is not anticipated. If special pipe embedment is required after award, a request for proposal will be issued and a modification will be done to the contract to incorporate this change.

QUESTIONS FROM AMENDMENT A0003

QUESTION 0010: Do either of you know what the liquidated damages will be on this project (Mescalero Well

Connection & Water Main Extension, Solicitation Number 75H701-20-R-00032)? I need that to order the bid bond.

RESPONSE PROVIDED: Liquidated damages will not be assessed on this project.

QUESTION 0011: Can the due date for questions be revised to 4 days after the site visit?

RESPONSE PROVIDED: Per this Amendment, the due date for questions is now COB Monday, June

15, 2020. Site visit information will be forthcoming in the next Amendment.

QUESTION 0012: I’m reviewing the chlorination spec – their requesting a dosing pump that does 2 GPM – 60

GPM, this is extremely large. I don’t have a pump that can do 3600 GPH on the high end. Do you think they have a typo and it should be 2-60 GPH??...which is still a HUGE range. Their tank called out is 55 Gallons, so they’d be pumping that down completely in less than a min. Could this be a typo please confirm?

RESPONSE PROVIDED: The 2gal/min to 60 gal/min is a rating for the carrier pipe. The dosing pump shall be able to treat a pipeline carrying water flowing at 2gal/min to 60 gal/min.

QUESTIONS FROM AMENDMENT A0004

QUESTION 0013: Was the site visit that was held on May 27th mandatory or optional?

RESPONSE PROVIDED: The site visit that was held on May 27th was not mandatory.

QUESTION 0014: Is there a recording of the site visit that we could view?

RESPONSE PROVIDED: Unfortunately, it was not recorded.

QUESTION 0015: Was there a sign in sheet for attendees and is that available now?

RESPONSE PROVIDED: Please see Amendment No. A0003 which contains the sign in sheet for the attendees.

QUESTIONS FROM AMENDMENT A0005

QUESTION 0016: What is the sodium hypo solution strength?

RESPONSE PROVIDED: The sodium hypo solution strength is 10%.

QUESTION 0017: What PPM is needed for testing?

RESPONSE PROVIDED: During testing, a minimum residual of 25mg/L is needed.

QUESTION 0018: We need more information to get the right pump. Previous addendum did not answer our question.

RESPONSE PROVIDED: Metering pump shall be equal to either of the following LMI Pumps: C70-1-

498SP, C76-1-74S, or C90-1-498SP.

QUESTION 0019: - Can you please advise whether the project will require domestic products per the Buy

American FAR clause 52.225-9? Clauses FAR 52.225-1 regarding certificate requirements and FAR 52.225-9 defining construction materials are not included in Section K- Representations, Certifications, and Other

Statements of Offerers but section L.5 lists FAR 52.225-10 Notice of Buy American Requirement- Construction

Materials making whether the requirement is required unclear.

RESPONSE PROVIDED: Yes, this project will require domestic products per FAR clause 52.225-9

Buy American – Construction Materials, which is included in Section I - Contract Clauses. FAR Clause

52.225-1 is not included in the solicitation because this is a construction contract, not a supply or service contract.

QUESTION 0020: The minutes of the virtual site visit indicated that no rock would be encountered, and if it was, that the price would be negotiated. Would you please remove that section from the bid line items, since it will be field negotiated?

RESPONSE PROVIDED: Rock excavation is anticipated at the Orosco Drive Water Main Extension site only and thus it is on Orosco bid schedule (Schedule B). If it is encountered at the South Tularosa

Well Connection site, a unit price will be negotiated. Please see Paragraph 6.d of the attached pre-proposal site visit agenda from June 16, 2020 where this information has been updated.

QUESTIONS FROM AMENDMENT A0006

QUESTION 0021: Both the Tulie Canyon and Orosco Drive drawings (sheet 3) identify a 20’ easement for installation and maintenance activities. Can this requirement pertain to maintenance and access only?

RESPONSE PROVIDED: Yes, this requirement will apply to maintenance and access only.

QUESTION 0022: Installation of the waterline using an excavator, placing the excavated dirt parallel to the trench IAW Sanitation Facilities Construction Technical Provisions (two feet from trench), and maintaining a path for material transport, cement and or water truck traffic will result in a 38-40 foot wide disturbed width.

RESPONSE PROVIDED: A 40-ft disturbed width will be allowed as an outcome of the work.

QUESTION 0023: In addition, there will be a section on the Orosco Drive waterline (approximately 300 LF) that will require clear and grubbing activities the 38-40 width for pipeline installation and fire preventive measures.

RESPONSE PROVIDED: Contractor is required to perform all clearing and grubbing and a 40-ft wide disturbed width will be allowed as an outcome of the work.

This amendment does not extend the proposal due date and time. The proposal due date and time remains Friday, June 26, 2020, 2:00PM CDT. As stated in Amendment A0005, inquiries must be received no later than COB

Friday June 19, 2020 to allow time for a response. Therefore, NO FURTHER QUESTIONS WILL BE

ANSWERED.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitted a signed copy of the SF30. All other terms and conditions remain unchanged.

END OF SUMMARY OF CHANGES