This is an unpriced Bill of Quantities (BOQ) template for the renovation of the LGF Bathroom Building at the U.S. Embassy compound in Juba, South Sudan, prepared by GPTech/Liberty Engineering and Construction Ltd for USAID. The document details quantities and specifications for demolition and renovation work across men's and women's bathrooms, but does not include pricing information as it appears to be a template for contractors to complete with their rates.

The scope of work includes demolition of existing fixtures (doors, windows, tiles, ceilings, sanitary fittings), and new installations including aluminum doors, steel windows, ceramic tiles, gypsum ceilings, and bathroom fixtures. Key components include removing and replacing floor/wall tiles, suspended ceilings, doors, windows, and sanitary fixtures in both men's and women's facilities. The document includes detailed measurements and specifications for materials such as ceramic Granito tiles, aluminum doors with specific dimensions, and gypsum PVC laminated ceiling tiles. The contractor must also provide various plans including a Construction Accident Prevention Plan, Quality Control Plan, and Project Execution Schedule within two weeks of site possession.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover

Project:PROPOSED RENOVATION OF
LGF BATHROOM BUILDING
EMBASSY COMPOUND
Client:USAID
BUILDER'S WORKS

BILLS OF QUANTITIES

Prepared by:GPTech / Liberty Engineering and Construction Ltd.
Bilpam Road (Near Ezentus) New Site, Juba, South Sudan
+211 (0)922 413 384 / +211 (0)929747373

&P of &N

Preliminaries

GENERAL PRELIMINARIES USD

A. PRICING OF ITEMS OF PRELIMINARIES AND PREAMBLES

Wherever in the Contractor’s priced Bills of Quantities no price appears against an item of Preliminaries or Preambles, the value of such item shall be deemed to be included in his prices for other items in the bills of Quantities.

B. ABBREVIATIONS AND DEFINITIONS

Throughout these Bills, units of measurement and terms are abbreviated and shall be interpreted as follows:

mm Shall mean millimetre lm shall mean linear metre sm shall mean square metre kg shall mean kilogramme

no. shall mean number

C. ABBREVIATIONS AND DEFINITIONS (CONTD.)

‘As described’ shall mean as described in these Bills of Quantities.

‘As before described’ shall mean in all respects as described in a previous item.

“Approved” Shall mean approved by USAID

“As directed” Shall mean as directed by USAID

D. PROJECT EXECUTION SCHEDULE (PES)

The Contractor shall allow for providing, within two weeks of the date for possession of the site and in agreement with USAID a “Programme of Works” for the whole of the works, in such form and details as USAID shall reasonably describe. One copy shall be forwarded to USAID and a further copy shall be retained on the site on which the progress shall be recorded by the Contractor. Should any circumstances arise affecting the programme or progress, the programme shall be modified as necessary and USAID informed. - 0

E. CONSTRUCTION ACCIDENT PREVENTION PLAN (CAPP)

The contractor shall develop a detailed accident prevention plan for all the works associated with the contract thereof. - 0

Ditto for Fall protection and Prevention Plan (Part of CAPP) - 0

Ditto for Heat Stress Plan (Part of CAPP) - 0

Ditto for Activity Hazard Analysis (Part of CAPP) - 0

Ditto for general Emergency Plan (Part of CAPP) - 0

F. PLANT, TOOLS AND VEHICLES

Allow for providing all scaffolding, plant, tools and vehicles required for the works except insofar as may be stated otherwise herein and except for such items specifically and only required for the use of the nominated sub-contractors as described herein. No timber used for scaffolding, formwork or temporary works of any kind shall be used afterwards in the permanent work. - 0

G. TRANSPORT

Allow for transportation of workmen, materials, etc. to and from the site at such hours and by such routes as may be permitted by the competent authorities. - 0

H MATERIALS AND WORKMANSHIP

All materials and workmanship used in the execution of the works shall be of the best quality and description unless otherwise described.
The Contractor shall order all materials to be obtained immediately the Contract is signed to ensure that they are on site when required for use in the works.- 0

I STORAGE OF MATERIALS

The Contractor shall provide at his own risk and cost where directed on the site weatherproof lockup sheds for the safe storage and custody of materials for the works and for the use of workmen engaged thereon and shall remove such sheds make good damaging or disturbed surfaces upon completion to the satisfaction of USAID. - 0

J EXISTING PROPERTY

The Contractor shall take every precaution to avoid damage to all existing property including roads, cables, trees & shrubs , plants, drains and other services, and he will be held responsible for and shall make good all such damage arising from the execution of this contract at his own expense to the satisfaction of USAID. - 0

K WATER AND ELECTRICITY SUPPLY FOR THE WORKS

The Contractor shall provide at his own risk and cost all necessary water, electric light and power required for use in the works. - 0

L INSURANCE

The Contractor shall insure as required in conditions of the Contract. - 0

M QUALITY CONTROL PLAN

The Contractor shall develop a detailed quality management plan and quality check forms for all the items as stipulated in the Bill of Quantities. - 0

N REMOVAL OF RUBBISH, etc.

Remove all rubbish and debris from the buildings and site as it accumulates and at completion of the works and remove all plant, scaffolding and unused materials at completion. - 0

GENERALTOTAL CARRIED- 0
PRELIMINARIESTO GRAND SUMMARY

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Prelims-&P &P of &N

Demolitions_Cover

DEMOLITIONS

59
10
10040
0
0
ADD channel here
0
A89901450
0
0
0
3
0
0
0
0
0
0
0
0
0
0

Demolitions

ITEMDESCRIPTIONQtyUnitRate (USD)Amount (USD)
BUILDER'S WORKS - DEMOLITIONS & DOWNTAKINGS materials arising from DEMOLITIONS & DOWNTAKINGS shall be

the property of USAID. The materials shall be transported/stored as per USAID's directives and all remaining debris shall be removed from site by the Contractor.

Note
ELEMENT NO.1
MEN'S TOILETS

A Remove existing aluminium doors overall size 880 x 2260mm complete with frame and ironmongery 1.00 no - 0 - 0

B Ditto but size, 900 x 1950mm 1.00 no - 0 - 0

C Ditto but size, 790 x 1950mm 2.00 no - 0 - 0

D Ditto but size, 820 x 1950mm 2.00 no - 0 - 0

E Ditto but size, 820 x 1950mm 1.00 no - 0 - 0

F Remove existing wooden doors overall size 870 x 1790mm complete with frame and ironmongery 5.00 no - 0 - 0

G Remove existing glazing and aluminium panels in the steel windows overall size 570 x 1200mm complete with frame and ironmongery 1.00 no - 0 - 0

H Ditto, Size 3200 x 600mm 2.00 no - 0 - 0

I Remove existing plywood ceiling including lights where they occur complete with wiring and piping. 48.05 sm - 0 - 0

J Remove existing suspended gypsum ceiling in decorative 600mm x 600mm wide including lights where they occur complete with wiring and piping . 26.10 sm - 0 - 0

K Remove existing 330 x 330 ceramic floor tiles including 50mm thick floor screed base and existing skirting and make good all disturbed areas in preparation for installation of new floor screed and tiles (measured separately) 30.53 sm - 0 - 0

L Ditto but size, 300 x 300 38.04 sm - 0 - 0

M Remove existing 200 x 300 ceramic wall tiles including 50mm thick floor screed base and existing skirting and make good all disturbed areas in preparation for installation of new floor screed and tiles (measured separately) 109.61 sm - 0 - 0

N Remove existing roofing sheets from the entire building including the roof truss members (measured separately) 150.52 sm - 0 - 0

O Remove all the existing steel roof trusses from the entire facility. 1.00 ls - 0 - 0

P Removal all the extract fans 5.00 no - 0 - 0

Q Remove existing sanitary fittings from existing washrooms: Wash hand basin - 4no.; Water closet, complete - 5 no. ; Urinals -4no .; Shower heads - 6no.; Floor trap - 8no.; Hand dryer - 1no.; Air freshner - 2no.; Soap dispensors -1no. 1.00 Ls - 0 - 0

ELEMENT NO.1 - SUB TOTAL - 0

ELEMENT NO.2
WOMEN'S TOILETS

A Remove existing aluminium doors overall size 880 x 2260mm complete with frame and ironmongery 1.00 no - 0 - 0

B Ditto but Size, 880 x 1990mm 1.00 no - 0 - 0

C Remove existing wooden doors overall size 870 x 1990mm complete with frame and ironmongery 3.00 no - 0 - 0

D Ditto but Size, 850 x 1990mm 1.00 no - 0 - 0

E Ditto but Size, 800 x 1990mm 1.00 no - 0 - 0

F Remove glazing and aluminium panels in the steel windows overall size 600 x 1200mm complete with frame and ironmongery 1.00 no - 0 - 0

G Ditto but Size, 3170 x 580mm 1.00 no - 0 - 0

H Ditto but Size, 3180 x 600mm 1.00 no - 0 - 0

I Remove existing suspended gypsum ceiling in decorative 600mm x 600mm wide including lights where they occur complete with wiring and piping . 25.92 sm - 0 - 0

J Remove existing 300 x 300 ceramic floor tiles including 50mm thick floor screed base and existing skirting and make good all distrubed areas in preparation for installation of new floor screed and tiles (measured separately) 22.55 sm - 0 - 0

K Remove existing 300 x 200 ceramic wall tiles including 50mm thick floor screed base and existing skirting and make good all distrubed areas in preparation for installation of new floor screed and tiles (measured separately) 58.71 sm - 0 - 0

L Removal all the extract fans 2.00 no - 0 - 0

M Remove existing sanitary fittings from existing washrooms: Wash hand basin - 2no.; Water closet, complete - 3 no. .; Shower heads - 2no.; Floor trap - 4no.; Hand dryer - 1no.; Air freshner - 1no.; Soap dispensors -1no. and dispose off as directed on site. 1.00 Ls - 0 - 0

ELEMENT NO.2 - SUB TOTAL - 0

TOTAL FOR DEMOLITIONS & DOWNTAKINGS CARRIED TO GRAND SUMMARY - 0

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Demolitions-&P

Reno-Cover

BILL NO. 1
RENOVATIONS
BUILDER'S WORKS
59
10
10040
0
0
ADD channel here
0
A89901450
0
0
0
3
0
0
0
0
0
0
0
0
0
0

Renovations

ITEM DESCRIPTION Qty Unit Rate (USD) Amount (USD)

MEN'S BATHROOMS

ELEMENT NO. 1

DOORS

Aluminium Doors

A 880 x 2260 mm high anodized aluminium door in standard aluminium sections to approval hung to and including 100 x 50 x 2mm thick powder coated aluminium plugged frame all round: Frame comprising of 300mm high transome with 6mm clear glass while leaf comprising of 780 x 980mm top aluminium plates and 780 x 980mm bottom aluminium plates separated by 1No. transome including aluminium glazing beads. Cost to include door stopper, 'King' door closers, 300mm stainless steel door pull handle, locking system and other necessary accessories. 1.00 no - 0 - 0

B 900 x 1950 mm high anodized aluminium door in standard aluminium sections to approval hung to and including 100 x 50 x 2mm thick powder coated aluminium plugged frame all round: leaf divided into 2 parts comprising 800 x 600mm top panel with 6mm thick obscure sheet glass; 800 x 1000mm bottom aluminium plates separated by 1No. transome including aluminium glazing beads. Door leaf to be at +0.1m above finished floor level. Cost to include locking system and other necessary iron mongeries. 1.00 no - 0 - 0

C Ditto but Size; 790x 1950 mm 2.00 no - 0 - 0

D Ditto but Size; 860x 1950 mm 6.00 no - 0 - 0

E Ditto but Size; 820x 1950 mm 2.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 2

WINDOWS

Steel windows

Supply and install 6mm thick clear sheet glass and glazing with glass putty to existing steel frame (m/s). Cost to include replacements of lugs, hinges, window stays, handles where necessary Note

A 570 x 850mm high window comprising fixed and openable sash. 1.00 no - 0 - 0

B Ditto but 600 x 3200mm 2.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 3

UNDER COUNTER WALL

Wall finishes

Cement/sand (1:3) in:

A 15mm thick render prepared to receive new wall finish (m/s) 5.58 sm - 0 - 0

'SAJ' ceramic Granito wall tiles or other equal and approved

B 330 x 330 x 6mm thick tiles fixed with an approved adhesive on prepared render (m/s) 5.58 sm - 0 - 0

Louvered door

C 440 x 830 mm high anodized aluminium louvered door in standard aluminium sections to approval hung to and including 100 x 50 x 2mm thick powder coated aluminium plugged frame all round 0.73 sm - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 4

FINISHES

FLOOR FINISHES

Cement and sand (1:3) in

A 30mm thick screed finished to receive ceramic tiles (m/s) 68.57 sm - 0 - 0

'SAJ' ceramic Granito floor tiles or other equal and approved

B 330 x 330 x 6mm thick tiles fixed with approved adhesive 68.57 sm - 0 - 0

C 100 x 6mm skirting with rounded top; including labour for cutting and raking ceramic tiles 32.55 lm - 0 - 0

Carried to Collection - 0

WALL FINISHES

Cement/sand (1:3) in:

A 15mm thick render prepared to receive ceramic tiles internally (m/s) 109.61 sm - 0 - 0

'SAJ' ceramic Granito wall tiles or other equal and approved

B 330 x 330 x 6mm thick tiles fixed with an approved adhesive to prepared surfaces. 109.61 sm - 0 - 0

Internal Painting to all gent bathrooms

C Scrap off all visible flakes, blisters and open all hairline cracks, fill with appropriate or equally approved filler to all internal wall surfaces ready to receive new paint. 169.15 sm - 0 - 0

D Apply one undercoat and two finishing coats of 1st grade silk vinyl paint of approved colour to all internal walls 169.15 sm - 0 - 0

Carried to Collection - 0

CEILING FINISHES

Acoustic ceiling

A Gypsum PVC laminated tiles (Dew drop 154) suspended ceiling comprising 600 x 600 x 15mm thick panels, laid on imported concealed ‘Z’ suspension system 500mm below slab, both panels and suspension FIRE RATED and panels to have guaranteed “SOUND ABSORPTION CO-EFFICIENT; or other equal and approved all as supplied an approved supplier 74.15 sm - 0 - 0

Carried to Collection - 0

COLLECTION

FLOOR FINISHES - 0

WALL FINISHES - 0

CEILING FINISHES - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 5

BATHROOM LOCKER PLATFORM -MEN'S BATHROOM 1

A Supply, mixing and pouring preapproved concrete for the indoor concrete slabs-locker platforms (+0.1m), C25 (1:1:2) with strength not less than 250kg/cm2. Including necessary slopes creation as indicated in the drawings formwork, rubber elastic expansion joints each <5m, vibrating and curing for not less than 14 days. 0.95 cm - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

WOMEN'S BATHROOM

ELEMENT NO. 1

DOORS

Aluminium Doors

A 880 x 2260 mm high anodized aluminium door in standard aluminium sections to approval hung to and including 100 x 50 x 2mm thick powder coated aluminium plugged frame all round: Frame comprising of 300mm high transome with 6mm clear glass while leaf comprising of 780 x 980mm top aluminium plates and 780 x 980mm bottom aluminium plates separated by 1No. transome including aluminium glazing beads. Cost to include door stopper, 'King' door closers, 300mm stainless steel door pull handle, locking system and other necessary accessories. 1.00 no - 0 - 0

B 880 x 1990 mm high anodized aluminium door in standard aluminium sections to approval hung to and including 100 x 50 x 2mm thick powder coated aluminium plugged frame all round: leaf divided into 2 parts comprising 780 x 600mm top panel with 6mm clear obscure glass;780 x 1000mm bottom aluminium plates separated by 1No. transome including aluminium glazing beads. Door leaf to be at +0.1m above finished floor level. Cost to include locking system and other necessary iron mongeries. 1.00 no - 0 - 0

C Ditto but Size; 870x 1990 mm 4.00 no - 0 - 0

D Ditto but Size; 800x 1990 mm 1.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 2

WINDOWS

Steel windows

Supply and install 6mm thick clear sheet glass and glazing with glass putty to existing steel frame (m/s). Cost to include replacements of lugs, hinges, window stays, handles where necessary

A 600 x 1200mm high window comprising fixed and openable sash 1.00 no - 0 - 0

B Ditto but size, 580 x 3170 mm 1.00 no - 0 - 0

C Ditto but size, 600 x 3180 mm 1.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 3

FINISHES

FLOOR FINISHES

Cement and sand (1:3) in

A 30mm thick screed finished to receive ceramic tiles (m/s) 23.00 sm - 0 - 0

'SAJ' ceramic Granito floor tiles or other equal and approved

B 330 x 330 x 6mm thick tiles fixed with an approved adhesive to prepared surfaces. 23.00 sm - 0 - 0

C 100 x 6mm skirting with rounded top; including labour for cutting and raking ceramic tiles 10.25 lm - 0 - 0

Carried to Collection - 0

WALL FINISHES

Cement/sand (1:3) in:

A 15mm thick render prepared to receive ceramic tiles internally (m/s) 59.00 sm - 0 - 0

'SAJ' ceramic Granito wall tiles or other equal and approved

B 330 x 330 x 6mm thick tiles fixed with an approved adhesive to prepared surfaces. 59.00 sm - 0 - 0

Internal Painting to WOMEN'S Bathroom

C Scrap off all visible flakes, blisters and open all hairline cracks, fill with appropriate or equally approved filler to all internal wall surfaces ready to receive new paint. 52.65 sm - 0 - 0

D Apply one undercoat and two finishing coats of 1st grade silk vinyl paint of approved colour to all internal walls 52.65 sm - 0 - 0

Carried to Collection - 0

CEILING FINISHES

Acoustic ceiling

A Gypsum PVC laminated tiles (Dew drop 154) suspended ceiling comprising 600 x 600 x 15mm thick panels, laid on imported concealed ‘Z’ suspension system 500mm below slab, both panels and suspension FIRE RATED and panels to have guaranteed “SOUND ABSORPTION CO-EFFICIENT; or other equal and approved all as supplied an approved supplier 26.00 sm - 0 - 0

Carried to Collection - 0

COLLECTION

FLOOR FINISHES - 0

WALL FINISHES - 0

CEILING FINISHES - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

WATER HEATER ROOM

ELEMENT NO. 1

DOORS

Grille door

A 900 x 1900mm high overall size mild steel plate single grill door comprising 50 x 25 x 3mm thick square hollow sections external framework and infilled 25 x 25 x 3mm RHS in 150 x 150 grid with 150mm wide x 16 gauge steel cover plate at the middle, 12mm diameter steel bolts and all other necessary ironmongeries to top and bottom including priming with red lead oxide after fabrication. 1.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 2

WALL FINISHES

Internal Painting to Water Heater room

A Scrap off all visible flakes, blisters and open all hairline cracks, fill with appropriate or equally approved filler to all internal wall surfaces ready to receive new paint. 11.19 sm - 0 - 0

B Apply one undercoat and two finishing coats of 1st grade silk vinyl paint of approved colour to all internal walls 11.19 sm - 0 - 0

External Painting to Water Heater room

C Scrap off all visible flakes, blisters and open all hairline cracks, fill with appropriate or equally approved filler to all external wall surfaces ready to receive new paint. 10.22 sm - 0 - 0

D Apply one undercoat and two finishing coats of 1st grade weather guard paint of approved colour to all external walls 10.22 sm - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

COMMON ITEMS

ELEMENT NO. 1

FINISHES

External Painting to MEN'S Bathroom 1, MEN'S Bathroom 2 and WOMEN'S Bathroom

A Scrap off all visible flakes, blisters and open all hairline cracks, fill with appropriate or equally approved filler to all external wall surfaces ready to receive new paint. 221.68 sm - 0 - 0

B Apply one undercoat and two finishing coats of 1st grade weather guard paint of approved colour to all external walls 221.68 sm - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 2

ROOFING
Roof struture -A refers to roofing for MEN'S bathroom facility 1Notes

Roof struture -B refers to roofing for Changing room Notes

Roof struture -C refers to roofing for MEN'S bathroom facility 2 and WOMEN'S bathroom facility Notes

Roof struture -D refers to roofing for water heater room Notes

MASONRY WORKS

Walling
Alay 200mm thick Solid concrete block walling jointed in cement/sand (1:4) mortar .with hoop iron at every alternate course to fill all gable spaces in roofs A, B, C and D53.51sm- 0- 0
Finishes
B12mm thick plaster to walls trowelled smooth internally using cement/sand (1:3) mortar107.03sm- 0- 0

C Prepare and apply one undercoat and two finishing coats of 1st grade silk vinyl paint of approved colour to all internal walls 53.51 sm - 0 - 0

D Prepare and apply one undercoat and two finishing coats of 1st grade weather guard paint of approved colour to all external walls 53.51 sm - 0 - 0

Carried to Collection - 0

ROOF STRUCTURE - A

Wall plates
ARHS 80x40x3mm21.60lm- 0- 0
Steel roof truss
BRHS 80X40X3mm ties, struts …etc complete76.74lm- 0- 0
Purlins
CRHS 60x40x3mm50.40lm- 0- 0
Steel fascia plate
DSteel fascia plate30.17lm- 0- 0
Roof covering
ESupply and install Gauge 26 GI sheet iron sheets roof covering of approved color and brand.56.15sm- 0- 0
Roof Draiange
FSupply and install 150mm PVC Semi-circle/round eave gutters including all necessary accessories clips, corners, out lets, connectors, etc.8.40lm- 0- 0

G Supply and fix 110mm dia PVC rain water down pipes. Cost to include elbows, clips …etc complete 10.80 lm - 0 - 0

Eave Ceiling
HSupply and install perofrated aluminium suspended ceiling comprising 600 x 600 x 15mm thick panels laid on grid system.18.10sm- 0- 0

Carried to Collection - 0

ROOF STRUCTURE - B

Wall plates
ARHS 80x40x3mm9.81lm- 0- 0
Steel roof truss
BRHS 80X40X3mm ties, struts …etc complete57.55lm- 0- 0
Purlins
CRHS 60x40x3mm26.82lm- 0- 0
Steel fascia plate
DSteel fascia plate22.31lm- 0- 0
Roof covering
ESupply and install Gauge 26 GI sheet iron sheets roof covering of approved color and brand.29.88sm- 0- 0
Roof Draiange
FSupply and install 150mm PVC Semi-circle/round eave gutters including all necessary accessories clips, corners, out lets, connectors, etc.4.47lm- 0- 0

G Supply and fix 110mm dia PVC rain water down pipes. Cost to include elbows, clips …etc complete 9.40 lm - 0 - 0

Eave Ceiling
HSupply and install perofrated aluminium suspended ceiling comprising 600 x 600 x 15mm thick panels laid on grid system.5.36sm- 0- 0

Carried to Collection - 0

ROOF STRUCTURE - C

Wall plates
ARHS 80x40x3mm27.75lm- 0- 0
Steel roof truss
BRHS 80X40X3mm ties, struts …etc complete119.22lm- 0- 0
Purlins
CRHS 60x40x3mm35.76lm- 0- 0
Steel fascia plate
DSteel fascia plate36.62lm- 0- 0
Roof covering
ESupply and install Gauge 26 GI sheet iron sheets roof covering of approved color and brand.82.13sm- 0- 0
Roof Draiange
FSupply and install 150mm PVC Semi-circle/round eave gutters including all necessary accessories clips, corners, out lets, connectors, etc.10.45lm- 0- 0

G Supply and fix 110mm dia PVC rain water down pipes. Cost to include elbows, clips …etc complete 10.80 lm - 0 - 0

Eave Ceiling
HSupply and install perofrated aluminium suspended ceiling comprising 600 x 600 x 15mm thick panels laid on grid system.21.97sm- 0- 0

Carried to Collection - 0

ROOF STRUCTURE - D

Wall plates
ARHS 80x40x3mm5.40lm- 0- 0
Purlins
BRHS 60x40x3mm9.78lm- 0- 0
Steel fascia plate
CSteel fascia plate11.32lm- 0- 0
Roof covering
DSupply and install Gauge 26 GI sheet iron sheets roof covering of approved color and brand.9.78sm- 0- 0
Roof Draiange
ESupply and install 150mm PVC Semi-circle/round eave gutters including all necessary accessories clips, corners, out lets, connectors, etc.2.66lm- 0- 0

F Supply and fix 110mm dia PVC rain water down pipes. Cost to include elbows, clips …etc complete 3.31 lm - 0 - 0

Carried to Collection - 0

COLLECTION

MASONRY WORKS - 0

ROOF STRUCTURE - A - 0

ROOF STRUCTURE - B - 0

ROOF STRUCTURE - C - 0

ROOF STRUCTURE - D - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 3

BUILDER’S WORK IN CONNECTION WITH NOMINATED SUB-CONTRACTORS

MECHANICAL INSTALLATIONS

A Allow provision for wall chasing or floor and making good after installations of pipes 1.00 Ls - 0 - 0

ELECTRICAL INSTALLATIONS

B Allow provision for wall chasing and making good after installations of switches, sockets, adaptable boxes, DB, mitre boards, extract fans..etc 1.00 Ls - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

ELEMENT NO. 4

BATHROOM LOCKERS

A Supply and install steel lockers size; 90x45x1800mm as directed 29.00 no - 0 - 0

TOTAL CARRIED TO SUMMARY OF BILL NO.1 - 0

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Builder's Works - &P

Bill 1

USD
BILL NO. 1

SUMMARY

MEN'S BATHROOM 1 & 2

ELEMENT NO. DESCRIPTION

1DOORS- 0
2WINDOWS- 0
3UNDER COUNTER WALL- 0
4FINISHES- 0
5BATHROOM LOCKERS- 0
SUBTOTAL- 0

WOMEN'S BATHROOM

ELEMENT NO. DESCRIPTION

1DOORS- 0
2WINDOWS- 0
3FINISHES- 0
SUBTOTAL- 0

WATER HEATER ROOM

ELEMENT NO. DESCRIPTION

1DOORS- 0
2FINISHES- 0
SUBTOTAL- 0

COMMON ITEMS

ELEMENT NO. DESCRIPTION

1FINISHES- 0
2ROOFING- 0
3BUILDER’S WORK IN CONNECTION WITH NOMINATED SUB-CONTRACTORS- 0
4BATHROOM LOCKERS- 0
SUBTOTAL- 0
BILL NO. 1 TOTAL CARRIED
REFURBISHMENTS TO GRAND SUMMARY- 0

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Bill-&P

Elec-Cover

Project:PROPOSED RENOVATION OF
LGF BATHROOM BUILDING
EMBASSY COMPOUND
Client:USAID
ELECTRICAL INSTALLATIONS
BILLS OF QUANTITIES
Prepared by:GPTech / Liberty Engineering and Construction Ltd.
Bilpam Road (Near Ezentus) New Site, Juba, South Sudan
+211 (0)922 413 384 / +211 (0)929747373

Electrical Works

ITEM No.DESCRIPTIONUNITQTYRATE (USD)AMOUNT (USD)
ELECTRICAL INSTALLATIONS

A LIGHTING FITTINGS, POWER WIRING & CONDUITING

KINDLY NOTE:All LED samples must be tested and approved before installation including motion / occupancy sensors.

All LED lighting products must have a minimum warranty period of Three (3) years or more.

All LED lighting products must be accompanied with relevant data sheets and lab test reports

Supply, Deliver, Install, Set to Work and Commission the Following.

1.01 Lighting point completely wired in 3x1.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG PVC conduits including all accessories for one way switching but excluding the switch and luminaire No. 26 - 0 - 0

1.02 10A one gang one way switch as MK or approved equivalent. No. 12 - 0 - 0

1.03 10A two gang one way switch as MK or approved equivalent. No. 2 - 0 - 0

1.04 PHILIPS SmartBright Wide Batten 220-240V IP65 4K | 6.5K | 600mm | 1200mm | 1200mm Emergency No. 18 - 0 - 0

1.05Dome Black Outdoor Small Outdoor Wall Bulkhead Light
Globe Type: 1 x E27 Max 10W LED Excluded, Width: 200mm, Height: 200mm, Depth: 100mm, Colour: Black, Material: Die Cast Aluminum; Glass, IP Rating: 44 e.g PhilipNo.8- 0- 0

1.06 13A SP RCD proetcted Shaver raw power socket point completely wired in 3x2.5mm² single core PVC insulated copper cables drawn in 20mm diameter HG PVC conduits including all accessories but excluding the switched socket outlet No. 3 - 0 - 0

1.07 Air conditioner power point completely wired in 3x4.0mm² single core PVC insulated copper cables drawn in 25mm diameter EMT conduits including all accessories but excluding the 20A DP fused switched connection unit, and running to the Indoor AC Units No 4 - 0 - 0

1.08 Hand dryer power points completely wired in 3x2.5mm² single core PVC insulated copper cables drawn in 25mm diameter EMT conduits complete with all accessories. No. 4 - 0 - 0

Sub Total -1 Carried Forward To summary page- 0
ITEM No.DESCRIPTIONUNITQTYRATE (USD)AMOUNT (USD)

B DISTRIBUTION BOARD, SUPPLY CABLE, ISOLATOR & OTHER ACCESSORIES

1.00 4 Ways 32A TPN power distribution board "A" complete with 32A tPN integral isolator but excluding the MCBs as Schneider Electric Acti 9 or approved equal No. 1 - 0 - 0

1.01 Sub-mains comprising of 4 core 6mm² PVC/PVC + 6mm² Earth cable insulated copper cables drawn in the conduit including all accessories and running from the SMP-LGF to Distribution Board "LGF" complete with cable glands. Lm 15 - 0 - 0

comprising of:
Outgoings:
1.0210A SP MCBNo4- 0- 0

1.03 20A SP MCB No 6 - 0 - 0

1.04 25A SP MCB No 2 - 0 - 0

Incomer:

1.05 32A TP MCB No 1 - 0 - 0

1.06 20A DP fused switched connection unit complete with neon indicator as MK and marked "AC" + AVS 30A Surge Protectve Device (sollak) No. 4 - 0 - 0

1.07 20A SPN isolator for the Sump Pump & Water Heater as Schneider or approved equivalent. No. 2 - 0 - 0

1.08 13A RCD Protected Shaver Socket outlet as MK or approved equivalent No. 3 - 0 - 0

1.09 Allow for earthing complete with all necessary earthing equipment and the earthing pit for the Lightning Protection System (LPS) No. 1 - 0 - 0

1.10 3x4.0mm² single core copper cables drawn in 25mm diameter EMT conduits, from the distribution board to Sump pump isolator. Lm 10 - 0 - 0

1.11 3x4.0mm² single core copper cables drawn in 25mm diameter EMT conduits, from the distribution board to the Water Heater isolator. Lm 15 - 0 - 0

Sub Total -2 Carried Forward To summary page - 0

ITEM No. DESCRIPTION UNIT QTY RATE (USD) AMOUNT (USD)

C TESTING AND COMMISSIONING

1.00 Allow for testing and commissioning of all installations to the satisfaction of the USAID engineer Ls 1 - 0 - 0

Sub Total -3 Carried Forward To summary page - 0

ITEM No. Sumary Page AMOUNT (USD)

1 Subt Total - 1: LIGHTING FITTINGS, POWER WIRING & CONDUITING - 0

2 Sub Total - 2: DISTRIBUTION BOARD, SUPPLY CABLE, ISOLATOR & OTHER ACCESSORIES - 0

3 Sub Total - 3: TESTING AND COMMISSIONING - 0

ITEM No. PRICE SUMMARY AMOUNT (USD)

1 Total Amount for Electrical Installations Brought Forward; ………………. - 0

SUB - TOTAL ITEMS 1 & 2 ABOVE: ………………………………………… - 0

TOTAL AMOUNT FOR ELECTRICAL SERVICES WORKS CARRIED TO GRAND SUMMARY - 0

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Electrical Works-&P

Mech_Cover

Project:PROPOSED RENOVATION OF
LGF BATHROOM BUILDING
EMBASSY COMPOUND
Client:USAID
PLUMBING & HVAC INSTALLATIONS
BILLS OF QUANTITIES
Prepared by:GPTech / Liberty Engineering and Construction Ltd.
Bilpam Road (Near Ezentus) New Site, Juba, South Sudan
+211 (0)922 413 384 / +211 (0)929747373

Mechanical Works

S/NDESCRIPTIONQTYUNITRATEAMOUNT
(USD)(USD)
PLUMBING, DRAINAGE, SANITARY FITTINGS AND FIRE PROTECTION
ELEMENT No.1
PLUMBING
Supply, deliver and install Polypropylene Random (PP-R) PN-20 pipeworks and accessories.Notes

PPR-PN 20 PIPING

PPR-PN 20 Piping-Water Supply
A20mm PPR PN 20 pipe185.00LM- 0- 0

B 25mm PPR PN 20 pipe 35.00 LM - 0 - 0

C 32mm PPR PN 20 pipe 12.00 LM - 0 - 0

Elbows/Bends
D20mm diameter elbows/bends60.00No.- 0- 0

E 25mm diameter elbows/bends 3.00 No. - 0 - 0

F 32mm diameter elbows/bends 2.00 No. - 0 - 0

G 20mm female threaded elbow 14.00 No. - 0 - 0

Tees
H25x20x25mm reducer15.00No.- 0- 0

I 20x25x20mm ditto 16.00 No. - 0 - 0

J 32mm 2.00 No. - 0 - 0

K 25mm 3.00 No. - 0 - 0

L 20mm 6.00 No. - 0 - 0

Reducers
M32mm x 25mm2.00No.- 0- 0
Isolating Valves
N25mm diameter approved medium pressure screw down full way non-rising stem wedge gate valve to BS 5154 PN 20 for series B rating, with wheel and head joints to steel tubing and complete with round male threaded transition fittings. The gate valve to be as PEGLER or approved equivalent.4.00No.- 0- 0

O 20mm diameter approved medium pressure screw down full way non-rising stem wedge gate valve to BS 5154 PN 20 for series B rating, with wheel and head joints to steel tubing and complete with round male threaded transition fittings. The gate valve to be as PEGLER or approved equivalent. 6.00 No. - 0 - 0

Angle valves
P15mm diameter chrome plated angle valves16.00No.- 0- 0

Total Cost Carried to Collection - 0

ELEMENT No.2

INTERNAL DRAINAGE

Supply, deliver and install the following in key “Terrain” or equal and approved UPVC Heavy gauge soil and waste system. Allow for all the various sizes of adaptor, connectors, sockets, holder bats, clips etc. not measured but required for the satisfactory functioning of the system.
Piping
A50mm ditto86.00LM- 0- 0

B 110mm ditto 50.00 LM - 0 - 0

uPVC fittings
C50mm bend48.00No.- 0- 0

D 110mm bend 3.00 No. - 0 - 0

E 45O 50mm double wye fitting 10.00 No. - 0 - 0

F 45O 110mm double wye fitting 15.00 No. - 0 - 0

Accessories
G110mm bend WC connector8.00No.- 0- 0

H 32mm bottle 'p' trap 6.00 No. - 0 - 0

I 40mm tubular 'p' trap 4.00 No. - 0 - 0

J 50mm access plug 9.00 No. - 0 - 0

K 110mm acces plug 5.00 No. - 0 - 0

Total Cost Carried to Collection - 0

ELEMENT No.3

SANITARY FITTINGS AND ACCESSORIES

Handspray(Arabic Shower)
AChrome plated flexible hands spray complete with wall bracket and angle valve.8.00No.- 0- 0
Urinal Bowl
BUrinal bowl in white color of size 450 x 685mm with built in spreader and concealed waste trap complete with stainless steel fixing bolts and caps. The urinal bowl to be as "Milano" or as approved equal.4.00No.- 0- 0
Urinal Bowl Divider
CCeramic urinal bowl divisions separating the above described urinal bowls fixed firmly on the wall. The fittings shall be as equally approved.2.00No.- 0- 0
Robe Hook
DRobe hook in Stainless steel to be mounted by concealed screws to wall wedges.8.00No.- 0- 0
Hand Dryer
E"Mediclinic Optima" sensor operated hand dryer made of steel white epoxy finish model "M99A" and of size 302 x 260 x 150mm with a 1.5KW heating element.3.00No.- 0- 0
Wash hand basin
FUnder counter wash hand basin size 560 x 445mm with one tap holes, 32mm diameter chrome plated chain waste, chain stay hole, chrome plated angle valve and heavy duty plastic bottle trap (32mm 'P' trap) with 75mm seal as Milano or equally approved.2.00No.- 0- 0

G Wall mounted half pedestal wash hand basin size 560 x 445mm with one tap holes, 32mm diameter chrome plated chain waste, chain stay hole, chrome plated angle valve and heavy duty plastic bottle trap (32mm 'P' trap) with 75mm seal as Milano or equally approved. 4.00 No. - 0 - 0

Toilet Roll Holder
HStainless steel toilet roll holder surface mounted8.00No.- 0- 0
Liquid Soap Dispenser
IMediclinc manual wall-mounted liquid soap dispenser made of AISI 304 stainless steel, white epoxy finish. The Liquid soap dispenser shall have a capacity of 1.5 litres.3.00No.- 0- 0
Towel Rail
JChrome plated 32mm diameter towel rail of size 82 x 650mmlong screwed to wall and complete with wall plates.8.00No.- 0- 0
WC pan
KClose coupled wash-down WC suite comprising WC bowl , 6 liters close coupled cistern with bottom supply, freefall plastic syphon, 15mm microwave High pressure ball valve with whisperflo refill unit, 20mm bottom overflow, isovalve servicing valve and close coupling fitment and fittings, chrome plated side lever, heavy duty seat and cover with stainless steel hinges . with dual flush action to be as "Milano" or equal and approved.8.00No.- 0- 0
Shower Fitting
LShower fittings comprising of 15mm stop cock as Vado, mixer connection,adjustable hand held hose shower and chrome plated shower arm or equal and approved.8.00No.- 0- 0
Washbasin Tap
MChrome plated non-conculsive time delay press action pillar tap to match wash basins6.00No.- 0- 0
Floor drain
NFloor drain, installed on plastic pipes, shall conform to normal building European Standard; body shall be of shallow type with 5cm minimum water trap with removable PVC water seal for possible maintenance and cleaning. PVC cover to be 100mmx100mm.8.00No.- 0- 0

O Floor clean out complete with tile matching coloured cover or approved color 8.00 No. - 0 - 0

P 100mm Rodding eye cover 3.00 No. - 0 - 0

Q 50mm Rodding eye cover 5.00 No. - 0 - 0

Vent Cowl
R100mm3.00No.- 0- 0

S 50mmm 7.00 No. - 0 - 0

Mirror
T600 X 800mm high quality led mirror with strip illuminated design as Aliglaziers CODE: LD112 screwed to wall with 3No. Chrome plated dome screws complete with 5mm thick foam layer back rest.6.00No.- 0- 0
Toilet Brush with Holder
UToilet Brush with Holder, Polished, Resists daily scratches, corrosion, and tarnishing Rustproof: Chrome finish as "Tali " or approved equivalent8.00No.- 0- 0

Total Cost Carried to Collection - 0

ELEMENT No.4

PORTABLE FIRE PROTECTION EQUIPMENT

Supply, delivery and installation of portable fire protection equipment with initial fill complete with all the necessary mounting accessories.
A4.5kg carbon dioxide gas extinguisher2.00No.- 0- 0

B 9kg dry powder extinguisher 2.00 No. - 0 - 0

Total Cost Carried to Collection - 0

COLLECTION

1 Total for Element No.1 - 0

2 Total for Element No.2 - 0

3 Total for Element No.3 - 0

4 Total for Element No.4 - 0

Total Cost For Plumbing, Drainage, Sanitary fittings and Fire Protection - 0

HAVC INSTALLATIONS

EXTRACT FAN
G450mm diameter external weather louvre in stainless steel suitable for duct mounting and to be provided with wire mesh insect/bird screen.8.00No.- 0- 0

H Uinstall bad unit and dispose to a location as directed by USAID Engineer. 1.00 No. - 0 - 0

Total for HVAC Installations…………….. - 0

TESTING AND COMMISSIONING
AAllow for testing and commissioning of the whole air conditioning installation to the satisfaction of the engineer1.00ls- 0- 0

Total for Testing and Commissioning…………….. - 0

SUMMARY
1Total for Plumbing & Drainage- 0

2 Total for HVAC Installations - 0

3 Total for Testing and Commissioning - 0

GRAND TOTAL FOR PLUMBING & HVAC - 0

&"-,Italic"GPTech / Liberty Engineering and Construction Ltd. Plumb-HVAC-&P

Grand Summary

Amount (Usd)
PROPOSED RENOVATION OF LGF BATHROOM BUILDING
GRAND SUMMARY
ITEM
1. - GENERAL PRELIMINARIES- 0
2. - DEMOLITIONS- 0
3. BILL NO. 1 - BUILDER'S WORKS- 0
4. BILL NO. 2 - ELECTRICAL WORKS- 0
5. BILL NO. 3 - MECHANICAL WORKS- 0
SUB TOTAL- 0
6. - 10% PROVISIONAL SUM- 0
7. - 5% CONTINGENCY- 0
- 0
GRAND TOTAL

Signature ………………………………………………………………………………………………………

Date …………………………………………………………………………………………………………..

Full Name: ……….……………………………….............…………………………………………………

Title: ……….…………………………………............……………………………………………………………

Company Name: ……….………………….....………………………………………………………………

Address: ………..............................................…………………………………………………