QUESTIONS AND ANSWERS.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
FDA Security Installation and Maintenance Federal contract opportunity
Solicitation number
75F40121R00039
Issued by
Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services

View the file

Other files for this federal contract opportunity

Other files attached to FDA Security Installation and Maintenance, newest first.
File Type Posted
Attachment D - Past Performance Questionnaire - UPDATED DUE DATE.doc DOC document
FDA Solicitation No. 75F40121R00039 - UPDATED - Amendment 3.pdf PDF
FDA Solicitation No. 75F40121R00039 - UPDATED - Amendment 2.pdf PDF
HHS Guide to Completing the Section 508 Product Accessibility Template.docx DOCX document
2021 White Oak Service Tickets.xlsx XLSX spreadsheet
Attachment B - Sample Task Order SOW - UPDATED.pdf PDF
FDA Solicitation No. 75F40121R00039 - UPDATED.pdf PDF
White Oak Device List.xlsx XLSX spreadsheet
Attachment E - Relevant Experience Form - UPDATED - WORD FORMAT.docx DOCX document
Attachment K - DOL Wage Determinations 2015-4269 and 2015-4281 - UPDATED.pdf PDF
Attachment D - Past Performance Questionnaire - UPDATED.doc DOC document
Attachment B - Sample Task Order SOW - UPDATED with track changes.pdf PDF
Attachment D - Past Performance Questionnaire.doc DOC document
Attachment O - FAR Class Deviation 2020-05.pdf PDF
Attachment N - HHS Class Deviation 2020-02 - Accelerated Payments.pdf PDF
Attachment F - Personnel Security Requirements.pdf PDF
Attachment E - Relevant Experience Form.pdf PDF
Attachment A - IDIQ Pricing Worksheet.xls XLS spreadsheet
Attachment J - FAR 52.212-5 In Full Text Applicable To This Acquisition.pdf PDF
Attachment I - FAR 52.212-3 - Offeror Reps and Certs—Commercial Items.pdf PDF
FDA Solicitation No. 75F40121R00039.pdf PDF
Attachment K - DOL Wage Determinations 2015-4269 and 2015-4282.pdf PDF
Attachment H - NPI Form FDA 3398.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment B - Sample Task Order SOW.pdf PDF
Attachment M - FAR Deviation 18-01 (Whistleblower Protection-Commercial).pdf PDF
Attachment L - Sample Commitment Letter.pdf PDF
Attachment G - RFP Question Submittal Form.xlsx XLSX spreadsheet
Attachment C - Sample Task Order Pricing Worksheet.xls XLS spreadsheet
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment G - RFQ Question Submittal Form; Solicitation No. 75F40121R00039
Offerors must use this form to submit all questions in relation to Solicitation No. 75F40121R00039 - FDA Security Installation and Maintenance

The Reference column contains drop-down menus from which the applicable document must be selected. The remaining sections are fill-in cells.

Attachment C - Pricing Worksheet
Attachment E - Labor Category Descriptions
Other
#ReferenceSection & Page #sQuestionAgency Response
1Solicitation instructionsFactor 2 instructions, page 39 of 69Regarding the requirement: "at least two (2) of the citations must be from the proposed Prime." It is common practice for the Government to allow 8(a) companies, specifically Alaskan Native Corporations to utilize past performance references from sister corporations, subsidiaries and parent corporations in accordance with FAR 15.305(a)(2)(iii). Will the Government consider making the same allowance in this case to increase participation from ANC bidders?Yes.
2CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0., paragraph 5.2.1, page 13Is there an existing interface control document that specifies the interface to Quantum Secure's SAFE application? If so, will that document be provided to offerors? If not, please describe the protocol(s) used to exchange data.The document will be provided to the contractor at time of award.
3CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 5.2.1, page 13What data, other than update acknowledgements, is passed from the C-Cure system back to the Quantum Secure SAFE system?HHS and FDA PIV data and physical security access information in near real-time.
4CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 5.2.1, page 13What provisions, if any, must be made for system redundancy, either on the Quantum Secure SAFE or the C-Cure 9000 side of the interface?No special provisions are required.
5CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 5.2.1, page 13Who will be responsible for cybersecurity for the new connector?FDA's Office of Information Management Technology (OIMT).
6CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 9, pages 20 through 23Which of the sites identified in the table are currently operating under the management of the Software House C-Cure 9000 system? Have dates been established for the transition of any sites currently still operating under the management of MDI Safenet?One building on the White Oak Campus. No dates for installs are set yet.
7CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 5.1, page 10Who is responsible for applying security patches or operating system/database management system updates to the systems?Maintenance contractor in conjuntion with FDA OIMT and FDA Physical Security.
8CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 4., page 9Does the Software House C-Cure 9000 system have a current Authority to Operate?Yes.
9CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 4., page 9Is the Software House C-Cure 9000 system up to date with operating system, database management, and applications software?That is currently unknown. A Task Order will be established to verify, certify and update Ccure 9000 Servers.
10CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 4., page 9Is the MDI Safenet system up to date with operating system, database management, and applications software?Yes.
11CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0, paragraph 4., page 9 & Page 10Authority to Operate Does the Monitor Dynamics Inc. 6.2.6 SP4/5 (MDI) and the Software House CCURE 9000 have a current Authority to Operate?Yes.
12CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0 4. FDA TECHNOLOGY page 9 & 10Is there current Software Support Contracts with the all the Software and Hardware Manufactures listed in section 4. FDA Technolgy? If so what is the expiration date of current support for those lised in secion 4. FDA Technology.Yes, under the current maintenance contract. Task orders will be placed as support contracts begin to expire.
13CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORK7.0 Page 12 Spare PartsSpare Parts - As we are providing support for existing field hardware that may be End of Life (EOL) and no longer in production? Does FDA have spares for EOL items? And if not and the manufacturer does not have any spare pieces, what is the expectation and mechanism to resolve EOL Spare Parts.The Offeror shall present its approach in the proposal. Repair or replace as required; FDA does have a very limited supply of MDI legacy parts.
14CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORKFactor 4 - Past Performance Page 40As far as Past Performance - Is the "Offeror" to be identified by Commercial and Government Entity Code "CAGE Code" and Contract Number. Or can an offeror reference as a past performance another subsidiary past performance under a different “Cage Code”. Example, a large corporation has multiple entities with multiple subsidiaries with multiple “Cage Codes” some of which have graduated from the 8(a) program and some that are eligible for 8(a) awards. Can those entities under the corporation who are eligible for 8(a) awards reference as a past performance the work done by other subsidiaries under a different Cage Code who are not eligible for 8(a) awards?The Offeror should be identified by Contract Number and other information required in the Past Performance Questionnaire. There is no requirement for CAGE Code identification.
15OtherSolicitation, , General Formatting Instructions, page 35May 11x17 landscape be used for diagrams and schedules?Yes.
16OtherSolicitation, Factor 1 – Technical Capability, Sub-Factor 2, bullet 4, page 37, and, Factor 3 – Management Approach (IDIQ), bullet 3, page 40Shall resumes be included in Factor 1 – Technical Capability, Technical Sub-Factor 2 - Technical Approach to Sample Task Order SOW: “The resumes of the Offeror’s proposed Task Order Key Personnel. The Offeror must propose Key Personnel (as well as all other proposed personnel) with the necessary qualifications, technical expertise, experience and credentials to perform the requirements of the sample Task Order SOW.”

Or

Shall resumes be included in Factor 3 – Management Approach (IDIQ)- “The resume(s) and signed Letter(s) of Commitment for the Offeror’s proposed Key Personnel. The Offeror must propose Key Personnel with the necessary qualifications, experience and credentials to perform the requirements of the SOW. The Program Manager and Systems Administrator positions are designated as Key Personnel at the IDIQ level.”Resumes shall be provided under Factor 1, Sub-Factor 2 for the Sample Task Order; AND under Factor 3 at the IDIQ level, as specified.
17OtherSolicitation, 15.0PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS, page 34What is the maximum file size of proposal submittal documents for Offerors’ email proposal submittal?There is no maximum file size. However, Offerors must ensure that all files are successfully transmitted to FDA (whether in one email or multiple emails) by the proposal deadline.
18OtherSolicitation, 15.0PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS, page 34May Offerors separate the proposal submittal into more than one email when submitting proposal, if file size of proposal documents is large as answered in Q 17.?Yes.
19CONTRACT REQUIREMENTS/IDIQ STATEMENT OF WORKPage 35 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTSStates "The Offeror must submit each volume in its native format (e.g., Microsoft Word, Excel) and PDF format" Can FDA confirm that they would like the native format in addition to a PDF for each volume, so 8 attachments for the 4 volumes.Yes, confirmed.
20Statement of WorkSection 1, PG 4Is this a single award IDIQ or a multiple award IDIQ?Single award.
21Statement of WorkSection 5.1, PG 12What are the HQ locations?NCR- National Capital Region (VA, MD, DC sites).
22Statement of WorkSection 5.2, PG 12Does the prime have to be an authorized reseller, or can the team collectively meet this requirement?The Offerors' team can collectively meet this requirement.
23Statement of WorkSection 5.2, PG 13Does every technician need to be certified in every system?No.
24Statement of WorkSection 22, PG 68Is the bidder supposed to use Attachment E Relevant Experience Form for the Factor 2 Relevant Experience response?Only partly. Please refer to the Factor 2 Instructions regarding detailed narratives and other information.
25Statement of WorkSection 15, PG 34Can FDA confirm the response structure as it relates to volumes 1 through 4 and evaluation factors 1 through 5 listed in Section 16, PG 37?Volume 1
Volume 2
i.Factor 1
1.Subfactor 1
2.Subfactor 2
ii.Factor 2
iii.Factor 3
Volume 3
i.Factor 4
Volume 4
i.Factor 5That is correct.
26OtherAttachment BThere is no real data to base a level of effort on. Will FDA provide metrics such as number of service calls, average time to repair, equipment numbers, etc… to base the level of effort on?Yes. See attached spreadsheet entitled "2021 White Oak Service Tickets," and updated Attachment B.
27OtherAttachment B, PG 3For Preventive Maintenance, will FDA provide a list of equipment to be maintained?Yes. We have electronic copies of PM sheets. See attached Excel spreadsheet entitled "White Oak Device List."
28OtherAttachment B, PG 6Manufacturer Equipment: RFP states: “The Contractor shall replace and make operational any defective warranty/guarantee items within 24 hours” Is this requirement regardless of “emergency/non-emergency” status of service call?Emergency only.
29OtherAttachment B, PG 7Place of performance: RFP states: “A list of all FDA Physical Security Sites to be maintained is listed in Item #14 below.” There is no #14. Can FDA provide a list of sites to be maintained?The reference to #14 was a typo. See Solicitation, pp. 20-23, for sites to be maintained under the IDIQ. However, also please see updated Attachment B, which has been revised to include only the FDA White Oak campus as the place of performance for the Sample Task Order.
30OtherAttachment BIs the Sample Task awardable?It has been determined that the Sample Task Order will NOT be awarded, and is for evaluation purposes only. The IDIQ guaranteed minimum of $3,000.00 will be funded at IDIQ award. See updated Solicitation, which also includes a revised anticipated IDIQ start date of February 3, 2021 (all Solicitation changes are shaded in yellow).
31Solicitation instructions9.0 & Page 31-32Will the Government please allow the Commitment Letters to be excluded from the proposal Page Count Limitations?Yes, Commitment Letters are excluded from the technical proposal page limitation (see updated Solicitation).
32Solicitation instructions14.0 & Page 34Regarding proposal submission, is there an email megabyte (MB) size limitation for attachments?Not that we are aware of. However, it is the Offeror's responsibility to ensure that all proposal information is successfully transmitted to FDA by the solicitation closing date/time. Also see the answers to Questions 17 and 18.
33Solicitation instructions15.0 & Page 35Can the Government please clarify exactly how many copies of each volume we should be submitting electronically, and what format? Reading "The Offeror must submit each volume in its native format (e.g., Microsoft Word, Excel) and PDF format." implies we are submitting a Word/Excel and PDF version of each file, for a total of at least 8 files. Additionally, PDFing an excel file with formulas can cause problems.
We respectfully suggest that the Government allow just a PDF submission for Volumes 1-3, and an Excel submission for Volume 4.Two (2) copies of each volume are required.
34Solicitation instructions15.0 & Page 35In regards to "The pages of the Offeror’s proposal must include page headers with the same information and page numbers.", will the government please allow page numbers to be put in the footer of the applicable pages, versus the header?Yes.
35Solicitation instructions15.0 & Page 35Will the Government please confirm that the Cover Sheet and Cover Page are one and the same, in terms of being out of page count limitations and requiring the identifying information asked for?Confirmed.
36Solicitation instructions16.0 (Relevant Experience)
16.0 (Past Performance)As an Alaska Native Corporation (ANC)-owned company, our company and sister companies share common ownership through the corporate structure of our Business Unit. We draw on the resources of our parent Corporation and the resources, expertise, and past performance of its sister companies to support contract performance and in demonstrating experience, including that of key leaders.

A Basic Rule created by the Government Accountability Office (GAO):

I.An agency properly may attribute the experience or past performance of a parent or affiliated company to an offeror where the firm’s proposal demonstrates that the resources of the parent or affiliate will affect the performance of the offeror. Alutiiq Pac., LLC, B–409584, B– 409584.2, June 18, 2014, 2014 CPD ¶196 at 4.
II.The relevant consideration is whether the resources of the parent or affiliated company-its workforce, management, facilities or other resources-will be provided or relied upon for contract performance such that the parent or affiliate will have meaningful involvement in contract performance. Ecompex, Inc., B–292865.4 et al., June 18, 2004, 2004 CPD ¶149 at 5.
III.“In this regard, while it would be appropriate to consider an affiliate’s performance record where it will be involved in the contract effort or where it shares management with the offeror.” Fluor Daniel, Inc., B–262051, B–262051.2, Nov. 21, 1995, 95–2 CPD ¶ 241 at 12.
IV.It is inappropriate to consider an affiliate’s record where that record does not bear on the likelihood of successful performance by the offeror and where there is no evidence that the affiliate will meaningfully contribute to performance. Vane Line Bunkering, Inc., B–417859, B–417859.2, Nov. 22, 2019, 2019 CPD ¶409 at 12.
Will the Government please confirm that Prime Affiliate Relevant Experience/Past Performance can be used as the Prime's Relevant Experience/Past Performance Submissions?Yes, the Prime Affiliate Relevant Experience/Past Performance can be used as the Prime's Relevant Experience/Past Performance Submissions.
37OtherAttachment B, Sample Task Order SOW, 10. Place of PerformanceThe paragraph states, "A list of all FDA Physical Security Sites to be maintained is listed in Item #14 below." There is no Item #14 in the document. Can the Government provide the list of all FDA Physical Security sites to be maintained?See the response to Question #29.
38OtherAttachment B, Sample Task Order SOWThere is no list of equipment provided in the Sample Task that needs to be maintained. Will the Government provide a list of equipment so that all bidders are pricing the same requirement?See the response to Question #27.
39OtherAttachment B, Sample Task Order SOWThere is no frequency for required preventative maintenance provided. Will the Government provide the required frequency so that all bidders are pricing the same requirement?Preventive Maintenance shall be performed every 6 months (see updated Sample Task Order SOW).
40Statement of Work10.0 Place of PerformanceThe paragraph states that services shall be performed at FDA facilities throughout the United States. However, a WD schedule was only provided for the White Oak location. Will the Government provide wage determinations for the other work locations?See the corrected Attachment K Wage Determinations applicable to this Solicitation.
41OtherAttachment G, RFP Question Submittal FormThe drop down menu for the Reference does not match the solicitation documents. Information only, but questions will not align with the correct attachments.Acknowledged.
42OtherAttachment EPlease provide a corrected copy of Attachment E (Relevant Experience Form). The published form is a duplicate of Attachment H (NPI Form FDA 3398).Attachment E was correctly uploaded at initial posting.
43Solicitation instructionsAttachment EPlease indicate where offerors should include the completed Attachment H in their proposals.It should be included with the technical proposal and does not count against the page limitation.
44OtherAttachment KPlease incorporate revision 16 to DOL Wage Determination 2015-4269 (revised 10/20/21).See updated Attachment K, which updates WD 2015-4269 and replaces WD 2015-4282 with WD 2015-4281.
45OtherAttachment KPlease confirm whether DOL Wage Determination 2015-4282 rev. 15 is applicable to this procurement.See response to Question #44.
46OtherAttach. B Task Order 01 SOW Sections 2-4, Pages 2, 4No data, such as equipment age, model number, service call history, average time to repair, condition and anticipated replacement of the equipment/PSS is provided regarding maintenance history so that bidders can properly price the effort associated with a firm fixed price quote for corrective maintenance. Will the Government provide this information so that all bidders are pricing the same requirement?Please see updated Attachment B and attached informational spreadsheets.
47Statement of WorkSection 5.5.1 Page 16Please indicate the transition-in time for the Sample Task Order.No transition period is included in the Sample Task Order, as it will not be awarded with the IDIQ.
48Solicitation instructionsSection 15 Page 35Please indicate whether Attachment E (Relevant Experience Form) counts against any applicable page count limitationIt does not count against the page limitation.
49Solicitation instructionsSection 15 Page 35Please indicate whether each proposed resume individually or the resumes, collectively, cannot exceed 3 pages.Each resume individually cannot exceed 3 pages.
50Solicitation instructionsSection 15 Pages 35, 38Please clarify whether the solicited evidence of an offeror's manufacturer certification for the list of equipment in the IDIQ SOW counts against any applicable page count limitation.It does not count against the page limitation.
51Solicitation instructionsSection 15 Pages 35, 38Can the Government please provide the HHS Section 508 Product Assessment Template referenced?A link was provided to access the template in Section 19.
52Solicitation instructionsSection 15 Pages 35, 38Please clarify whether the solicited HHS Section 508 Product Assessment Template counts against any applicable page count limitation.It does not count against the page limitation.
53Solicitation instructionsSection 15 Pages 42 - 43Please provide the Government's intended methodology for evaluating offers' proposed Task 01 pricing in relation to proposed IDIQ pricing. For example, is each pricing element weighed equally?The pricing for the Sample Task Order will not be included in the overall evaluated price. The total proposed IDIQ pricing will comprise the evaluated price. However, the Sample Task Order will be separately evaluated for price reasonableness via price analysis, as described in the solicitation.
54Solicitation instructionsSection 16.0 & Page 38Will the Sample Task be awarded based on submitted proposals or is it just for pricing evaluation purposes?Just for technical and price evaluation purposes.
55Statement of WorkSection 1, PG 4Is this a single award IDIQ or a multiple award IDIQ?Single award.
56Statement of WorkSection 5.1, PG 12What are the HQ locations?NCR - National Capital Region
57Statement of WorkSection 5.2, PG 12Will the Government confirm that the Prime has to be an authorized reseller for MDI, BOSCH, and C-CURE 9000?Yes, confirmed.
58Solicitation instructionsSection 22, PG 68Is the bidder supposed to use Attachment E Relevant Experience Form for the Factor 2 Relevant Experience response?See Answer to Question #24.
59OtherAttachment B, PG 6Manufacturer Equipment: RFP states: “The Contractor shall replace and make operational any defective warranty/guarantee items within 24 hours” Is this requirement regardless of “emergency/non-emergency” status of service call?24 Hour - Emergency only.
60Statement of WorkSection 5.2.1 5)Operations and Maintenance, PG 15The referenced paragraph states that there is a separate HSPD-12 contractor for FDA stating that under that contract, the winner of this contract shall support O&M activities for two (2) data connectors. Can the Government clarify whether or not O&M support for the data connector is under the scope of this contract or the HSPD-12 contract?
No, there is a separate contract for the data connector O&M.
61Statement of WorkSection 5.2.1 5)Operations and Maintenance, PG 15The referenced paragraph states that there is a separate HSPD-12 contractor for FDA. If the winner of this contract shall support O&M activities under the awarded contract for two (2) active connectors which will run in parallel for a period of one (1) year:

a. One (1) MDI production connector for the legacy system, and

b. One (1) additional connector for the C-Cure integration,

Can the Government provide details of the HSPD-12 contract so that we can properly respond to the technical requirements?b. C-CURE Only.
62OtherAttachment B - Sample Task Order SOWWill the Government provide relevant drawings for the proposed sample task order location, White Oak?Drawings are confidential and cannot be shared until the IDIQ award is made.
63Statement of WorkSection-4 Page-10Nortel is listed as an integrated component of the FDA secrutiy systems. Nortel is typically used for data and IP based phone systems. How and to what level are Nortel products integrated or in use with the security systems?Nortel is used for the Garage Code Blue units.
64Statement of WorkSection-4 Page-10Motorola is listed as an integrated component of the FDA security systems. Motorola is typically a radio and consumer electronics manufacturer. How and to what level are motorola products integrated or in use with the security systems?Motorola is used by tha Command Center and Security Guards for White Oak Campus communication.
65Statement of WorkSection-4 Page-9Accutech is listed as an integrated component of the FDA security systems. Accutech is a distributor of technology products and is not a technology. Are there specific produts that Accutech provides that should be associated to the security systems?Accutech is no longer utilized.
66Statement of WorkSection-7 Page-19/20The Systems Administrator experience and requirements states that the Sys Admin must have 5 years of experience with both MDI head-end and field equipment. Would it be more prudent as the FDA is migrating to a Software House enterprise solution which is federally compliant and away from MDI which is not federally compliant that the systems administrator should have a higher certification level and experience base on Software House vs MDI?No. Currently, 99.5% of our system is MDI.
67Statement of WorkSection-4 Page-9If specialized technology or experience is needed to satisfy a requirement under this solicitation, would a subcontractor with the required experience be accepted?Yes.
68Statement of WorkSection-7 Page-19/20The Systems Administrator experience and requirements states that the Sys Admin must have manufacturer certifications. Can you verifiy what manufacturer certifications are required and to what level must the Sys Admin be certified?MDI, BOSCH, CCURE.
69Statement of WorkSection-4 Page-9/10This solicitation states that Smith Detection X-Ray equipment is an integrated component of the FDA security systems. Can you please specify the function or level of integration for this product?Smith Detection X-Ray equipment are used throughout the White Oak campus at entrances. Provide maintenance services.
70Statement of WorkSection-4 Page-9/10This solicitation states that Garrett Magnetometer equipment is an integrated component of the FDA security systems. Can you please specify the function or level of integration for this product?Magnetometer equipment is used through out the White Oak campus at entrances. Provide maintenance services.
71Statement of WorkSection-4 Page-9/10This solicitation states that Foundry Barcade Barrier & Bollard equipment is an integrated component of the FDA security systems. Can you please specify the function or level of integration for this product?Foundry Switches are used on campus for Bosch connections. Brocade Switches are used on campus for Bosch connections.
72Statement of WorkSection-4 Page-9/10This solicitation states that Foundry Barcade Barrier & Bollard equipment is an integrated component of the FDA security systems. Would experience with other barrier and bollard systems be considered as satisfying this requirement?Yes. Electric/Hydraulic Bollards are used on the White Oak Campus.
73Statement of WorkSection-4 Page-9/10This solicitation states that Building Intellegence SV3 Visitor MAnagement equipment is an integrated component of the FDA security systems. Would experience with other Visitor MAnagement systems be considered as satisfying this requirement?Yes. However, there may be a separate Task Order for a BI-SV3 Subject Matter Expert.
74Statement of Work5.1, Task Area 1 - FDA Security Systems Operations and Maintenance, Page 11System Administration - Can the FDA describe the Service Maintenance Database? Is this a custom or COTS solution? If COTS, who is the manufacturer?Contractor solution. COTS preferred.
75Statement of Work5.1, Task Area 1 - FDA Security Systems Operations and Maintenance, Page 11System Administration - Will the contractor be responsible for maintaining this system?Yes.
76Statement of Work5.1, Task Area 1 - FDA Security Systems Operations and Maintenance, Page 11How many non-emergency repairs were initiated during the prior 12 month contract period?Four (4).
77OtherN/APlease Provide a list of the equipment installed at each included FDA site.The list of equipment at each FDA site will be provided at time of award. For equipment at the White Oak Campus for the Sample Task Order, see attached "White Oak Device List" spreadsheet.
78OtherN/ACan the FDA provide a list of all equipment throughout its enterprise, which is covered under this Contract?Such a list would be too exhaustive to access at this time, but will be provided to the contractor after award.
79OtherN/AWhat is the FDA's timeframe for migrating from the MDI ACS to Ccure?1-3 years.
80OtherN/AWhat percentage of the FDA enterprise has been upgraded from MDI to Ccure?.05%. One small building on the White Oak Campus.
81Statement of Work5.1, Task Area 1 - FDA Security Systems Operations and Maintenance, Page 11Spare Parts - does the FDA currently maintain an inventory of spare parts? Is that inventory of spare parts part of the existing contract, and will they transfer as part of contract transition? Where is the inventory located?Spare parts belong to the Government. FDA will issue a Task Order for Spare Parts.
82Statement of Work5.1, Task Area 1 - FDA Security Systems Operations and Maintenance, Page 11Spare Parts - will the Contractor assume ownership of any spare parts held by the incumbent contractor?Spare parts belong to the Government. FDA will issue a Task Order for Spare Parts.
83Statement of WorkContract Documentation, Page 26Can the FDA provide referenced templates and forms required to comply with contract deliverables?The referenced templates and forms will be provided after award.
84Statement of WorkTraining, Page 27Are the mandatory and roles-based training part of the transition period?No. FDA will schedule annually.
85Attachment C - Pricing WorksheetSample Task Order Pricing WorksheetIs it the FDA's intention to award the Sample Task Order to the successful offeror?No.
86Attachment C - Pricing WorksheetAttachment C - Pricing WorksheetWould the FDA consider revising the Sample Task Order pricing worksheet to include a "plug" number for the ODCs? It is extremely difficult to price a full year of sustainment services at all FDA noted locations, thereby rendering a significant competitive advantage to the incumbent.See updated Sample Task Order SOW (Attachment B), as well as informational spreadsheets provided.
87Attachment C - Pricing WorksheetAttachment C - Pricing WorksheetThe Government describes proposing ODC and Material Handling Rates within the Sample Task Order. Where do these numbers go on the template? The only requirement noted is an itemized listing of WHAT the ODCs are we are proposing and the associated price, which would include the application of our indirect rates (ODC / Material Handling). Please advise.Any proposed ODC and Material Handling rates for all years should be specifically stated in the Business Proposal, and the associated dollar amounts should be included (and itemized) in the Attachment C Pricing Worksheet, which can be expanded as necessary.
88Statement of WorkPage 16We assume that during the transition period, 24 hour response is required to the field sites. If so, what is the obligation or role of the transitioning OUT company?The current contractor will continue to respond until the contract expiration date. There will be no formal transition period between contractors.
89Statement of WorkSection 4, FDA Technology, Page 9Accutech is listed as a technology. Accu-Tech is a distributor of many manufacturers, parts and materials. Can the Government more clearly define what technologies, parts, materials from Accu-Tech are being referenced?Accutech is no longer utilized.
90Statement of WorkSection 4, FDA Technology, Page 9When does the software support agreement expire for the existing legacy, MDI 6.2.6 SP4/5 system?June, 2022.
91Statement of WorkSection 4, FDA Technology, Page 9What is the current software version of the Software House CCURE 9000 system?That is currently unknown. A Task Order will be established to verify, certify and update Ccure 9000 Servers.
92Statement of WorkSection 4, FDA Technology, Page 9What is the Software House, CCURE 9000 Serial Number?That is currently unknown. A Task Order will be established to verify, certify and update Ccure 9000 Servers.
93Statement of WorkSection 4, FDA Technology, Page 9When does the software support agreement for the CCURE 9000 system expire?That is currently unknown. A task order will be established to verify, certify and update Ccure 9000 Servers.
94Statement of WorkSection 5.1 Task Area 1, Page 11For technical support (service calls), does the Government prefer a dedicated technical support call center phone number with the ability to audit and track technical support calls, or does the Government prefer a "phone tree" with direct dial phone numbers for the security contractor?Phone Tree. We use the Command Center.
95Statement of WorkSection 5.1 Task Area 1, Page 11Are service calls for secured areas (FDA Bio Safety Level 3 Lab (BLS3) suite, OCI or SCIF areas held to the same service response times (hour) as for non-secured areas?No, they are considered high priority, emergency areas.
96Statement of WorkSection 5.1 Task Area 1, Page 12Can the Government provide a complete list of available spare parts currently stored at the White Oak complex and for each FDA field office that can be utilized for the new contract?This information will be provided at time of award.
97Statement of WorkSection 5.3, Task Area 3 - WarrantyWill the incumbent security contractor turn over all relative warranty information for installed hardware/software to the new security contractor to ensure a seamless flow of warranty support for installed devices?The incumbent contractor will turn over all warranty and other information to the Government, who will then turn it over to the new contractor after award.
98Attachment C - Pricing WorksheetAttachment A IDIQ Pricing WorksheetOn Row 20 of the Pricing Tab, there is a blank row for each ordering period. Is this an option to add an additional labor category and labor rate or should Row 20 be left blank?No. Row 20 should be left blank. Additional labor categories and rates should not be added.
99Attachment C - Pricing WorksheetAttachment A IDIQ Pricing WorksheetCan the Government confirm that Attachment A, IDIQ Pricing Worksheet only contain labor and does not include travel, materials, ODCs, software support agreements, etc.?Yes, that is correct, only labor.
100OtherAttachment B Sample Task Order SOW, Page 7Can the Government confirm that the sample task SOW only includes maintenance, support, etc. for the White Oak Campus and does not include any activities or travel associated with the FDA remote field offices?Yes, it only includes maintenance support for the White Oak Campus, per the updated Attachment B.
101OtherAttachment B Sample Task Order SOWCan the Government confirm that the sample task SOW does not include any new installations and development of Software House IT Data Connector Sub Task?Correct, it does not. New installs will be covered in separate Task Orders.
102OtherAttachment B Sample Task Order SOW, 2 Objectives, Page 2Should the security contractor assume for purposes of pricing the sample tasks that all software support agreements are current at the start of the base ordering period?Yes.
103Statement of WorkSection 5.1 / Page 12Please confirm Non-emergency repairs must be included in Sample Task Order PricingYes, confirmed. Also, please see spreadsheet entitled "2021 White Oak Service Tickets."
104Statement of WorkSection 5.1 / Page 12Please confirm Emergency Repairs support must be included in Sample Task Order PricingYes, confirmed. Also, please see spreadsheet entitled "2021 White Oak Service Tickets."
105Solicitation instructionsPage 43Is there a fixed/annual ODC travel budget ?No.
106Attachment B - Past Performance QuestionnaireN/APlease provide an editable copy so that we can prefill portion of the document before forwarding it to the appropriate reference to complete and send to FDA.An MS Word version of Attachment B was uploaded on 11/11/2021.
107OtherAttachment B Sample Task Order 1, note 10 Place of Performance, page 7From all 17 Systems listed on page 5-6 Note 4, what are exact systems that are used in note 10 Place of Performance, page 7?Yes, see attached spreadsheet entitled "White Oak Device List."
108Attachment C - Pricing WorksheetPage 1At this time we have to fill out this sheet based on Attachment B Sample Task Order 1, CORRECT?Yes.
109Attachment C - Pricing WorksheetPage 1Attachment C calls for Itemized material/equpment cost in last line - do we need to provide this cost at this time?Yes. Offerors can expand the spreadsheet as necessary.
110Attachment C - Pricing WorksheetPage 1Attachment B Sample Task Order 1 does not provide any equipment quantity, no model numbers, does not say what needs to be done with 17 systems at Task Order 1 location. How do we know what is needed to be quoted in Equipment on Attachment C?See attached spreadsheet entitled "White Oak Device List."
111OtherAttachment B Sample Task Order 1Please provide all part numbers and quantity for equipment that needs to be quoted on Attachment C for Attachment B Sample Task Order 1.See attached spreadsheet entitled "White Oak Device List."
112OtherAttachment B Sample Task Order 1, page 5-6, note 4Do you have list of Active Vehicle Barrier assets make/model/quantity each for the specified Delta Barriers and Bollards and those stated are to be included in note 10 Place of Performance, page 7?Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
113Attachment C - Pricing WorksheetPage 1Do we need to fill out Attachment C at this time?Yes.
114Attachment A - Relevant Experience FormAttachment A Labor Rates, page 1Are we only providing Attachment A Labor Rates at this time and nothng else?Attachment C pricing information must also be provided for the Sample Task Order.
115Attachment C - Pricing WorksheetAttachment CIs this project sales tax exempt?That is unknown at this time. However, see the following web link for guidance information: https://www.mtc.gov/Resources/Uniform-Sales-Use-Tax-Exemption-Certificate
116OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: What is the list of Active Vehicle Barrier assets make/model/quantity each for the specified Delta Barriers and Bollards?Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
117OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: What is the list of Active Vehicle Barrier assets make/model/quantity each for the specified NCR Region Barriers?Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
118OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: What location(s) address are the NCR Barriers located?White Oak Md Campus
119OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: Provide the original Project’s Technical Product Data for each Barrier/Bollard to be maintained, including schematic details.Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
120OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: Provide the original Project’s Barrier/Bollard to be maintained, Sequence of Operations detail for each access-control point location.Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
121OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: What is the current Preventative Maintenance schedule for each Barrier/Bollard asset to be maintained?Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
122OtherAttachment B Sample Task Order 1Page 5-6, note 4 equipment, for Location in Note 10: Are any of the specified Active Vehicle Barrier / Bollards inoperable? If yes, which locations?Vehicle Barriers are being removed from the Sample Task Order. See updated Attachment B.
123Attachment B - TO Statement of WorkSection 3. Scope of Work: States - The Contractor shall provide all necessary parts and labor to maintain all PSS. All systems utilized by the Physical Security Office are required to be maintained to 100% efficiency 24 hours a day 365 days a year. / Section 6. Warranty: States - The Contractor shall replace and make operational any defective warranty/guarantee items within 24 hours. / Section 4. FDA Technology: States – The FDA security systems, in whole, is comprised of multiple integrated systems installed at individual locations nationwide, to include, but not limited toWe are requesting for guidance in how we can submit an accurate FFP Attachment C a Firm Fixed Price (FFP) without hardware amount and location as well as any historical service information that others we are competing against have? / Missing Information:

In no location or attachment or Appendix does the RFP No. 75F40121R00039 provide any counts of hardware associated with the FDA Technology per location.

Yet we are asked to provide in pricing model Attachment C a Firm Fixed Price (FFP) for professional services as well as (FFP) Equipment Costs with no guidance to associate costs to.

We were also not provided any historical or guidance to estimate/assume the amount of Technical Support (Service Calls), Non-Emergency Repairs, Emergency Repairs.

That being the case, without this information and our assumption that the incumbent has this information would make it very hard to compete on the procurement to the point of simply not being fair. That said, we have pursued this contract in the past and looking up historical documents for similar contracts example

Request for Quote 16-233-SOL-00794-A0004: FDA Nationwide Physical Access Control System (PACS) an Appendix C – Site Locations w/Equipment was provided.Please see supporting spreadsheet attachments. Also see updated Attachment B (Place of Performance - White Oak location only).
124Attachment A - Relevant Experience FormAttachment E - Relevant Experience FormWill "Attachment E - Relevant Experience Form" be provided in Word format?Yes, Attachment E is being provided in Word format.
125Attachment A - Relevant Experience FormAttachment E - Relevant Experience FormIs "Attachment E - Relevant Experience Form" subject to page limitations?No. See response to Question #48.
126Attachment A - Relevant Experience FormAttachment E - Relevant Experience Form - AND - Section 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35We are required to provide each volume in its native format (e.g., Word), yet this form is provided only in PDF format. Should this form be provided as an attachment? Is this form subject to page limitations?The form is being provided in Word format and is not subject to the technical proposal page the limitation.
127Attachment A - Relevant Experience FormAttachment E - Relevant Experience FormAre we required to use this form as is (PDF format) or can we recreate it in Word?It is being provided in Word format.
128Attachment B - Past Performance QuestionnaireAttachment D - Past Performance QuestionnaireWill "Attachment D - Past Performance Questionnaire" be provided in Word format?Yes.
129Attachment C - Pricing WorksheetAttachment A - IDIQ Pricing Worksheet; Attachment C - Sample Task Order Pricing Worksheet; AND Section 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35"The Offeror must submit each volume in its native format (e.g., Microsoft Word, Excel) and PDF format." Are we required to provide the Excel spreadsheets in PDF format? If YES, could we change the layout to landscape?Yes. Yes.
130Attachment C - Pricing WorksheetAttachment A - IDIQ Pricing Worksheet; Attachment C - Sample Task Order Pricing Worksheet; AND Section 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35Can we add information in the headers and/or footers (e.g., company name, page numbers, volume number, solicitation number and name, date due)?Yes.
131Attachment C - Pricing WorksheetAttachment A - IDIQ Pricing WorksheetWhen we enter the "Escalation Rate" into the spreadsheet, the cells do not automatically calculate. Should they automatically calculate?No. The esclation by rates/dollars must be calculated manually.
132Attachment C - Pricing WorksheetAttachment A - IDIQ Pricing WorksheetThe font color in the "Escalation Rate" cells is white. Could we change the font color to black? Or would that be considered as altering the spreadsheet and therefore cause us to be deemed non-responsive?No, please do not change the font color.
133Attachment C - Pricing WorksheetAttachment C - Sample Task Order Pricing Worksheet; AND 16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Factor 5 - Price; page 43In the “Attachment C - Sample Task Order Pricing Worksheet” it states we can itemize equipment costs. Where should we itemize those costs?
The solicitation instructions state that we must provide supporting documentation for ODC Rate and/or Material Handling Rate/Cost. Where should we provide that supporting documentation?The spreadsheet can be expanded, as necessary, to itemize the equipment costs. The supporting documentation should be included in the Business Volume.
134Attachment C - Pricing WorksheetAttachment A - IDIQ Pricing WorksheetThe instructions state that offers are to complete only the yellow highlighted portions of the spreadsheet. No other cells shall be altered in any way, or offers may be deemed non-responsive. The Grand Total cell automatically populates - please confirm that the information in this cell does not required modification by the Offeror.Yes, confirmed. It should populate automatically.
135Solicitation instructionsSection 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35May we use a reduced font size in the headers / footers?No.
135Solicitation instructionsSection 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35 - AND - 16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Factor 4 - Past Performance; page 40-41If we provide CPARS, are the CPARS subject to page limitations?No.
137Solicitation instructionsSection 15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS; page 35 - AND - 16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Factor 4 - Past Performance; page 40-41If we provide CPARS, the CPARS are in PDF format. How do we provide the entire Volume 4 in Word when the CPARS are PDF?The CPARS sheets can be provided in pdf format.
138Solicitation instructions16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Sub-Factor 2 - Technical Approach to Sample Task Order SOW (page 38); Factor 3 – Management Approach (IDIQ) (page 40)The instructions for both volumes / sections state that we are to provide resumes for the Program Manager and Systems Administrator. If we are proposing the same people for both the Sample Task Order and the IDIQ, are we to provide the same resume(s) in both volumes?Yes.
139Solicitation instructions16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Factor 3 – Management Approach (IDIQ); page 40Letter(s) of Commitment: Are we required to provide Letter(s) of Commitment for personnel that are currently working for our company (the Prime offeror) or for our Subcontractor?Letters of Commitment are required for key personnel only (whether part of the Prime Offeror or Subcontractor).
140Solicitation instructions16.0 BASIS FOR AWARD AND EVALUATION FACTORS, Sub-Factor 2 - Technical Approach to Sample Task Order SOW; page 38HHS Section 508 Product Assessment Template: Will you provide this template? Or a direct link to this template?
Is this template subject to the page limitations?A web link has been provided in the updated Solicitation. The HHS Section 508 Product Assessment Template is not subject to the technical proposal page limitation (see updated Solicitation).
141Solicitation instructions15.0 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS, page 34-35The Cover Letter "Must be signed by an individual with the authority to bind the company." Do we have to provide a signature on the Word version of this document, or would a signature on the PDF version suffice? Can we use a digital signature?Yes, if feasible, please also sign the Word version of the cover letter (whether a manual "script" electronic signature or a digital signature).

File details come from the government source that posted it. Updated .