751_20155.JBB Nahma Grade MultiUse Trail Culvert Installations Project ManualPart-2 reprint.pdf
PDF 5 MB Posted
- Solicitation number
- RFQ 171 230000000526 7
- Issued by
- Clinton County, Michigan
About this file
This document is a project manual and permit authorization prepared by the State of Michigan Department of Natural Resources, Parks and Recreation, in coordination with the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division. The project involves the installation of culverts along the Nahma Grade Multi-Use Trail in Delta County, Michigan, specifically in Nahma Township near County Road 497 and US Highway 2. The primary work includes installing one 40-foot-long by 14-foot-span by 6-foot-rise aluminum arch culvert in a tributary to the Sturgeon River, with excavation of 115 cubic yards of material and backfill of 180 cubic yards within the 100-year floodplain, plus placement of up to 29 cubic yards of riprap for scour protection. The project is owned and managed by the Department of Natural Resources Parks and Recreation (1990 US-41 North, Marquette, MI 49855), with primary contacts including Rob Katona (Trails Specialist), Jeff Barsch (Project Director), and Jason Pascoe (Field Representative). The engineer of record is OHM Advisors (424 Hancock Street, Hancock, MI 49930). The water resources permit (WRP031521 v.1) was issued by EGLE on November 9, 2021, and expires November 9, 2026, with a five-year validity period from issuance.
The permit establishes comprehensive specifications and conditions for construction work, requiring contractors to follow Michigan Department of Transportation Standard Specifications for Construction (2012 Edition) and maintain compliance with multiple state environmental protection acts, including Part 301 (Inland Lakes and Streams), Part 303 (Wetlands Protection), Part 323 (Shorelands Protection and Management), and Part 31 (Water Resources Protection/Floodplain Regulatory Authority). Key permit conditions include completing work during dry periods or using equipment mats to prevent soil compaction, establishing temporary stream channels or water pumping systems during construction, installing the culvert to align with the existing stream centerline with the invert recessed no more than 2.0 feet into the stream bottom, and stabilizing all fill slopes and raw streambanks with riprap, sod, seed, or mulch before or upon commencement of work. The contractor is responsible for paying all permit fees and permit extension fees except for the EGLE/USACE joint permit obtained by the engineer, providing notice to Miss Dig prior to underground work per 2013 PA 174, maintaining site security and cleanliness, and protecting public safety and adjacent property during construction. The permit is non-transferable without written EGLE approval and will not be extended; if construction is not completed by November 9, 2026, a new permit must be obtained.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MICHIGAN
ADAM P. LACH, RA, DIRECTOR
DESIGN AND CONSTRUCTION DIVISION
C H
IC
A
G O
M
IL
W A
U K
E E
L A
K E
M
IC
H
IG
A N
D E
T R
O
IT
L A
K E
H U
R O
N
S A
U L
T S
T E
M A
R
IE
M A
R Q
U E
T T
E
H O
U G
H T
O N
L A
K E
S U
P E
R
IO
R
D U
L U
T H
M
IN
N E
A P
O L
IS
G R
E E
N B
A Y
E S
C A
N A
B A
T R
A V
E R
S E
C
IT
Y
G R
A N
D R
A P
ID
S L
A N
S
IN
G
P R
O
JE
C T
LO
C
A T
IO
N
A R
E A
L O
C A
T
IO
N M
A P
G E
N E
R A
L N
O T
E S
1.
G E
N E
R A
L N
O
TE
S A
P P
LY
T
O A
LL
D
R A
W
IN
G S
2.
E X
C E
P T
W H
E R
E O
TH
E
R W
IS
E
IN
D
IC
A
TE
D
O N
T H
E S
E P
LA
N
S , O
R
IN
T H
E C
O N
TR
A
C T
D O
C U
M E
N
TS
A N
D S
P E
C
IF
IC
A
TI
O
N S
C O
N
TA
IN
E
D H
E R
E
IN
A
LL
M
A
TE
R
IA
LS
A
N D
W O
R K
M A
N S
H
IP
S H
A
LL
B E
A C
C O
R D
IN
G
T O
T H
E M
IC
H
IG
A
N D
E P
A R
TM
E
N T
O F
TR
A
N S
P O
R
TA
TI
O
N S
TA
N
D A
R D
S P
E C
IF
IC
A
TI
O N
S F
O R
C O
N S
TR
U
C
TI
O N
, 2
E
D
IT
IO
N
3.
D O
N O
T S
C A
LE
D
R A
W
IN
G S
A
N Y
D
IM
E N
S
IO
N A
L
IN
F O
R M
A
TI
O N
R E
Q U
IR
E
D W
H
IC
H
IS
N O
T
IN
D
IC
A
TE
D O
N D
R A
W
IN
G D
IM
E
N S
IO
N
S
TR
IN
G
S S
H A
LL
B
E O
B
TA
IN
E
D F
R O
M T
H E
E N
G
IN
E E
R
4.
C
O N
TR
A
C
TO
R S
H A
LL
V
E R
IF
Y
A
LL
E X
IS
TI
N G
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S
IF
D
IS
C
R E
P A
N C
IE
S
A R
E F
O U
N D
, N O
TI
F
Y E
N G
IN
E
E R
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
5.
C
O N
TR
A
C
TO
R S
H A
LL
P
A Y
A
LL
P E
R M
IT
F
E E
S A
N D
F E
E R
E Q
U
IR
E D
F O
R A
N Y
P E
R M
IT
E
X
TE
N S
IO
N
S E
X C
E P
T
FO
R E
G
LE
/U S
A C
E J
O
IN
T P
E R
M
IT
O B
TA
IN
E D
B Y
T H
E E
N G
IN
E
E R
6.
C O
N
TR
A C
TO
R
S H
A
LL
M A
IN
TA
IN
T
H E
IM
M
E D
IA
TE
C O
N S
TR
U
C
TI
O N
S
IT
E
IN
A S
E C
U R
E
C
LE
A N
A N
D S
A
FE
M A
N N
E R
7.
P R
O
TE
C
TI
O N
C
O N
TR
A
C
TO
R S
S H
A
LL
B E
S O
LE
LY
R E
S P
O N
S
IB
LE
F
O R
T A
K
IN
G A
LL
S
TE
P
S N
E C
E S
S A
R Y
TO
P
R O
TE
C
T
TH
E P
U B
LI
C
F R
O M
IN
JU
R Y
A N
D A
D
JA
C E
N T
P R
O P
E R
TY
FR
O M
D A
M A
G E
D U
R
IN
G C
O N
S
TR
U C
TI
O
N A
S R
E Q
U
IR
E D
B Y
LO
C
A L
C O
D E
S
8.
R
E P
A
IR
A
LL
E
XI
S
TI
N G
C O
N S
TR
U
C
TI
O N
A F
FE
C
TE
D
B Y
N E
W W
O R
K T
O
IT
S O
R
IG
IN
A
L C
O N
D
IT
IO
N
9.
TH
E L
O C
A
TI
O N
O F
A
LL
P U
B
LI
C U
TI
LI
TI
E
S S
H O
W N
O N
T H
E S
E P
LA
N
S
IS
T A
K E
N F
R O
M
TH
E B
E S
T A
VA
IL
A B
LE
D
A
TA
. P U
R S
U A
N T
TO
A
C T
O F
TH
E
P .A
. O F
3, A
S A
C O
N D
IT
IO
N O
F
TH
IS
C
O N
TR
A
C T, N O
TI
C
E S
H A
LL
B
E G
IV
E
N T
O M
IS
S
D
IG
P R
IO
R
T O
U N
D E
R G
R O
U N
D W
O R
K T
O B
E P
E R
FO
R
M E
D
IN
A C
C O
R D
A N
C E
W
IT
H T
H
IS
C O
N
TR
A C
T.
P
H O
N E
0)
-7
1.
CI
VI
L
D R
A W
IN
G
I N
D E
X
C-
- N
OT
ES
C-
- L
EG
EN
D C-
- S
OI
L
BO
RI
NG
S B-
C-
- S
OI
L
BO
RI
NG
S B-
C-
- S
OI
L
BO
RI
NG
S B-
C-
- R
EM
OV
AL
S
- S
O
UT
H
SI
TE
C-
- P
RO
PO
SE
D
- S
OU
TH
S
IT
E C-
- S
OU
TH
C
RO
SS
IN
G
P R
OF
IL
ES
C-
- R
EM
OV
AL
S
- N
O
RT
H
SI
TE
C-
- P
RO
PO
SE
D
- N
OR
TH
S
IT
E C-
- N
OR
TH
C
RO
SS
IN
G
P
RO
FI
LE
S
DT
TI
TL
E
SH
EE
T
I C er tif y
Th at
T he se P la ns
W er e P re pa re d
U nd er M y D ire ct
S up er vi si on
P R
O
JE
C T
L O
C A
T
IO
N M
A P
OW
NE
R:
DE
PA
RT
M
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
PA
RK
S
AN
D
RE
CR
EA
TI
ON
U
S-
N
OR
TH
M
AR
QU
ET
TE
, M I 4
PR
OJ
EC
T
CO
NT
AC
TS
6-
0-
R
OB
K
AT
ON
A, T
RA
IL
S
SP
EC
IA
LI
ST
6-
1-
J
EF
F
BA
RS
CH
, P
RO
JE
CT
D
IR
EC
TO
R
6-
0-
J
AS
ON
P
AS
CO
E, F
IE
LD
R
EP
EN
G
IN
EE
R:
OH
M A
DV
IS
OR
S
HA
NC
OC
K
ST
RE
ET
HA
NC
O
CK
, M
I 4
6.
2.
PR
OJ
EC
T
CO
NT
AC
T
- J
AR
ED
H
YR
KA
S, P E
DE
LT
A
CO
UN
TY
P R
O
JE
C T
L O
C A
T
IO
N N
O R
T H
W A
T E
R C
R O
S S
IN
G
R E
G
IO
N L
O C
A T
IO
N
M A
P
P R
O
JE
C T
L O
C A
T
IO
N
P R
O
JE
C T
L O
C A
T
IO
N S
O U
T H
W A
T E
R C
R O
S S
IN
G
C ou nt y
R o ad
N ah m a
U S
H ig h w a y
DESIGN AND CONSTRUCTION DIVISION
SF
S F
SF
S F
S F
N A
H M
A
COUNTY ROAD 497
U S
-2
N A
H M
A
COUNTY ROAD 497
U S
-2
K no w w ha t's fe et
G R
A P
H
IC
S C
A
LE
F
U L
L fe et
H A
L F
STATE OF MICHIGAN
N A
H M
A
COUNTY ROAD 497
U S
-2
K no w w ha t's
STATE OF MICHIGAN
K no w w ha t's
STATE OF MICHIGAN
This notice must be displayed at the site of work.
Laminating this notice or utilizing sheet protectors is recommended.
Please refer to the above permit number with any questions or concerns.
NOTICE OF AUTHORIZATION
Permit Number: WRP031521 v. 1 Date Issued: November 9, 2021 Site Name: 21-Nahma Grade Multi Use Trail-Nahma Twp Expiration Date: November 9, 2026
The Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, P.O. Box 30458, Lansing, Michigan 48909-7958, under provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended; specifically:
Part 31, Floodplain Regulatory Authority of the Water Resources Protection.
Part 301, Inland Lakes and Streams.
Part 303, Wetlands Protection.
Part 315, Dam Safety.
Part 323, Shorelands Protection and Management.
Part 325, Great Lakes Submerged Lands.
Part 353, Sand Dunes Protection and Management.
Authorized activity:
Install (1) 40-foot-long by 14-foot-span by 6-foot-rise aluminum arch culvert in a tributary to the Sturgeon River. The culvert will be recessed 2.0 feet into the stream bottom and will have a projecting entrance condition. In order to install the culvert, excavate 115 cubic yards of material and backfill with 180 cubic yards of material within the 100-year floodplain. Place up to 29 cubic yards of riprap at the culvert ends for scour protection.
Waterbody Affected: Unnamed tributary to Sturgeon River, 100-Year Floodplain Property Location: Delta County, Nahma Township, TRS 40N 19W Sec 06
Permittee:
Brenda Rebitzke, US Forest Service 1990 US-41 North Marquette, MI 49855
Sean Soucy Marquette District Office Water Resources Division 906-250-0588
MICHIGAN DEPARTMENT OF ENVIRONMENT, GREAT LAKES, AND ENERGY
WATER RESOURCES DIVISION
PERMIT
Issued To:
US Forest Service Attn: Brenda Rebitzke 1990 US-41 North Marquette, MI 49855
Permit No: WRP031521 v.1 Submission No.: HPB-QPBP-G02QF Site Name: 21-Nahma Grade Multi Use Trail-Nahma Twp Issued: November 9, 2021 Expires: November 9, 2026
This permit is being issued by the Michigan Department of Environment, Great Lakes, and Energy (EGLE), Water Resources Division, under the provisions of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA); specifically:
Part 301, Inland Lakes and Streams Part 323, Shorelands Protection and Management
Part 303, Wetlands Protection Part 325, Great Lakes Submerged Lands
Part 315, Dam Safety Part 353, Sand Dunes Protection and Management
Part 31, Water Resources Protection (Floodplain Regulatory Authority)
Permission is hereby granted, based on permittee assurance of adherence to State of Michigan requirements and permit conditions, to:
Authorized Activity:
Install (1) 40-foot-long by 14-foot-span by 6-foot-rise aluminum arch culvert in a tributary to the Sturgeon River. The culvert will be recessed 2.0 feet into the stream bottom and will have a projecting entrance condition. In order to install the culvert, excavate 115 cubic yards of material and backfill with 180 cubic yards of material within the 100-year floodplain. Place up to 29 cubic yards of riprap at the culvert ends for scour protection.
All work shall be completed in accordance with the attached plans and the terms and conditions of this permit.
Waterbody Affected: Unnamed tributary to Sturgeon River, 100-Year Floodplain Property Location: Delta County, Nahma Township, TRS 40N 19W Sec 06
Authority granted by this permit is subject to the following limitations:
A. Initiation of any work on the permitted project confirms the permittee's acceptance and agreement to comply with all terms and conditions of this permit.
Brenda Rebitzke, US Forest Service 2 WRP031521 v.1
B. The permittee, in exercising the authority granted by this permit, shall not cause unlawful pollution as defined by Part 31 of the NREPA.
C. This permit shall be kept at the site of the work and available for inspection at all times during the duration of the project or until its date of expiration.
D. All work shall be completed in accordance with the approved plans and specifications submitted with the application and/or plans and specifications attached to this permit.
E. No attempt shall be made by the permittee to forbid the full and free use by the public of public waters at or adjacent to the structure or work approved.
F. It is made a requirement of this permit that the permittee give notice to public utilities in accordance with 2013 PA 174 (Act 174) and comply with each of the requirements of Act 174.
G. This permit does not convey property rights in either real estate or material, nor does it authorize any injury to private property or invasion of public or private rights, nor does it waive the necessity of seeking federal assent, all local permits, or complying with other state statutes.
H. This permit does not prejudice or limit the right of a riparian owner or other person to institute proceedings in any circuit court of this state when necessary to protect his rights.
I. This permit shall not be assigned or transferred without the written approval of EGLE.
J. Failure to comply with conditions of this permit may subject the permittee to revocation of permit and criminal and/or civil action as cited by the specific state act, federal act, and/or rule under which this permit is granted.
K. All dredged or excavated materials shall be disposed of in an upland site (outside of floodplains, unless exempt under Part 31 of the NREPA, and wetlands).
L. In issuing this permit, EGLE has relied on the information and data that the permittee has provided in connection with the submitted application for permit. If, subsequent to the issuance of a permit, such information and data prove to be false, incomplete, or inaccurate, EGLE may modify, revoke, or suspend the permit, in whole or in part, in accordance with the new information.
M. The permittee shall indemnify and hold harmless the State of Michigan and its departments, agencies, officials, employees, agents, and representatives for any and all claims or causes of action arising from acts or omissions of the permittee, or employees, agents, or representative of the permittee, undertaken in connection with this permit. The permittee's obligation to indemnify the State of Michigan applies only if the state: (1) provides the permittee or its designated representative written notice of the claim or cause of action within 30 days after it is received by the state, and (2) consents to the permittee's participation in the proceeding on the claim or cause of action. It does not apply to contested case proceedings under the Administrative Procedures Act, 1969 PA 306, as amended, challenging the permit. This permit shall not be construed as an indemnity by the State of Michigan for the benefit of the permittee or any other person.
N. Noncompliance with these terms and conditions and/or the initiation of other regulated activities not specifically authorized shall be cause for the modification, suspension, or revocation of this permit, in whole or in part. Further, EGLE may initiate criminal and/or civil proceedings as may be deemed necessary to correct project deficiencies, protect natural resource values, and secure compliance with statutes.
O. If any change or deviation from the permitted activity becomes necessary, the permittee shall request, in writing, a revision of the permitted activity from EGLE. Such revision request shall include complete documentation supporting the modification and revised plans detailing the proposed modification.
Proposed modifications must be approved, in writing, by EGLE prior to being implemented.
P. This permit may be transferred to another person upon written approval of EGLE. The permittee must submit a written request to EGLE to transfer the permit to the new owner. The new owner must also submit a written request to EGLE to accept transfer. The new owner must agree, in writing, to accept all conditions of the permit. A single letter signed by both parties that includes all the above information may be provided to EGLE. EGLE will review the request and, if approved, will provide written notification to the new owner.
Q. Prior to initiating permitted construction, the permittee is required to provide a copy of the permit to the contractor(s) for review. The property owner, contractor(s), and any agent involved in exercising the permit are held responsible to ensure that the project is constructed in accordance with all drawings and specifications. The contractor is required to provide a copy of the permit to all subcontractors doing work authorized by the permit.
Brenda Rebitzke, US Forest Service 3 WRP031521 v.1
R. Construction must be undertaken and completed during the dry period of the wetland. If the area does not dry out, construction shall be done on equipment mats to prevent compaction of the soil.
S. Authority granted by this permit does not waive permit requirements under Part 91, Soil Erosion and Sedimentation Control, of the NREPA, or the need to acquire applicable permits from the County Enforcing Agent (CEA).
T. Authority granted by this permit does not waive permit requirements under the authority of Part 305, Natural Rivers, of the NREPA. A Natural Rivers Zoning Permit may be required for construction, land alteration, streambank stabilization, or vegetation removal along or near a natural river.
U. The permittee is cautioned that grade changes resulting in increased runoff onto adjacent property is subject to civil damage litigation.
V. Unless specifically stated in this permit, construction pads, haul roads, temporary structures, or other structural appurtenances to be placed in a wetland or on bottomland of the water body are not authorized and shall not be constructed unless authorized by a separate permit or permit revision granted in accordance with the applicable law.
W. For projects with potential impacts to fish spawning or migration, no work shall occur within fish spawning or migration timelines (i.e., windows) unless otherwise approved in writing by the Michigan Department of Natural Resources, Fisheries Division.
X. Work to be done under authority of this permit is further subject to the following special instructions and specifications:
1. The 100-year floodplain elevation of the tributary to the Sturgeon River at the DNR trail crossing is
600.5 feet NAVD 88. All materials remaining upon completion of the project shall be relocated to outside of the 100-year floodplain.
2. The invert of the new culvert shall be recessed no greater than 2.0 feet into the stream bottom.
3. Riprap shall be installed such that it does not narrow up the stream or interfere with flows into or out of the culvert.
4. During work on the crossing, and until the site is stabilized, the stream shall be passed through a temporary channel. The temporary channel shall be completely stabilized with riprap placed over geotextile filter fabric prior to passing flow and maintained in good working condition until the culvert is installed and stabilized. Or, during work on the culvert, and until the site is stabilized, the stream shall be blocked off with clean stone and/or gravel bags and the water pumped around the crossing. Water shall be discharged into the watercourse with appropriate treatments to remove suspended particles and to dissipate energy. An extra pump shall be kept on site in the event of failure.
5. The placement of the new culvert and the initial placement of fill in the stream shall be done in the dry or in such a manner that all flow is immediately passed through the culvert. The major placement of fill shall be done in the dry or in still water where erosion and siltation will be minimized. The fill material used in this initial placement shall be washed gravel, coarse aggregate, or rock and shall be placed at both ends of the culvert above normal water level before backfill material is placed.
6. The culvert shall be installed to align with the center line of the existing stream at both the inlet and outlet ends, and must be buried below the stream bed to provide a natural channel substrate through the structure as shown on the approved plans.
7. Road fill side slopes terminating in the stream and any raw streambanks resulting from the construction shall be stabilized with temporary measures in accordance with appropriate Best Management Practices based on site conditions, and if necessary, may be riprapped extending above the ordinary high water mark, before or upon commencement of the permitted activity. Temporary stabilization measures shall be maintained until permanent measures are in place.
8. All other road fill slopes, ditches, and other raw areas draining directly to the stream may be protected with riprap, sod and/or seed and mulch as may be necessary to provide effective erosion protection.
The placement of riprap shall be limited to the minimum necessary to ensure proper stabilization of the side slopes and fill in the immediate vicinity of the structure.
9. If the project, or any portion of the project, is stopped and lies incomplete for any length of time (other than that encountered in a normal work week) every precaution shall be taken to protect the incomplete work from erosion, including the placement of temporary gravel bag riprap, temporary seed and mulch, or other acceptable temporary protection.
Brenda Rebitzke, US Forest Service 4 WRP031521 v.1
10. No work shall be done in the stream during periods of above-normal flows except as necessary to prevent erosion.
11. The permittee is responsible for acquiring all necessary easements or rights-of-way before commencing any work authorized by this permit. All construction operations relating to or part of this project shall be confined to the existing right-of-way limits or other acquired easements.
12. Authority granted by this permit does not waive permit or program requirements under Part 91 of the NREPA or the need to acquire applicable permits from the CEA. To locate the Soil Erosion Program Administrator for your county, visit www.mi.gov/eglestormwater and select "Soil Erosion and Sedimentation Control Program" under "Related Links."
13. The authority to conduct the activity as authorized by this permit is granted solely under the provisions of the governing act as identified above. This permit does not convey, provide, or otherwise imply approval of any other governing act, ordinance, or regulation, nor does it waive the permittee's obligation to acquire any local, county, state, or federal approval or authorization necessary to conduct the activity.
14. No fill, excess soil, or other material shall be placed in any wetland, floodplain, or surface water area not specifically authorized by this permit, its plans, and specifications.
15. This permit does not authorize or sanction work that has been completed in violation of applicable federal, state, or local statutes.
16. The permit placard shall be kept posted at the work site in a prominent location at all times for the duration of the project or until permit expiration.
17. This permit is being issued for the maximum time allowed and no extensions of this permit will be granted. Initiation of the construction work authorized by this permit indicates the permittee's acceptance of this condition. The permit, when signed by EGLE, will be for a five-year period beginning on the date of issuance. If the project is not completed by the expiration date, a new permit must be sought.
Issued By:
Sean Soucy Marquette District Office Water Resources Division 906-250-0588 cc: Nahma Township Clerk Delta CEA Rob Katona, DNR Ericka Malone, OHM Advisors Linda Hansen, EGLE
DESIGN AND CONSTRUCTION DIVISION
C H
IC
A
G O
M
IL
W A
U K
E E
L A
K E
M
IC
H
IG
A N
D E
T R
O
IT
L A
K E
H U
R O
N
S A
U L
T S
T E
M A
R
IE
M A
R Q
U E
T T
E
H O
U G
H T
O N
L A
K E
S U
P E
R
IO
R
D U
L U
T H
M
IN
N E
A P
O L
IS
G R
E E
N B
A Y
E S
C A
N A
B A
T R
A V
E R
S E
C
IT
Y
G R
A N
D R
A P
ID
S L
A N
S
IN
G
P R
O
JE
C T
LO
C
A T
IO
N
A R
E A
L O
C A
T
IO
N M
A P
G E
N E
R A
L N
O T
E S
1.
G E
N E
R A
L N
O
TE
S A
P P
LY
T
O A
LL
D
R A
W
IN
G S
2.
E X
C E
P T
W H
E R
E O
TH
E
R W
IS
E
IN
D
IC
A
TE
D
O N
T H
E S
E P
LA
N
S , O
R
IN
T H
E C
O N
TR
A
C T
D O
C U
M E
N
TS
A N
D S
P E
C
IF
IC
A
TI
O
N S
C O
N
TA
IN
E
D H
E R
E
IN
A
LL
M
A
TE
R
IA
LS
A
N D
W O
R K
M A
N S
H
IP
S H
A
LL
B E
A C
C O
R D
IN
G
T O
T H
E M
IC
H
IG
A
N D
E P
A R
TM
E
N T
O F
TR
A
N S
P O
R
TA
TI
O
N S
TA
N
D A
R D
S P
E C
IF
IC
A
TI
O N
S F
O R
C O
N S
TR
U
C
TI
O N
, 2
E
D
IT
IO
N
3.
D O
N O
T S
C A
LE
D
R A
W
IN
G S
A
N Y
D
IM
E N
S
IO
N A
L
IN
F O
R M
A
TI
O N
R E
Q U
IR
E
D W
H
IC
H
IS
N O
T
IN
D
IC
A
TE
D O
N D
R A
W
IN
G D
IM
E
N S
IO
N
S
TR
IN
G
S S
H A
LL
B
E O
B
TA
IN
E
D F
R O
M T
H E
E N
G
IN
E E
R
4.
C
O N
TR
A
C
TO
R S
H A
LL
V
E R
IF
Y
A
LL
E X
IS
TI
N G
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S
IF
D
IS
C
R E
P A
N C
IE
S
A R
E F
O U
N D
, N O
TI
F
Y E
N G
IN
E
E R
B E
FO
R
E P
R O
C E
E D
IN
G
W
IT
H W
O R
K
5.
C
O N
TR
A
C
TO
R S
H A
LL
P
A Y
A
LL
P E
R M
IT
F
E E
S A
N D
F E
E R
E Q
U
IR
E D
F O
R A
N Y
P E
R M
IT
E
X
TE
N S
IO
N
S E
X C
E P
T
FO
R E
G
LE
/U S
A C
E J
O
IN
T P
E R
M
IT
O B
TA
IN
E D
B Y
T H
E E
N G
IN
E
E R
6.
C O
N
TR
A C
TO
R
S H
A
LL
M A
IN
TA
IN
T
H E
IM
M
E D
IA
TE
C O
N S
TR
U
C
TI
O N
S
IT
E
IN
A S
E C
U R
E
C
LE
A N
A N
D S
A
FE
M A
N N
E R
7.
P R
O
TE
C
TI
O N
C
O N
TR
A
C
TO
R S
S H
A
LL
B E
S O
LE
LY
R E
S P
O N
S
IB
LE
F
O R
T A
K
IN
G A
LL
S
TE
P
S N
E C
E S
S A
R Y
TO
P
R O
TE
C
T
TH
E P
U B
LI
C
F R
O M
IN
JU
R Y
A N
D A
D
JA
C E
N T
P R
O P
E R
TY
FR
O M
D A
M A
G E
D U
R
IN
G C
O N
S
TR
U C
TI
O
N A
S R
E Q
U
IR
E D
B Y
LO
C
A L
C O
D E
S
8.
R
E P
A
IR
A
LL
E
XI
S
TI
N G
C O
N S
TR
U
C
TI
O N
A F
FE
C
TE
D
B Y
N E
W W
O R
K T
O
IT
S O
R
IG
IN
A
L C
O N
D
IT
IO
N
9.
TH
E L
O C
A
TI
O N
O F
A
LL
P U
B
LI
C U
TI
LI
TI
E
S S
H O
W N
O N
T H
E S
E P
LA
N
S
IS
T A
K E
N F
R O
M
TH
E B
E S
T A
VA
IL
A B
LE
D
A
TA
. P U
R S
U A
N T
TO
A
C T
O F
TH
E
P .A
. O F
3, A
S A
C O
N D
IT
IO
N O
F
TH
IS
C
O N
TR
A
C T, N O
TI
C
E S
H A
LL
B
E G
IV
E
N T
O M
IS
S
D
IG
P R
IO
R
T O
U N
D E
R G
R O
U N
D W
O R
K T
O B
E P
E R
FO
R
M E
D
IN
A C
C O
R D
A N
C E
W
IT
H T
H
IS
C O
N
TR
A C
T.
P
H O
N E
0)
-7
1.
CI
VI
L
D R
A W
IN
G
I N
D E
X
C-
- N
OT
ES
C-
- L
EG
EN
D C-
- S
OI
L
BO
RI
NG
S B-
C-
- S
OI
L
BO
RI
NG
S B-
C-
- S
OI
L
BO
RI
NG
S B-
C-
- R
EM
OV
AL
S
- S
O
UT
H
SI
TE
C-
- P
RO
PO
SE
D
- S
OU
TH
S
IT
E C-
- S
OU
TH
C
RO
SS
IN
G
P R
OF
IL
ES
C-
- R
EM
OV
AL
S
- N
O
RT
H
SI
TE
C-
- P
RO
PO
SE
D
- N
OR
TH
S
IT
E C-
- N
OR
TH
C
RO
SS
IN
G
P
RO
FI
LE
S
DT
TI
TL
E
SH
EE
T
I C er tif y
Th at
T he se P la ns
W er e P re pa re d
U nd er M y D ire ct
S up er vi si on
P R
O
JE
C T
L O
C A
T
IO
N M
A P
OW
NE
R:
DE
PA
RT
M
EN
T
OF
N
AT
UR
AL
R
ES
OU
RC
ES
PA
RK
S
AN
D
RE
CR
EA
TI
ON
U
S-
N
OR
TH
M
AR
QU
ET
TE
, M I 4
PR
OJ
EC
T
CO
NT
AC
TS
6-
0-
R
OB
K
AT
ON
A, T
RA
IL
S
SP
EC
IA
LI
ST
6-
1-
J
EF
F
BA
RS
CH
, P
RO
JE
CT
D
IR
EC
TO
R
6-
0-
J
AS
ON
P
AS
CO
E, F
IE
LD
R
EP
EN
G
IN
EE
R:
OH
M A
DV
IS
OR
S
HA
NC
OC
K
ST
RE
ET
HA
NC
O
CK
, M
I 4
6.
2.
PR
OJ
EC
T
CO
NT
AC
T
- J
AR
ED
H
YR
KA
S, P E
DE
LT
A
CO
UN
TY
P R
O
JE
C T
L O
C A
T
IO
N N
O R
T H
W A
T E
R C
R O
S S
IN
G
R E
G
IO
N L
O C
A T
IO
N
M A
P
P R
O
JE
C T
L O
C A
T
IO
N
P R
O
JE
C T
L O
C A
T
IO
N S
O U
T H
W A
T E
R C
R O
S S
IN
G
C ou nt y
R o ad
N ah m a
U S
H ig h w a y